Percentage (%)
90,00% 85,25% 4,75% 96,00% 97,85% 400 80
51
Minutes
300 60
-1,85%
98% OEE Achievement X .
O
200
100 246
88 71 71
40
20
96% 0 9 0
Molding Barashi Molding Sand Others
94% 98% Line Line A Preparation
Precentage (%)
Precentage (%)
92% 96% 100
Pareto Molding Line 100
94% 87
90%
92% 200 70 80
Losses
Percentage (%)
88%
Minutes
90% 150 51 60
4.75 % 97,85%
86% 88% 96,00% 100 29 40
90,00% 86% 50 20
84% 72 53 47 42
84% 0
32 0
82% 82% Molding Line C Molding Line B Molding Line F Molding Line D Molding Line E
85,25%
80% 80%
Target Achievement
Minutes Problem Items
Target Achievement
Jan-23
43 Guntry core setting jig trouble
Jan-23
29 Flask closing time over
<Machine> Long Time Breakdown Items Problem Min. Items Problem Min.
No Problem Total Time Hoist core setting o/load 2 Flask Closing Time Over 3
1 Apron conveyor shock relay 20 Gantry Core Setting Over Load 6 Flask Closing Time Over 2
2 Tranverser breaker not advance 31 Gantry Core Setting Over Load 2 Flask Closing Time Over 2
3 Moulding MC OL (Die drag nabrak Cover rantai) 34 Gantry Core Setting Over Load 6 Flask Closing Time Over 2 8x
4 Die drag not change (rantai 11 Drive R putus) 24 Gantry Core Setting Over Load 3 Flask Closing Time Over 11 Problem
11x
Gantry Core Setting Over Load 3 Problem F.Closing T.O 5
Gantry hoist core setting not reverse 5 F.Closing T.O (65-1 roller ada bari) 2
Hanger Jig core setting invertor Fault 3 F.Closing T.O (65-1 roller ada bari) 2
Hanger Jig core setting invertor Fault 3
Gantri Core setting not up 2
Gantry Core Setting not Auto (hompost) 8