Professional Documents
Culture Documents
Overview
BASIC BOWL ASSEMBLY COLUMN HEAD ASSEMBLY DRIVER SELECTION COATING / TESTING PERFORMANCE DRAWINGS
Total List Price ORP CONFIGURATION ASSEMBLY / OTHER
Price Summary
Include Pricing
Bowl Assembly ORP
Critical Dimensions
Actions Required
Specified Sump Depth Min. Recommended TPL
4.53 ft
Specified TPL
Min. Recommended Sump Depth
Specified TPL 18.96 ft
18.71 ft
Pumping Level
1.64 ft
Basic Configuration
https://myaccess.xyleminc.com/SalesPortal/ConfiguratorPage.aspx?ProductId=b4388c9d-3177-4cb1-aa3b-0b42b7d1581b&EntityName=QuoteLineIte… 1/1