You are on page 1of 42

 

Manage Test
Test Equipment Calibration
Processes with SAP Plant Maintenance and
Quality Management
 
 by Gaetano Altavilla, Senior SAP Practice Manager
 
 October 27, 2017

Learn how to manage the calibration processes for a plant’s test equipment using the Plant
Maintenance (PM) and Quality Management (QM) functionalities with options available in the SAP
system. In particular, find out how to manage your calibration activities to complete business
transactions using master data from integrated modules and configuration done based on a
company’s business processes and strategies using standard options available in the SAP
system.

Key Concept

In a company, the test equipment (i.e., measurement tools) should be checked regularly. Planning and
execution are performed using a maintenance plan that automatically generates an inspection lot. In the

SAP Quality Management (QM) component, the measurement readings for the characteristics Length
and Diameter of a test probe pin are entered for this inspection lot. A test probe pin is
pin is a physical device
used to connect electronic test equipment to a device under test (DUT). Usually these devices are used in
case of electronic test requirements. If measurement readings lie outside of the tolerances, for example,
and adjustment is necessary, the status of the gauge is changed accordingly and a malfunction report is
generated with the appropriate error code. The integration of Plant Maintenance (PM) and QM is divided
into two areas: test equipment management 
management (calibration inspection) and
inspection) and enhanced measurement
reading entry.
entry.

To ensure that specified performance criteria are always met, the test equipment being used must be
regularly checked and calibrated. You can use the functions of test equipment management to perform

the following actions:


  Manage equipment
  Plan and schedule inspections
  Execute orders and inspection lots for processing calibration inspections on equipment

The business transactional flow for the calibration activities is managed mainly by the Plant Maintenance
(PM) and Quality Management (QM) modules, as shown in Figure 1. 1.
 

 
Figure 1

Main activities related to calibration services in SAP QM and PM


The business activities that are shown in the system are outlined in Table 1.
1.

Main master data preparation 


preparation   Main transactional data 
data  

Create maintenance plan


Test equipment: Test equipment has its own tab on which the
Schedule maintenance plan
specific data relating
be maintained. to the
Note that production
you resources/tools
can manage (PRTs) itself
the test equipment is to Display and process calibration
order: time confirmation and
as equipment master records equipment
technical completion

Display and process inspection lot:


Create a Master Inspection Characteristics (MIC): Describe the Record results recording, record
properties that must be measured errors, and perform usage decision
(UD)

Work center: The task list usage is important here so that the
relevant test equipment can be used in maintenance-specific task Display PM Notification
lists.

Verify equipment status change,


Maintenance plan: Generates an order and an inspection lot.
change cycle modification, and
Contains an inspection plan for the test equipment.
update measurement documents
 

Table 1

Business activities in the SAP system related to calibration services


Let’s delve deeper into these steps in the SAP system now.  

Main Master Data Preparation


 As shown
(PRTs) in Table 1,
in Table 1, main
in equipment, master
creating data preparation
a Master consists of maintaining
Inspection Characteristic production
(MIC), creating a taskresources or tools
list, and creating
a maintenance plan. I now walk you through each of these steps.

Maintain the PRT in the Equipment


The PM department can maintain the PRT data in the equipment master data either by using transaction
code IE02 or by following menu path SAP Menu > Plant Maintenance > Management of Technical
Objects > Equipment > Change. Then, enter the equipment number you need to update and press Enter.
This action opens the screen in Figure 2.
2.
 

 
Figure 2

PRT view of equipment


In the PRT data tab in Figure 2,
2, you need to maintain the Task list usage, Start reference, and End
reference fields.

Create an MIC
 

The QM department can create an MIC by using transaction code QS21 or by following menu path SAP
Menu > Logistics > Quality Management > Quality Planning > Basic Data > Inspection Characteristic >
Create.  This path takes you to the screen in Figure 3.
Create. 3. For my example, you use an already existing
characteristic as shown in the screen in Figure 3.
3.

