SGS
SGS India Pvt. Ltd,
Inspection report
[ File No: INICHNVIND/202200072 Inspection Report No.:-_ CHN/MBM/021/2022
Boss No :5037883 -
Place of inspection: Date & Time of inspection:
Wis Enpro Industral Automation pvt ‘Date:27.04:2022, Time In: 09.30.AM, Time Out: 06.00 P.M
Chennai india, ‘Date:26.04.2022! Time In 03.00.A Time Out 07.00 P.M
‘Name of the Project (if any) ‘Supply of JASIKAN 33 kV Switching Station Control and
Relay Panel.
Name of Client ‘Mis Arvehsis Eneroy Pri Ltd
Name of Seller /Manufacturer/ Vendor ] Wis Arvensis Energy Pvt Lid W Enproindusal Automaton
putts
Client's P/O No. & Date ~ PO:APELIDEL/21-22/117 Date:19.02.2022.
Performa Invoice, PVARVIDCL/21221043B,Date:07 03.2022,
Date of ast inapecto NIL
[Inspection eal reference Ths Ema GEDA DOB,
‘Status of previous hold points [Devi ei
P.O. Status: Completed / Balance / Hold Completed
Guan
tem un ant
oper Description & Size anBtt, | prevousy | Suantty | how” | Quay | Quantty
Contact ‘order’ | Passes | Won | Passed | ices" | “Won
- Nos.) ? ~_-
1 | 33Kv.Bus coupier Protection and Metering | of wi | ot otf we | om
Panel GIW Imports Exports Energy
meter OIG and Earth Fault Relays) CM
Mimic Diagram.
‘SINo:0179-02
2 | S3kV Feeder Protection and Metering Pane! | 05 mie] 05 | os fom fon
(Overcurrent Relays S015:DC Supervision
Relay ,80, Tip Circuit Supervision
relay 85 Highspeed tipping relay, 86 &
Stondby Ei Relay( CAW Mimic
diagram(1250 A Rated Outdoor Feeder Bay)
SINo:
0179-014 0179-018,0179-010.0179-010,
or7e-oie
3 | LVAC Distroution Board 01 we | ot | oon | om | om
SINo.0179-08.
ki Babe a
win}
\VF-INANDAN-D}2 [Ver 23 01-03-2022)SGS sos india pv. is
mn Report No :CHNIMBM/021/2022
ile No : IN/CHNVIND/202200072
Boss No: 5037883,
Rev:.00,
Date:05,04.2022.
“aproved Drawing No,
Revision
EIA-979-01 Rev:4(OIG-1,2,3,84)
EIA-979-1A,Rev-4(0IG-8)
E1A-979-02 Rev:3(B/C-1)
1A-979-03 Rev-2(ACDB)
Completed.
#. Continuity ~ Completed,
‘Asper QCP No: EIA-979-01,01A,02/-2021-22.
4, Final paint shade/DFT(Ory fl thickness) -
Completed,
h, Functional test by applying rated voltage —
Completed,
i, Secondary current injection test for proper
functioning of meters and relays ~ Completed
Reference standard / code / specification & Edition /
Version / Year :Drawings , 1S 8623 and as per QCP
‘Asper QCP No: E1A-978-03-2021.22
9. Enclosure overall dimension & surface
finishing — Completed.
h. Functional test by applying rated voltage of
400 V AC- Completed,
i. Secondary current injection test for proper
Sampling Standard & Editon / Version | Year
4100 A Per acP
functioning of MFM Meter & Ammeter.
Completed
] Annexure No
Reference Documents Scope of inspection and Status of Detailed
report
‘sper GOP Nor EIA-STS-D4,01A, 022-2 &
PONo& Date EIA-979-03-2021-22..
