L3 COMMISSIONING TEST SCRIPT

"
st
(Start-up Testing /SAT)

Te
m
te
ys
FOR

lS
tro
on
C
CPM CONTROL SYSTEM TEST
PM
C
3,
xL
rC
fo
e
lin
de
ui

Air Conditioning & Mechanical Ventilation


"G

SYSTEM
Document: L3 Commissioning Test Script

"
st
Service: ACMV System

Te
System: CPM Control System Test

m
te
Reference: Commissioning Plan Rev.2

ys
Mechanical Specification; M4-20
Revision:

lS
tro
Company:
on
C
Name:
PM

Signature:
C

Date:
3,

Approval:
xL

Name:
rC

Signature:
fo

Date:
e
lin

Approval
Status:
de
ui
"G

Page | 2
Document Control Sheet

Contract Number:

"
st
Contract Name:

Te
Client:

m
Project Location:

te
Document Reference: Chiller Plant Management System SoO

ys
Document Description:

lS
Prepared By:

tro
Checked By:

Approved By: on
C
PM

Rev: By: Date: Reason:


C
3,
xL
rC
fo
e
lin
de
ui
"G

Page | 3
Contents

Table of Contents
1.0 Introduction ...................................................................................................................................... 5

"
st
2.0 Test Instrumentation / Tools Required ............................................................................................. 5

Te
3.0 Reference Standards ......................................................................................................................... 5
4.0 Network & Control logic Configuration ............................................................................................ 5

m
5.0 Test Procedures. ............................................................................................................................... 6
6.0 Test Record Sheets............................................................................................................................ 8

te
APPENDIX A

ys
TEST REPORT SHEET

lS
tro
on
C
PM
C
3,
xL
rC
fo
e
lin
de
ui
"G

Page | 4
1.0 Introduction
The following test procedure has been prepared as the testing of CPM System Test for ABC DC project.

This is to be enhanced and developed by the Contractor. Additional testing and commissioning
requirements may be proposed by the Contractor as appropriate and agreed with the Project M&E

"
Engineer and Independent Testing and Commissioning Engineer.

st
Te
The tests proposed in this document are not exhaustive nor are they considered an acceptable
alternative to the current site tests performed by the manufacturer.

m
2.0 Test Instrumentation /Tools Required
All instrumentation used for the testing of the BMS, must have up to date (with at least 6

te
months validity) calibration certificates that is traceable to international standards.

ys
The following test instrumentation & tools will be required to undertake the tests detailed

lS
within this procedure;
 Calibrated multi-meters

tro
 General tightening or fastening tools (screw-drivers, battery drills, spanners etc.)
 Walkie-talkies.

on
 Test Jumper Cable. C
3.0 Reference Code /Standards
The following standards have been referenced when preparing these test procedures:
PM

 CIBSE Guide H – 2000 – Building Control Systems.


 BSRIA Commissioning of BEMS – AH 2/92.
 CIBSE Commissioning Code C – 2001 – Automatic Controls.
C

 Mechanical Specification /Commissioning Plan


3,

4.0 Network & Control logic Configuration


4.1 Prior to commencement of site works a full CPM network system architecture schematic
xL

and BMS approved point list must be provided.


rC

4.2 Flow charts detailing the control logic of each item of interfaced, controlled & metered
plant must be submitted & approved prior to function testing of CPM equipment controls. This
fo

should include, but not be, limited to, the following:


 Chillers
e

 Cooling Towers
lin

 CHWPs and CDWPs


 Buffer Tanks
de

 Motorized Valve, Bypass control Valve


 Weather Station
ui

 Make up Water System


"G

 Cooling Water Treatment system


 Vacuum Degassing
 Expansion Tanks
 CPM Sensors (Flow Meter, Water Temp, Water Pressure)
 Power Metering

Page | 5
5.0 Test Procedures.