Figure 3

MIC ZERO (General Data View)


To create an MIC, enter the following information:

  The MIC code


  The plant code
  The type of characteristic (qualitative or quantitative)
  The status
  Language key
  Texts

Click the
Here, for Quant. (quantitative)you
your characteristic, data button
can in the
define Figure 3 andmain
3 and
following the system
options:shows the places,
Decimal screen unit
in Figure 4.
4.
of measure,
 

lower and upper limits, Target value, and lower and upper plausibility limits. In Figure 3,
3, the MIC is ZERO
because in this example it is the name for the characteristic to define zero point deviation during the
equipment test procedures.

Figure 4

MIC ZERO (Quantitative Data)


Click the Control indicators option in Figure 3 and
3 and the system shows the screen in Figure 5.
5.
 

 
Figure 5

MIC ZERO (Control Indicators) details


In this screen, you can specify the following details:

  Lower specif. limit: If set, you must enter a lower specification limit for the inspection
characteristic.
  Upper specif. limit: If set, you must enter an upper specification limit for the inspection
inspection
characteristic.
  Sampling procedure:
procedure: If set, a sampling procedure must be assigned to the characteristic in the
task list.
  Required char. (characteristic): If set, the inspection characteristic must be inspected, which leads
to the fact that a UD can only be posted if you have confirmed the inspection results for this
inspection characteristic.
  Classed recording: If set, the inspection results for the inspection
inspection characteristic
characteristic are recorded as
classed values.
  Defects recording: If set, an inspection characteristic is rejected. During results recording, the
function for recording defects for a characteristic is automatically called up and a recording
procedure can either be initialized by the user or performed in the background.

Click the continue icon in Figure 5 and


5 and the system shows the screen in Figure 6.
6.
 

 
Figure 6

MIC ZERO (Control indicators) additional details


In this screen, you can specify the following details:

  Fixed scope
scope:: If set, the number of inspected units must correspond to the precalculated number
of units to be inspected for results recording.
  Test-equi assignment:
assignment: If this indicator is set, y
you
ou can assign test equipment to the inspe
inspection
ction
characteristic in the task list.
  Docu. if rejected: If set, additional text has to be entered in case the characteristic has been
rejected during the results recording.
  RR change docs docs (create change documents during results recording): If set, change documents
are created for this inspection characteristic when results are recorded based on characteristics.
  Record measured vals: If set, measured values for this quantitative characteristic have to be
inspected and confirmed.
  Print: If set, the inspection characteristic is printed on the inspection instruction.

Click the Catalogs option in Figure 3 and


3 and the system shows the screen in Figure 7.
7.
 

Figure 7  

MIC ZERO (Assign defect codes to catalogs)


In this screen, you can specify the defaulted defect codes for rejection.

If you click the Catalog button in Figure 7,


7, the system lists the defect codes, as shown in Figure 8.
8.
 

 
Figure 8

Display possible values for defects of measuring instruments

In the
is Figure 9, of
9,
name you can
the find the details
characteristic of thefull-scale
to define General Data screen
deviation related
during the to the characteristic
equipment FULL. FULL
test procedures.
 

 
Figure 9

MIC FULL (General Data)

In Figure 10,
10, you can view the details of the Quantitative Data screen related to the characteristic FULL.
 

 
Figure 10

MIC FULL (Quantitative Data)


In Figure 11,
11, you can view the details of the first screen for the Control Indicators Data related to the
characteristic FULL.
 

Figure 11

MIC FULL (Control Indicators) first screen


In Figure 12,
12, you can find the details of the second screen for the Control Indicators Data related to the
characteristic FULL.

Figure 12

MIC FULL (Control Indicators) second screen


In Figure 13,
13, you can find the details of the assigned inspection catalogs codes related to the
characteristic FULL.
 

