The document is an abstract of cost for the construction and up-gradation of a government boys' inter college building in Hair Din district, Sohbat Pur. It provides a breakdown of costs for the project in 14 line items, with civil works for the ground and first floors making up the bulk of the estimated total cost of 158.31 million rupees. The cost items include plumbing, electrical, gas works, overhead water tanks, boundary wall, underground water tank, septic tank, and external water supply. A 1% contingency is also included, bringing the grand total to 158.31 million rupees.
The document is an abstract of cost for the construction and up-gradation of a government boys' inter college building in Hair Din district, Sohbat Pur. It provides a breakdown of costs for the project in 14 line items, with civil works for the ground and first floors making up the bulk of the estimated total cost of 158.31 million rupees. The cost items include plumbing, electrical, gas works, overhead water tanks, boundary wall, underground water tank, septic tank, and external water supply. A 1% contingency is also included, bringing the grand total to 158.31 million rupees.
The document is an abstract of cost for the construction and up-gradation of a government boys' inter college building in Hair Din district, Sohbat Pur. It provides a breakdown of costs for the project in 14 line items, with civil works for the ground and first floors making up the bulk of the estimated total cost of 158.31 million rupees. The cost items include plumbing, electrical, gas works, overhead water tanks, boundary wall, underground water tank, septic tank, and external water supply. A 1% contingency is also included, bringing the grand total to 158.31 million rupees.
COMMUINCATION WORKS PHYSICAL PLANNING & HOUSING DEPARTMENT
CONSTRUCTION & UP-GRADATION TO DEGREE LEVEL BUILDING AT GOVT BOYS
INTER COLLEGE HAIR DIN DISTRICT SOHBAT PUR ABSTRAT OF COST PSDP NO: 1450 (Z2019.0154) BASED ON COMPOSITE SCHEDULE OF RATES 2018 No. DESCRIPTION AMOUNT Rs.
1 CIVIL WORK GROUND FLOOR (C. Area=25244.72Sft) 88,305,590
2 CIVIL WORK FIRST FLOOR (C. Area = 25244.72Sft) 53,104,649 4 PLUMBING WORKS 1,122,370 5 ELECTRICAL WORKS 6,067,987 6 GAS WORKS 1,137,443 6 OVER HEAD WATER TANKS 462,251 6 BOUNDARY WALL 5,341,505 6 U.G.W.TANK 791,082 6 SEPTIC TANK 118,447 6 Ex.W.Supply 41,784 6 SOAKAGE PIT 253,440 TOTAL 156,746,550 Add 1% Contingency 1,567,465 G-TOTAL 158,314,015 TOTAL (In Millions) 158.31