PO:APELIDEL/21-22/111,Dato:19.02,2022 Document review check-completed
Performa Invoice: Clause 1.1 to 3.3 Review- Competed
PUARVIDCL212210438,Date-07 03.2022. 4. Final Inspection
GAP TTP No 8: Verification of components Rating/Busbar
+ | rating Maketarrangement as per approved :
QGP No: EIA-878-01,014,021-2021-22 drawing - Competed
Rev.00, b. Mounting of Name Plates, covers ete.
| Date:08.04.2022. € Circuit functional checks - Completed
| 4. HV Test (2 KV fort Min)
cP No: E1A-970:08-2021-22 «Insulation resistance measurement before
and afer JV test through 10COV megger- Annexure |
Current Hold points / Deviations:
NIL
Remarks: NIL
‘LUnspection Jointly Completed with Mr.Kama Satish kumar (9000455733) M/s Arvensis Energy Pvt Ltd
2.The End Client: Electricity Company of Ghana Lid, Attended the Inspection by online,
NIL
Enclosure:
‘LInteral test report, 2.Test witnessed report, 3.Calibration certificate ,4. MTC, §.Instrument Calibration certifcates.6 MOM.
‘SGS india Private Ltd
ww enamunay21O7 22.
LVF-IN-IND-N-012 / Ver 2.3 01-03-2022! Page 2 of 4SGS sosinaa rw. ux
Detailed Inspeetion Report
File No : INICHN/IND/202200072 Boss No: 5037883 | Annexure No: T
Report No and Date: CHNIMBI/O21/2022 Date: 27.04.2022 & 28.04.2022 | Page
aes
‘Material and Quan
iy inspected As per Page one
SeNe. ‘Deals af ativity performed, ndings and prodect marking Conchaion
‘Raper QGP Not EIAS79-0%,01A,02-2024-22 & EIA-STO-0S-2021-22,
Clause 1.1 103.3 Review- Completed
4. inl inspection
4 Verticaton of components Rating/BusbarratinglMake/srrangement 2s per approved | Found satisfactory
2 of 3
Material and Quantity inspected As per Page one
SEN. Details of activity performed, findings and product marking Conclusion
7 ‘Aspar QGP No: EIA-379-03-207 0
49. Enclosure overall dimension & surface finishing check witness Completed and found _| Found satistactory
satisfactory.
h. Functional test by applying rated voltage of 400 V AC witness Completed and found Found satisfactory
satisfactory |
i, Secondary current injection test for proper functioning of MFM Meter & Ammeter Found satisfactory
Completed and found satisfactory
Document review check-completed Found satisfactory
‘Number of Photographs taken: 20
Confirm Instruments wsed are ln working condillon & sullable for intended purpose: VES TNO
Verified the Qualification, Training & Experience of the person performing the test before witness: VES7NO
Tnstrament Name & Ident Calibration | Calibra Calibrated By | Calibration Traceable to
No. ante due date National /International
standard
instrument calibration Index sheet atfached————
Verified the Calibration Certificates of above mentioned Instruments also for Accuracy, Uncertainty & % Error before
allowing /using it for test /inspeetion and found suitable: YES/NO
DISCLAIMER:- Incase test certificates of Bought cut temsitaw materials are nol fom accredited laboratory, SGS responsibilty is linted
{o very the test reeulls against the requirement and nolo assess the accuracy /sutablly of results specified inthe test report.
Trapection Location of identification | Name and signature of SGS | Name and signature of Manufacturer Vendor]
Identification representative roprosontative
{Actual impression)
eek
SGS YELLOW
STICKER el Chandrasekar
Near the name plate _| Srinspection engineer Mis Enpro Industrial Automation pvt
Discaimer:
‘This docement doesnot have any Lega or Commercial valu and hence cannot use for any commercial ned I
‘This is just site report applicable athe time, date and place of inspection
trom S68 Office ) ZSam aN
Debriefing & Vetting Status: (Refer Inspection Schedule) { SL gs el
3 ( oxen.
Name & sign of Vetting authority: Be Je
“ a
Seay