Figure 13  

MIC FULL (assign a defect code for rejection)

Create a Task List


The purpose of the task list is to define a set of operations that can be used in the PM and QM module
during the creation of the Maintenance Order.

To create a task list, you can either use the transaction code IA05 or follow menu path Logistics > Plant
Maintenance > Preventive Maintenance > Work Scheduling > Task Lists > General Maintenance Task
Lists > Create. This action displays the screen in Figure 14.
14. For my example, you display a Task list that
was already created in the demo system, as shown in the  Figure 14. 14.
 

 
Figure 14

Display a task list


In Figure 15,
15, you need to select the appropriate task list and click the Operation button to display the list
of operations in the next screen (Figure
( Figure 16).
16).
 

Figure 15

Select a task list

Figure 16

Operation details for the task list


In Figure 16,
16, you can define or check the relevant operation details, such as control key, duration, unit of
measures, and activity type. Then, to save the data, click the save icon .

Create a Maintenance Plan


 A maintenance plan that generates maintenance
m aintenance orders with inspection lots is to be used to regularly
monitor test equipment. Within the PM-QM link, this should also provide the basis for further processing of
the actual data determined in QM. You want to carry out a calibration inspection at regular intervals for
measurement equipment, and wish to use a maintenance plan for this purpose. Create a new single-cycle
plan and incorporate the general maintenance task list for the calibration inspection. Create an object list
with two pieces of test equipment.
 

To do so, either use the transaction code IP40 or follow menu path Logistics > Plant Maintenance >
Preventive Maintenance > Maintenance Planning > Maintenance Plans > Create > Single Cycle Plan.
This path takes you to Figure 17.
17.

Figure 17

Create a maintenance plan


No reference object is required. The order type is responsible for generating the inspection lot (an
inspection type for the order type is created in Customizing). The order type must be configured so that
the order generated is released immediately.

In the Maint. plan cat. (maintenance plan category) field in Figure 17,
17, select Maintenance Order from the
options and then press Enter. The system then displays the screen in the Figure 18.18.
 

 
Figure 18

Specify details for a maintenance plan (single-cycle plan)


Specify details in the following fields in Figure 18:
18:

  Cycle/Unit
  Planning plant
  Order Type: Enter PM06 for calibration
  Main WorkCtr (work center)
  Priority
  Maint. (maintenance) Planner Group
  MaintActivity Type (maintenance activity type)

  Business Area
 

In the Task List section, enter the data that you entered in Figure 15.
15. After you press Enter the system
opens the screen shown in Figure 19 in19 in which you can select the Yes radio button and enter a date to
specify the cycle start date. Click the enter icon (the green check mark) to save the record.

Figure 19

Enter a start date for the maintenance plan

Transactional
I now walk you through the stepsData
for main transactional data listed in Table 1.
1.

Schedule Maintenance Plan


To schedule a maintenance plan, you can either use transaction code IP10 or follow menu path Logistics
> Plant Maintenance > Preventive Maintenance > Maintenance Planning > Scheduling for Maintenance
Plans > Schedule. In the initial screen that opens (not shown), specify the maintenance plan created
in Figure 15,
15, press Enter, and follow menu path Edit > Start.

The system then opens the pop-up screen in Figure 20.


20.
 

 
Figure 20

Specify the start date for the schedule maintenance plan


In the Start of cycle field specify the start date of the cycle and click the enter icon to save your data. The
system then displays the information message shown in Figure 21. 21.
 

Figure 21

Confirmation message that maintenance plan was scheduled


 After you schedule the maintenance plan, note
n ote that the system has created a calibration
cali bration maintenance
order and Inspection Lot documents automatically. I explain how to display the calibration maintenance
order and the Inspection Lot documents in the next section.

Display the Calibration Maintenance Order


To display the calibration maintenance order, you can either use transaction code IP10 or follow menu
path Logistics > Plant Maintenance > Preventive Maintenance > Maintenance Planning > Scheduling for
Maintenance Plans > Schedule.
 

