COMMUINCATION WORKS PHYSICAL PLANNING & HOUSING DEPARTMENT

CONSTRUCTION & UP-GRADATION TO DEGREE LEVEL BUILDING AT GOVT BOYS


INTER COLLEGE HAIR DIN DISTRICT SOHBAT PUR
ABSTRAT OF COST
PSDP NO: 1450 (Z2019.0154)
BASED ON COMPOSITE SCHEDULE OF RATES 2018
No. DESCRIPTION AMOUNT Rs.

1 CIVIL WORK GROUND FLOOR (C. Area=25244.72Sft) 88,305,590


2 CIVIL WORK FIRST FLOOR (C. Area = 25244.72Sft) 53,104,649
4 PLUMBING WORKS 1,122,370
5 ELECTRICAL WORKS 6,067,987
6 GAS WORKS 1,137,443
6 OVER HEAD WATER TANKS 462,251
6 BOUNDARY WALL 5,341,505
6 U.G.W.TANK 791,082
6 SEPTIC TANK 118,447
6 Ex.W.Supply 41,784
6 SOAKAGE PIT 253,440
TOTAL 156,746,550
Add 1% Contingency 1,567,465
G-TOTAL 158,314,015
TOTAL (In Millions) 158.31