Solve any five questions out of the following
a. Discuss the special features of a project [04]
b. Discuss the responsibilities of a project manager [04]
..E..
c. Discuss the concept of entrepreneurship and entrepreneur [04]
d. Write a short note on AOA and AON diagrams [04]
e. Differentiate between Process and Project management? [04]
f. Differentiate between CPM and PERT [04]
Q. No. 2
Discuss various stages in a project life cycle with the help of the project life
cycle curve [10]
b. Discuss various types of clearances required for starting a new project [10]
0. No. 3
9. No. 4
a. Discuss seven C's of team building [10]
b. Discuss ABC analysis [10]
16483 Page 1 of 2
per / Subject Code: 41975 / Management Stream - Project Management for Chemical Process Industries (DLOC
OP CODE: 10016483
0. No. 5 Rapers.c
a. Discuss the project exeution plan in details
b Find the critical path for performing activities given in the following table
Activity Duration (weeks) Predecessor
A 35 >
o>
B 40
C 30 B
D 20 A
50 D
50 C
G 15
H I6 F,G
0. No. 6
m u
a. Discuus the 3q uestio
R's of contracting [10]
b. Disscuss the Work Break Down Structure in details [10]
(3 Hours) Marks 80
02. (a) Explain the project phases with the help project life cycle curve 10
(b) Discuss the various types of work breakdown structure (WBS) in detail. 10
05. (a) Explain the meaning and usefulness of intellectual property rights 10
(b) Explain tools and technique used for achieving project quality control 10
06. (a) Explain different inventory techniques. Explain in brief ABC & VED 10
analysis
(b) Explain in brief various types of cost estimates 10
66933 Page 1 of 1
52D665BA61021OD6637CEC2F49404042
Paper / Subject Code: 52501 I Project Engineeering & Entreprenesurship Management
4-Dec-2019 1TO0518- B.E.(CHEMICALY(SEM VII) (CBSGS) /52501 - Project Engineeering &Entreprenesurship
Management 77382
4 (a) Explain GANTT chart with its advantages and disadvantages. [10]
(b) Explain Seven C's for team building. [10]
5 (a) Explain What is Startup and Stabilization, and and what is difference between
them. [10]
(b) Explain in brief examination process and procedure for Patent [10]
77382 Page 1 of 1
4B5860DF6148AB46DAO6129EE2D019A9
Paper / Subject Code: 52501/ Project Engineeering &Entreprenesurship Management
(3 Hours) Marks 80
02. (a) Explain the project phases with the help project life cycle curve 10
(b) Discuss the various types of work breakdown structure (WBS) in 10
detail.
05. (a) Explain the meaning and usefulness of intellectual property rights 10
(b) Explain tools and technique used for achieving project quality control 10
06. (a) Explain different inventory techniques. Explain in brief ABC & VED 10
analysis
(b) Explain in brief various types of cost estimates 10
57367
BF8003E49DBD4ECBD94387E8FA 1C9424
EM
Q. P. Code: 2549%
Note () Q.1 is
compulsory
2) Auswer anyThree questioIS from remainug Five
13) Assume sutable data if
necessary
1 Write a short ote on
(any Five)
(a) Project lile cvcle
(b Responsibilitics of Project Manager
ic) Project luitat ion
(d) Project clearances
(e) Risk Insurance
(f) Concept of Entrepreneur.
2 (a) Explain d1fferent tvpes of
entrepreneurshup basei on busiss and
(b)What is the role of cont ractor & technoloy
sub-contractor in projct planniug
10
3 a Dra a etwotk dagram aId calculate critical path for tihc
ollowi CtNi 10
Activity PredeceSSOr activity Time (davs)
B 2
3
D
B.D 2
F A.B.D
u e s
1
E.G
F.HI
6DES2CSE0ADA '4A0273ED"F9IN2B8201
CBGs (chem) pEern Q.P.Code:11955
B.E Com
Duration 3 hours
Total Marks: 80
2,4 5 6 7
9
|8 3.6 7 9
4 7 9
|10
12
13 9.10 8
14 12 I6
15 12,13 16
Q2. (b) Compare funetional organization and pure project organization.
(08)
o3 An ancillary unit specalizing in the
manufacture of special purpose high pressure coolant punmps
has entered into a contract with a large macline lool
units to be supplicd per month accord1ng lo the contract manyfacturing company. The nunber of punn
is as shown in the table. According to thts table.
the company is to stupply 50 coolant pumps dumg ttie first month
the second oonth and so on The lable displays tlie producton goalfollowed by another 100 units dunng
over the next ten
column gves the total number of units to be produced atat the end of onc month, atmonths
The thurd
months and so on. Tlhis Is the des1red cumulative supply positton. the end of three
Month Planned Cumulatise
2
300
200 S00
5 200 700
Turn Over
Q.P.Code:11955
2
200 II00
150 1350
9 S0 |00
50 350
oneet, due to several unforescen circumstances. the production of the pump units slartcd a monin
completonorginally schedhuled. Futher, the planned proluction schedule could nol be achieved. After
a D e r s . c
of 5 months, it was dec1del by the ancillary unit lo take stock of the siluation
Month Unit
Cumulat1ne
Supplied
2
S0
100
150
150 450
Artual panl
(2) Purrkalel pa
3
CDI SC44BULBCBBr4t
Turn Over
Q.P.Code:11955
4. (a) Draw a network diagram and calculate critical path for the following actiy (10)
ities:
Activity Predecessor activity Time (days)
6
R 4
A 3
D A 5
F A 1
m u q u e
B,C 4
G B,C 2
H E.F 6
E.F 5
D,H 3
K G,I 5
(b) What are the time and cost control tools and techniques? (10)
5. (a) How project schedule is made? Explain with suitable example. (10)
(b) Explain project commissioning, start up, stabilization with suitable example. (10)
6. (a) Explain concept of entrepreneur and types of entrepreneurship based on (10)
business.
(b) In a desalination plant, an evaporator of area l50 m² was purchased in 1996 at (0)
a cost of $2.00.000. In 2002, another evaporator of area 75 m² was added. What
was the cost of second evaporator (in $)? Assume the cost of evaporator scales as
(capacity)0.54, The Marshall and Swift index was 1048.5 in 1996 and 1116.9 in 2002.
9C038EE614896F8B498AFEDS1866BAAS
Q.P. Code : 727100
(3 Hours) [Total Marks : 80
(a) Draw network diagram and critical path for following activity list : 10