In the initial screen (not shown), specify the maintenance plan created in Figure 15 and
15 and press Enter. The
system then opens the screen shown in Figure 21 
21 in which you click the display icon . The system
then opens a screen with the details shown in Figure 22.
22.

Figure 22

Display the inspection lot (data for the lot origin)

Display the Inspection Lot


To display the inspection lot, you can use transaction code QA03 or follow menu path SAP Menu >
Logistics > Quality Management > Quality Inspection > Inspection Lot > Processing > Display.

 Alternatively, you can also click the display


displa y inspection lot icon in Figure 22.
22.

The system then displays the UD data. Select the Equipment tab to view the details shown in Figure 23.
23.
 

Figure 23

Display the inspection lot (inspection specifications)

Select the line item and then click the choose object’s details icon   to display the inspection point data,
as shown in the pop-up screen in Figure 23.23.

Step 6. Results Recording


In my example, you determined during the calibration inspection that equipment 10003540 has both an
invalid zero point deviation and an unacceptable full-scale deviation. You can see the general view of
 

these two characteristics in Figure 3 and


and Figure
 Figure 9.
9. The values for equipment 10003541 for both
characteristics lie within the permitted tolerances.

Based on this data, enter the inspection results using transaction code QE51N or by following menu path
SAP Menu: Logistics > Quality Management > Quality Inspection > Worklist > Results Recording.

Expand the relevant operation in the dialog structure (left column) and double-click the corresponding
equipment for the inspection lot. Then, you can evaluate the characteristics.

In
andmy example,
rejected theyou have
rest. accepted
Save theThe
your data. results record
system fordisplays
then the Equipment 10003540
the details shown and operation
in Figure 24. 0020
24.

Figure 24

Enter and save record results for the inspection lot


Note: Upon the saving of the rejection, the system automatically creates PM notifications.

Record the UD
You can record the UD either by using transaction code QA11 or by following menu path Logistics >
Quality Management > Quality Inspection > Inspection Lot > Usage Decision > Record. The screen
in Figure 25 then
then  appears.
 

Figure 25

Record the UD (enter the UD code)


The inspection lot last processed appears by default (or enter the inspection lot number). Choose the
relevant code in the UD code field (for example, A for usable) and save. Note that when you save the UD,
the window for changing the status of objects and the cycle modification factor appears.

One response to the valuation of equipment 10003541 could be, for example, a reduction of the cycle
modification factor, which results in the maintenance cycle being shortened. A malfunction report
(category MQ) was generated with two items (zero point error and end of scale error) and corresponding
error codes. (I discuss the malfunction report for category MG in the next section.) Measurement
documents were still generated for all the measurement readings.

Note that after you save the UD, the system displays the details of the status change for objects or
equipment, as shown in the Figure 26. 26. You can also view these details by using transaction code IE03
and verifying that the status of the equipment has been updated to NPRT PRT, which is not ready for
use.
 

Figure 26

Status change for objects or equipment


 After you press Enter to save your data, the system shows the confir
confirmation
mation message shown in Figure 27.
27.

Figure 27

Confirmation message that the UD was saved

Display PM Notifications
Usually, you can display the PM notifications either by using transaction code IWS3 or by following menu
path Logistics > Plant Maintenance > Maintenance Processing > Notification > Display.

In my example, however, use transaction code QA13 and in the initial screen (not shown) enter the
Inspection Lot document number and press Enter. The system opens the screen shown in the Figure 28.
28.
 

 
Figure 28

Trigger a display notification


Click the Defects tab and select the item you want to consider to trigger the notification display. Click the
Display Notification button, as shown in Figure 28.
28. The system then displays the information as shown
in Figure 29.
29. Note that the Notification Type is MQ - Error msg. from QM.
 