5.1 Preparation
Carry out the following prior to starting SoO testing.

"
st
Complete the Pre-Commissioning Checklist and start-up procedures detailed in
“Template Test Sheets CPM Testing” each DDC/PLC (Direct Digital Controller /Programmable

Te
Logic Controller) panel prior to software installation and completed of Point-to-Point checking
and Point-to-GUI checking.

m
5.2 Functional Testing:

te
5.2.1 General Checks

ys
5.2.1.1 All the CPM Sub-Systems and associated devices are powered up, fully

lS
configured and have passed 100% of all relevant BMS Interface tests.

tro
5.2.1.2 All the CPM panels powered up, fully configured and passed supplier diagnostics.

on
5.2.1.3 Check the CPM database and graphics are complete to facilitate these tests.
C
5.2.1.4 Ensure the Trend Setup for the equipment under test has been completed.
PM

5.2.1.5 Confirm the control logic diagram and Sequence of operation equipment system (SoO)
has been approved by the Designer and Consultant.
C

5.2.1.6 Initiate a scheduled start up and shut down sequence for each piece of equipment or
3,

system and observe the equipment / system for the correct operation.
xL

5.2.1.7 Initiate a scheduled changeover of equipment if applicable on a daily or weekly


schedule.
rC

5.2.1.8 Confirm the required schedule start and stop times and enter into system
fo

5.2.1.9 Restart the equipment, initiate each type of alarm in the field and confirm the correct
e

operation /Changeover of system or equipment in the field.


lin

5.2.1.10 Confirm that the correct alarm message has been raised and issued by SMS /Pager.
de

5.2.1.11 Confirm if “mismatch” alarm is raised if command is different from status.


ui

5.2.1.12 Follow logic chart through for all alarms / failure combinations to confirm the correct
"G

operation of the equipment or system.

5.2.1.13 Check all graphic representations display correctly e.g., Alarm points turn red on
graphic, and that all equipment references are correct.

Page | 6
5.2.1.14 Print out alarm report for the equipment that has just been completed. Attach to
Record sheet.

5.2.1.15 Print out the trend report and attached to this test & commissioning report.

"
st
5.2.2 Main DDC/PLC Failure Test

Te
5.2.2.1 All the DDC/PLC panels powered up, fully configured and passed supplier diagnostics.

m
5.2.2.2 Check the CPM database and graphics are complete to facilitate these tests.

te
5.2.2.3 Ensure the Trend Setup for the equipment under test has been completed.

ys
5.2.2.4 Simulate Power Failure for Primary DDC/PLC and observed that redundancy function

lS
will switch over to Standby DDC/PCL and alarm takes place on the CPM Graphic Screen.

tro
5.2.2.5 Print out alarm report for the equipment that has just been completed. Attach to Record
sheet.

5.2.3 Network Switch Failure Test


on
C
5.2.3.1 All the Network Switch panels powered up, fully configured and passed supplier
diagnostics.
PM

5.2.3.2 Check the CPM database and graphics are complete to facilitate these tests.
C

5.2.3.3 Ensure the Trend Setup for the equipment under test has been completed.
3,

5.2.3.4 Simulate Power Failure for Network Core Switch-A and observed that redundancy
xL

function will switch over to Standby Network Core Switch-B and alarm takes place on
the CPM Graphic Screen.
rC

5.2.3.5 Print out alarm report for the equipment that has just been completed. Attach to Record
fo

sheet.
e

5.2.4 CPM SoO Logic Test


lin

The SoO Logic Test to prove system/Equipment logic control function as follow approved SoO
de

which has CPM control and monitoring. Some of system/Equipment which has Local control
and CPM monitoring only will be tested by Point-to-GUI, this should include but not limits to
ui

the following;
 Chillers
"G

 Cooling Towers
 CHWPs and CDWPs
 Buffer Tanks
 Motorized Valve, Bypass Control Valve

Page | 7
 Weather Station
 Make up water system
 Cooling Water Treatment system
 Vacuum Degassing’s

