Inspection & Testing Requirements Scope:: Test and Inspection Per
Inspection & Testing Requirements Scope:: Test and Inspection Per
0020
0010
***
W
In process inspection & test requirement
Percentage of verification
Specification Details / Notes:
100 % shall be performed on all pressure components and
welds of alloy materials. See SAES for exceptions.
0030 W Basic Alloy Materials to be Verified Elements shall be in accordance with Table 1 of SAES-A-206.
0040 W Methods Shall be suitable for identifying the material of the major alloying
elements required in the applicable material specification or
welding procedure specification. See SAES for acceptable
0050 W Calibration of the Instrument Used Representative sample of the alloy material to be used.
0070 R Rejection Procedures Shall be in place to ensure that rejected components are
segregated and properly identified to prevent reuse. See SAES
for details.
0080 X Records for Shop Fabrication Per SAES A-206. Detailed recording / logging procedure shall
be prepared by the Equipment Manufacturer or Shop
Fabricator.
0090 X Records for Field Fabrication Saudi Aramco Inspector to review the proposed testing,
logging, identification, and final installation procedures for all
components requiring PMI testing onsite.
0030
0100
***
H X
Final inspection & test requirements
Final PMI Report
Specification Details / Notes:
Shall be reviewed by the Saudi Aramco Inspector prior to final
acceptance.
IR320300 Continued...
INSPECTION & TESTING REQUIREMENTS REVISION: 10/31/2016 CODE NUMBER: PAGE:
SAUDI ARAMCO FORM-175 REPLACES: 01/29/2013 IR320300 2 of 2
(1).VISUAL INSPECTION BY BUYER INSPECTION REPRESENTATIVE
(2) REVIEW AND VERIFICATION OF MATERIAL CERTIFICATES AND INSPECTION RECORDS
(3) SUBMISSION OF MANUFACTURING, INSPECTION AND QUALITY RECORDS
0130 R X Certificate of Compliance
Notes:
(1) Refer detailed instruction sheet SA175 form IR000003 of inspection requirement for ideal use of this form.
End of IR320300