Figure 29

Display PM notification (item overview)

Update the Confirmation Time in the Maintenance


Order
To update the confirmation time in the Maintenance Order, you can either use transaction code IW41 or
follow menu path Logistics > Quality Management > Test Equipment Management > Calibration
Inspection > Order Confirmation > Individual Entry. Enter the calibration order and operation in the
selection screen and then press Enter. The system displays the screen in Figure 30.30.
 

 
Figure 30

Order confirmation data for operation 0010


Specify the following confirmation data:

  Personnel no.:
no.:  The
The  employee ID for the person who actually performed the work
  Actual Work:
Work:  The
The  number of hours spent to complete the work
  Reason: The reason for variance
Reason: 
  Confirm. (Confirmation) text: 
text: Any
 Any reasonable text to justify the work done

Then, check that the rest of the defaulted entries are appropriate and save the data. The system displays
a confirmation message as shown in Figure 30. 30.

Flag the Maintenance Order as Technically Complete


Before making this step you should verify that all activities against the calibration order have been
competed (i.e., confirmation time for all operations).

To update the PM Order as technically complete, you can either use transaction code IW32 or follow
menu path Logistics > Plant Maintenance > Maintenance Processing > Order > Change. In the initial
 

screen (not shown) enter the calibration order and operation in the selection screen and press Enter. The
system displays the screen in Figure 31.
31.

Figure 31

Order is technically complete


In the menu bar in Figure 31 click
31 click the Order button and follow menu path Functions > Complete >
Complete (technically) and save the data. The status of the order is then updated to TECO  –
 – technically
 technically
completed.

Run Reports
 All affected and authorized departments
departm ents can display the details of the QM and PM documents related to
the calibration processes (for example, Quality Notification, Inspection Lot, and PM Orders) using the
information system reports available under the QM and PM modules.

These two menu paths can be used to retrieve transaction documents created in the QM and PM
modules:

In QM, follow Plant Maintenance > Information System > Report Selection > Information Systems
Information Systems system reports available under the QM Centers Capacity/Maintenance.

In PM, follow Processing/Maintenance Planning/Maintenance Task Lists Quality Management > Test
Equipment Management > Information System > Equipment/Maintenance/Calibration Inspection.
 

Customizing Activities
Now I describe the most important customizing activities that you need to check or complete to enable the
external processes.

Define the Order Type


In PM Customizing, you need to create an order type for the calibration inspection. To create an order
type, follow menu path Plant Maintenance and Customer Service > Maintenance and Service Processing
> Maintenance and Service Orders > Functions and Settings for Order Types > Configure Order
Types.  This
Types. This  path takes you to Figure 32.
32. In the Cost accounting profiles section of Figure 32 enter
32 enter the
details provided by the costing department. In the Reorganization section, enter the residence time for
archiving purposes in the Residence Time1 field. Select the Release immediately indicator to release the
order upon its creation in one step.

Figure 32
 

Define a calibration order type

Assign the Inspection Type to the Order Type


In PM Customizing, you need to assign the order type for the calibration inspection to the previously
defined inspection type for PM. To complete this step, follow IMG menu path Plant Maintenance and
Customer Service > Maintenance and Service Processing > Maintenance and Service Orders >

Functions and Settings


This path displays for Order
the screen Types
shown > Assign
in Figure 33Inspection
33.
. Types to Maintenance/Service Order Types.

Figure 33
Assign the calibration order type to the inspection type
In Figure 33,
33, you can see that the plant 1000 and calibration order type PM06 combination has been
assigned to inspection type 14 (inspection in PM).

Inspection Point
In QM Customizing, you need to define an inspection point of category Equipment or Functional location.
The inspection point is entered in the task list header. To complete this step, follow menu path Quality
Management > Quality Planning > Inspection Planning > General > Define Identifier for Inspection Points.
This path displays the screen shown in Figure 34. 34. In the Fields tab populate the fields as shown
in Figure 34.
34.
 