"
 Expansion Tanks

st
 CPM Sensors (Flow Meter, Water Temp, Water Pressure)

Te
 Power Metering

Detail SoO Logic

m
 Chiller plant efficiency monitoring

te
 Chiller plant start sequence operation
 Chiller plant stop sequence operation

ys
 Chiller stage-in sequence operation
 Chiller stage-out sequence operation

lS
 Chiller plant low load mode sequence operation
 Chiller plant rotation sequence operation

tro
 CHWP Control sequence operation
 CDWP Control sequence operation
 Cooling Tower Control sequence operation
on
 Main bypass valve Control sequence operation
C
 Expansion tank Control sequence operation
PM

 Water treatment for cooling tower Control sequence operation


 Buffer tank normal mode Control sequence operation
 Buffer tank discharge mode Control sequence operation
C

 Buffer tank bypass mode Control sequence operation


 Buffer tank recharge mode Control sequence operation
3,

 Chiller plant power failure sequence operation


xL

 Duty Chiller failure /Chiller alarm reset sequence operation


 Duty CHWP, CDWP failure /CHWP, CDWP alarm reset sequence operation
rC

 Duty CT failure /CT alarm reset sequence operation


fo

6.0 Test Record Sheets


e

6.1 CPM Test Sheets


lin

6.2 Graphics Print Outs.


6.3 Trend Reports.
de

6.4 Alarm Print Outs.


ui
"G

Page | 8
APPENDIX A
TEST REPORT SHEET

Item Title

"
st
Te
001 Engineers Report

m
002 Control Logic Test Sheet (General Check)

te
003 Main DDC /PLC Failure Test Sheet

ys
004 Network switches failure Test Sheet

lS
005 CPM System control logic (SoO) Test sheet

tro
006 Print Outs Reports (Graphics /Trend /Alarm Print Outs)

on
C
PM
C
3,
xL
rC
fo
e
lin
de
ui
"G

Page | 9
CLIENT: CONTRACTOR:

PROJECT: ABC Data Centre TEST ENGINEER:

SYSTEM: CPM Control System Test DATE:

LOCATION:

"
001. ENGINEERS REPORT SHEET

st
Te
m
te
ys
lS
tro
on
C
PM
C
3,
xL
rC
fo
e
lin
de
ui
"G
CLIENT: CONTRACTOR:

PROJECT: ABC Data Centre TEST ENGINEER:

SYSTEM: CPM Control System Test DATE:

LOCATION:

"
st
Te
002. CONTROL LOGIC TEST SHEET (General Check)

m
Expected Actual
Item Task
Result Result

te
1. Confirm that all previous tests have been completed properly and the results recorded.

ys
2. Setup trending for the points that needed to be tested.

lS
3. Confirm the control logic diagram has been approved by the Consultant.
4. Initiate a scheduled start up and shut down sequence for each piece of equipment or

tro
system and observe the equipment / system for the correct operation.
5. Initiate a scheduled changeover of equipment if applicable on a daily or weekly

on
schedule.
6. Confirm the Required schedule start and stop times and enter into system
C
7. Restart the equipment, initiate each type of alarm in the field and confirm the correct
operation / changeover of system or equipment in the field.
PM

8. Confirm that the correct alarm message has been raised and issued by SMS module.

9. Confirm if “mismatch” alarm is raised if command is different from status.


C

10. Follow logic chart through for all alarms / failure combinations to confirm the correct
3,

operation of the equipment or system


xL

11. Check all graphic representations display correctly e.g., alarm points turn red on
graphic, and that all equipment references are correct.
rC

12. Print out alarm report for the equipment that has just been completed. Attach to
Record sheet.
fo

13. Print out the trend report and attached to this test & commissioning report.
e
lin

REMARKS / INSTRUMENTS USED.


