You are on page 1of 2

Model Examinations-Nov.

2022
Sub. Name: Software Engineering Date: 24.11.2022
Branch/Year/Sem:IT/III/V Duration: 3Hour
Sub.Code:CS8494 Marks: 100

Part-A(5*2=10 marks)

Q.No BT
Questions CO
. Level

Part A (10*2=20 Marks)

1 Define agile process. Give any two agile principles. BTL1 CO1

2 Differentiate verification and validation. Give an example. BTL2 CO1

3 What is meant by structural analysis and volatile requirement? BTL1 CO2

4 Write Petri Net and list types of traceability in a software process. BTL1 CO2

5 Give the various types of architectural styles with example. BTL2 CO3

6 Point out the steps that are applied to develop a decision table in BTL4 CO3
tabular design notation.
7 What is the difference between black box testing and white box BTL4 CO4
testing?
8 What is business process reengineering? BTL2 CO4

9 How to measure the function point FP?


BTL5 CO5

Construct the table for risk component over four impact categories CO5
10 BTL5
such as negligible, marginal, critical, or catastrophic.

Part B (5*13=65 Marks)

A).Explain the 12 practices of extreme programming. Explain how


BTL3
agility is achieved in extreme programming.(OR)
11 CO1
B)(i). Write short notes on concurrent models.(6)
BTL4
(ii). Discuss in detail about Scrum.(7)

A).(i) Discuss about the requirement management planning.(7) BTL2


(ii).Describe about the requirement change management.(6) .(OR)
12 B). Analyze about the requirement
CO2
BTL4
engineering Process and how the
requirements are managed.(13)
A).(i)Demonstrate in detail about architectural design.(7)
BTL3
(ii).Illustrate in detail about any four architectural styles.(6) (OR)
B).(i).Classify and explain the various architectural styles in detail.
13 (7) CO3
BTL2
(ii). Discuss the design heuristics for effective modularity design.
(6)

A).Describe about the various Integration & Debugging strategies


BTL2
14 followed in software development.(13)(OR) CO4
B).Develop BPR model to increase the efficiency of business BTL6
process(13).
A). Discuss Decision tree to support Make/buy decision.(13) BTL2 CO5

B). How the cost of a software is estimated using


15 CO5
(i) Function Point metric Model.(7)
BTL3
(ii) COCOMO(by three Methods).(6)

Part C (1*15=15 Marks)

A).Explain about the umbrella activities which support software


development process and discuss about the necessity in BTL5 CO1
16 maintaining the quality in both software process and product that is
being developed for railway reservation system.
B). How Reverse Engineering issued for Data ,Processing and CO4
BTL5
User Interface? Justify your answer.