 
Figure 34

Display inspection point for equipment (fields)


Now click the Valuation tab (Figure
(Figure 35)
35) to maintain the following default values:

  For valuating the Inspection Point


  In case all characteristics have been accepted
  In case at least one characteristic has been rejected
 

 
Figure 35

Display the inspection point for equipment (valuation)

Define a Control Key


In QM Customizing, you need to create a control key that requires an inspection characteristic for the task
list. You define a new control key relevant for QM activities and externally processed operations. Note
that without the control key set as described, the external process cannot be triggered from the
production order’s operation. 
operation. 

To complete this step, you can either use IMG transaction code OPJ8 or follow menu path Tools >
Customizing > IMG
Control > Master > Edit
Data ProjectData
> Routing (SPRO) Pushbutton:
> Define SAP In
control key. Reference IMG.use
my example, Production > Shop
the control keys Floor
QM01
and PM01. These are standard SAP control keys and are displayed in Figures 36 and
36 and 37.
37. Make sure that
the check boxes enclosed in a red border in Figures 36 and
36 and 37 have
37 have been set in your system.
 

 
Figure 36

Display control key QM01


 

 
Figure 37

Display control key PM01


The control key is used in the operation of the production order. To enable the external activities
functionalities with the QM module, check the Insp.char. required check box and enter the value + in the
External processing field. Save the data by clicking the save icon.

Follow-Up Actions
In QM Customizing, follow-up actions can be defined that can then be linked to the codes for UDs. If a
particular code is assigned when the UD is made, the assigned follow-up actions (for example, updating
measurement readings, status changes, and so on) are executed automatically. To complete this step,
follow menu path Tools > Customizing > IMG > Edit Project (SPRO) Pushbutton: SAP Reference IMG.
Quality Management > Define Follow-Up Actions. Then select in the pop-up screen (not shown) the
activity’s option Follow-Up
Follow-Up Actions. This action opens the screen in Figure 38.
38.
 

Figure 38

Define QM_PM follow-up actions


In Figure 38 select
38 select the line item and select the folder Function modules. The system opens the screen
in Figure 39.
39. In this screen you can define the list of function modules that will be triggered upon the UD.

I now describe the follow-up actions for the three function modules shown in Figure 39:
39:

  QFOA_QM_CHAR_TO_PM_E_POINTS: This follow-up action can be used to transfer QM

inspection results to the equipment or functional locations in PM as measurement documents.

  QFOA_OBJECT_STATUS_SET: Follow-Up Action: Set Equipment Status/Change Cycle


Modification Factor

  QFOA_ORDER_TECHNICAL_COMPLETE: Follow-Up Action: Technically Complete PM Order.


This follow-up action can be used to transfer QM inspection results to the equipment/functional
locations in PM as measurement documents. AftrPst (after posting) check box: If this check box is
selected, the function module is called after posting. Synchronous Update check box: If this check
box is set, the dialog transaction and follow-up action are updated synchronously.

Figure 39
 

Define function modules relevant to the QM_PM follow-up action

Define Inspection Types


In this step you verify the customizing settings for the inspection type 14  –
 – Inspection
 Inspection in the Plant
Maintenance. To complete this step follow menu path Tools > Customizing > IMG > Edit Project (SPRO)
Pushbutton: SAP Reference IMG. Quality Management > Quality Inspection > Inspection Lot Creation >
Maintain Inspection Types. This path takes you to the screen in Figure 40.
40.

Figure 40

Display inspection type 14


For my example, I have used the standard Inspection Type 14 - Inspection in Plant Maintenance. This
inspection type is linked with the notification type MQ –
MQ  – Error
 Error msg. from QM.

Maintain Inspection Lot Origins and Assign Inspection


Types
In this step you make sure that the Inspection Type 14 - Receiving Insp. from External Processing has
been assigned to the Inspection Origin 01 - Goods Receipt and the Inspection Type 04 - Goods receipt
inspection from production to the Inspection Origin 04 - Goods Receipt from Production.