de

Tested By Vendor /SubCont. Name Signature Date


ui

Co-Test By M&E Cont. Name Signature Date


"G

Witnessed By GC Name Signature Date

Witnessed By CxA Name Signature Date

Witnessed By CM Name Signature Date

Witnessed By Client Name Signature Date


CLIENT: CONTRACTOR:

PROJECT: ABC Data Centre TEST ENGINEER:

SYSTEM: CPM SoO Control System Test DATE:

LOCATION:

"
st
003. MAIN DDC/PLC FAILURE TEST SHEET

Te
Expected Actual
Item Task
Result Result

m
1. Confirm the DDC/PLC panel powered up, fully configured and passed supplier

te
diagnostics
2. Check the BMS database and graphics are complete to facilitate these test

ys
3. Ensure Trend log setup for the equipment under test has been completed

lS
4. Simulate power failure for Primary DDC/PLC and observed that redundancy function
will switch over to Standby DDC/PLC and alarm takes place on the BMS graphic Alarm

tro
screen
5. Redo the test with Standby DDC/PLC power failure follow above step

6.
on
Check all graphic representations display correctly e.g., alarm points turn red on Alarm
C
graphic, and that all equipment references are correct.
7. Print out alarm report for the equipment that has just been completed. Attach to
PM

record sheet and capture screen


C
3,

REMARKS / INSTRUMENTS USED.


xL
rC

Tested By Vendor /SubCont. Name Signature Date


Co-Test By M&E Cont. Name Signature Date
fo

Witnessed By GC Name Signature Date


e

Witnessed By CxA Name Signature Date


lin

Witnessed By CM Name Signature Date


de

Witnessed By Client Name Signature Date


ui
"G
CLIENT: CONTRACTOR:
PROJECT: ABC Data Centre TEST ENGINEER:
SYSTEM: CPM SoO Control System Test DATE:
LOCATION:

"
st
004. NETWORK SWITCH FAILURE TEST SHEET

Te
Expected Actual
Item Task
Result Result

m
1. Confirm the Network panel powered up, fully configured and passed supplier

te
diagnostics
2. Check the CPM database and graphics are complete to facilitate these test

ys
3. Ensure Trend log setup for the equipment under test has been completed

lS
4. Simulate power failure for Network Core Switch-A and observed that redundancy
function will switch over to Network Core Switch-B and alarm takes place on the Alarm

tro
CPM graphic screen
5. Redo the test with Standby Network Core Switch-B power failure follow above step

6.
on
Check all graphic representations display correctly e.g., alarm points turn red on Alarm
C
graphic, and that all equipment references are correct.
7. Print out alarm report for the equipment that has just been completed. Attach to
PM

record sheet and capture screen


C
3,

REMARKS / INSTRUMENTS USED.


xL
rC

Tested By Vendor /SubCont. Name Signature Date


Co-Test By M&E Cont. Name Signature Date
fo

Witnessed By GC Name Signature Date


e

Witnessed By CxA Name Signature Date


lin

Witnessed By CM Name Signature Date


de

Witnessed By Client Name Signature Date


ui
"G

Page | 13
"
st
005. CPM SYSTEM CONTROL LOGIC (SoO) TEST SHEET

Te
PROJECT: ABC Data Centre
DDC/PLC No: Description: Panel Ref: Document Ref:

m
Location: Date: Software Revision: Wiring Diagram Ref:

te
Witness
Item Test Description of SoO

ys
Passed
Initials
Y/N

lS
1

tro
3

on
4

C
5

PM
6

C
8 3,
COMMENTS/REMARKS:
xL
rC

REMARKS / INSTRUMENTS USED.


fo

Tested By Vendor /SubCont. Name Signature Date


e

Co-Test By M&E Cont. Name Signature Date


lin

Witnessed By GC Name Signature Date


de

Witnessed By CxA Name Signature Date


Witnessed By CM Name Signature Date
ui

Witnessed By Client Name Signature Date


"G