MINUTES OF MEETING HELD BETWEEN M/s. ARVENSIS ENERGY PVT LTD.

, AND
PARAMOUNT BUILDING SOLUTIONS ON 08th February 2023 AT THE FACTORY PREMISES
OF PARAMOUNT STEEL(UNIT-2), KONAKANCHI.
PROJECT: LAYER SHED -02

MEMBERS PRESENTS:

M/s. ARVENSIS ENERGY PVT LTD, M/s. PARMOUNT BUILDING SOLUTIONS,

Mr. KARNA SATISH KUMAR Mr.NIRMAL,

QUALITY ENGINEER. QUALITY ENGINEER.

THE INSPECTION OF LAYER SHED STRUCTURE-02 ARE CARRIED OUT AT FACTORY PREMISES OF LAYER
SHED ON 08th February 2023.

Sr. No. Item Description

Supply of Steel structure components Includes columns, rafters, rods, Beams


1 with Blasting, one coat Epoxy primer & One coat finish epoxy paint.

AIR BUBBLE INSULATION(8THK) WITH ALUMINIUM FOIL TOP&BOTTOM


2
(1.2M * 50M)

THE ABOVE-MENTIONED LAYER SHED STRUCTURE WERE SUBJECTED TO ROUTINE MEASUREMENTS


TESTS.

1. Visual Inspection of Steel Structures as Per Drawings and Found Satisfactory.


2. Verification of Color, furnishing and Dimensional Measurement as Per Shop Drawings Dimensions
found Satisfactory.
3. Coating Thickness of paint measured and found satisfactory.
4. Verification of quantity as per BOM.
Balance Works/Remarks:
1. C Purlins, Sheeting material & it’s Hardware, Channel clip assembly and wind column conn clips not
offered for inspection, as non-availability of materials.
2. Quantity verification of 40*4*1000mm loose plates could not verified due to packed in gaps of Rafters
and Columns structures loading frames.
3. Some of minor issues of removed paint coating will be repainted before dispatch.

Mr. KARNA SATISH KUMAR Mr. NIRMAL,


QUALITY ENGINEER, QUALITY ENGINEER