To complete this step follow menu path Tools > Customizing > IMG > Edit Project (SPRO) Pushbutton:
SAP Reference IMG. Quality Management > Quality Inspection > Inspection Lot Creation > Maintain
Inspection Lot Origins and Assign Inspection Types. This path takes you to the screen in Figure 41.
41.
 

 
Figure 41

Display entries for inspection origin 14


You have to link the lot origin 14, the Inspection in Plant Maintenance 14, and status 4 - Released
(general). Note that these settings should already have been set as standard upon the QM module
activation.
Select the first line item in Figure 41 and
41 and then double-click the Inspection types for the origin folder. The
system displays the details shown in Figure 42.42.

Figure 42

Display the link between inspection type 14 and origin 14


Note that the entry listed in the Figure 42 should
42 should have already been created by the SAP system upon the
activation of the QM module. In my example, the entry you need to enable is 14 as origin of the Plant
Maintenance and 14 as inspection type.

With these entries, the system automatically creates an inspection lot upon the scheduling of a
maintenance plan.

Define Default Values for Inspection Type


In this step you define default values for inspection types 14.
 

To do so, follow menu path Tools > Customizing > IMG > Edit Project (SPRO) Pushbutton: SAP
Reference IMG. Quality Management > Quality Inspection > Inspection Lot Creation > Define Default
Values for Inspection Type. Then, double-click the line item containing the Inspection Type 14. This
action opens the screen in Figure 43.
43.

Figure 43
Default values for inspection type 14
In the inspection lot, with inspection type 14, enable the usage of Inspect by task list, Record
characteristic results, and Automatic usage decision indicator. Leave the rest of the fields as defaulted. In
an SAP system, the data is always saved using the save icon.

Define Notification Types


In this step you define the Notification document type that will be used during the vendor’s Quality
Notification processes. To complete this step, follow IMG menu path Tools > Customizing > IMG > Edit
Project (SPRO) Pushbutton: SAP Reference IMG. Quality Management > Quality Notifications >
Notification Creation > Notification Type > Define Notification Types. When you double-click the
notification type MQ, the system displays the screen shown in Figure 44.44.
 

 
Figure 44

Display notification type MQ


In Figure 44,
44, verify that the following values are set:


  02 as Notification origin. It defines the screen sequence control for a Notification Type.
  1000_QM as Catalog profile. It restricts the list of values for the information contained in the
quality notification based on your business requirements.
  26 as Update group statistics. It is used to determine the fields that will be created for the
statistics in the Logistics Information System (LIS).

Gaetano Altavilla
Dr. Gaetano Altavilla is a senior SAP practice manager. His focus is on pre-sales, delivery of SAP
application solutions for large international corporations, and SAP knowledge management in Europe, the
Middle East, and Africa (EMEA).

In his 18 years of SAP application experience working for many multinational companies, such as Procter
& Gamble and Hewlett-Packard, he has covered a wide range of ERP logistic areas, focusing on the MM,
WM, SD, LES, PP, PP-PI, PLM (QM, PM, PS) modules, as welll as CRM (TFM), SRM (EBP), SCM (SAP
 APO), and MES (ME) components.
com ponents.

Dr. Altavilla holds a degree with first-class honors in mathematics from the University of Naples and is
certified in many SAP modules: SAP Logistics Bootcamp, SAP MM, SD, LE (SHP/WM/LE), PP, PLM (PM,
QM, PS), SRM, CRM, SCM (APO), SCM (TM), FI, CO, and Solution Manager. He also has experience in
 ABAP/4 and application link enabling (ALE) and IDocs. He has participated in numerous industry
conferences, such as the SAP Skills Conference in Walldorf at SAP SE.

See more by this author  


 

You may contact the author at 


at  Gaetano_altavilla@hotmail.com
Gaetano_altavilla@hotmail.com.. 

If you have comments about this article or publication, or would like to submit an article idea, please
the editor . 
contact the 