Professional Documents
Culture Documents
00
23.00 2.00 23.00
1.50 10.00 10.00 1.50 1.50 10.00 10.00 1.50
1.50
1.50
RB RB FT-1 RB RB RB RB FT-1 RB RB
5.00
5.00
RB
RB
RB
RB
FT-1 FT-1
5.00
5.00
RB
RB
RB
RB
G IR T
G IR T
23.00
23.00
FT-1 FT-1
C E N T ER
C E N T ER
5.00
5.00
RB
RB
RB
RB
FT-1 FT-1
5.00
5.00
RB
RB
RB
RB
RB RB FT-1 RB RB RB RB FT-1 RB RB
1.50
1.50
1.50 10.00 10.00 1.50 1.50 10.00 10.00 1.50
23.00 2.00 23.00
48.00
PREPARED BY: PREPARED FOR: PROJECT TITLE & LOCATION: CERTIFIED BY: DRAFTED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET CONTENTS: SHEET NO.
AS SHOWN
MUNICIPALITY OF LA CABACUNGAN PUBLIC MARKET
R.A CONSTRUCTION S-2
& GENERAL CASTELLANA ENGINEERING STRUCTURE 1 (OPEN MARKET) PRC NO. PRC VALIDITY. HON. ALME RHUMMYLA G.
MERCHANDISE OFFICE PTR NO. DATE ISSUED: ENGR. JOCY MAR VITORINO NICOR - MANGILIMUTAN 9 24
LOCATION: BRGY. CABACUNGAN, LA CASTELLA, NEGROS OCC. ISSUED AT: TIN: PROVINCIAL ENGINEER MUNICIPAL MAYOR