Dear Sirs,
Along with this letter, you will receive important information on the delivery and installation of
your machine as well as on its future operation. We ask that you complete the enclosed
documents and return them so that we receive them by Monday, August 15, 2022. This
information will help us to optimally prepare the system for commissioning and production
start in your plant.
As a guideline for how to organize unloading and installing the production system, we have
summarized important information in the "Check list for delivery, installation - ACS production
system." You will also receive the machine layout with the corresponding connection
specifications as a separate document at a later point in time.
If you have any further questions on how to transport or unload the machine, please do not
hesitate to contact our Sales department. Thanks in advance for your support!
Best regards,
RATTUNDE AG
Seite 1 von 23
Table of contents
Seite 2 von 23
In order to be able to optimally prepare the preliminary acceptance, we need some information
from you. Please specify two products you want us to present on your machine on the day of
the preliminary acceptance. Please make sure to send us the corresponding test material in a
timely manner. Please make sure that the products you are selecting match the tool
dimensions you have ordered. In case you did not order any tools together with the machine,
we ask that you send us the corresponding tool together with test material.
Specification of product 1
Tube dimension
Material diameter (outside) Ø ___________________
Wall thickness = t ___________________
Product length ___________________
Profile dimensions
Material width = a ___________________
Material height = b ___________________
Edge radius = r ___________________
Please mark your product
in the drawing above! Product length ___________________
Seite 3 von 23
Specification of product 2
Tube dimension
Material diameter (outside) Ø ___________________
Wall thickness = t ___________________
Product length ___________________
Profile dimensions
Material width = a ___________________
Material height = b ___________________
Edge radius = r ___________________
Please mark your product Product length ___________________
in the drawing above!
Seite 4 von 23
The test material as well as the containers for stacking during the preliminary acceptance and
for the return transport of the material are provided by the customer. The customer organizes
the transport and the return transport of the containers. Please make sure that we have the
test material and the containers available in a timely manner.
Please mark the material with the project no. 23F70 and the purpose "Preliminary
acceptance."
For product 1
Seite 5 von 23
For product 2
Seite 6 von 23
Seite 7 von 23
Depending on the VPN protocol used, an encryption can be also added as a benefit resulting
from the VPN. The encryption permits tamper-proof and tap-proof communication between the
VPN partners.
RATTUNDE offers its customers the option to select between two different variants. Some
information is required to prepare the installation. Please complete the fields below carefully
and return this form to RATTUNDE. Please also designate a competent contact person we
can contact in case of questions.
[ ] SubNetMask ________.________.________.________
NTP-Server:
[ ] IP-address: ________.________.________.________
Seite 8 von 23
Furthermore RATTUNDE requires unlimited access for Remote Control Unit (RCU) for the
following aims:
Optional, if possible:
HTTP 80 TCP any
HTTPS 443 TCP any
2. Separate DSL-access
The following information has to be provided by the customer for the RCU:
IT administrator responsible:
Telephone number:
Seite 9 von 23
4 NETWORK TYPES
-Sheet 1 of 4-
MACHINE NO./PROJECT 23F70
Please return completed form by August 15, 2022 (Monday).
Seite 10 von 23
4 NETWORK TYPES
-Sheet 2 of 4-
MACHINE NO./PROJECT 23F70
Please return completed form by August 15, 2022 (Monday).
Seite 11 von 23
4 NETWORK TYPES
-Sheet 3 of 4-
MACHINE NO./PROJECT 23F70
Please return completed form by August 15, 2022 (Monday).
Seite 12 von 23
4 NETWORK TYPES
-Sheet 4 of 4-
MACHINE NO./PROJECT 23F70
Please return completed form by August 15, 2022 (Monday).
Seite 13 von 23
Keep the route needed to transport the machine to its final destination
clear. Please ensure that the floor is level/installation surface without any drill holes.
5.1 UNLOADING
Seite 14 von 23
Seite 15 von 23
Compressed air connection with air dryer prepared as per the layout
5.5 MISCELLANEOUS
Seite 16 von 23
Seite 17 von 23
The following technical connection values must be prepared by the customer at the
production system installation site. The work required for this must be completed before
delivery in order to ensure that the installation proceeds smoothly.
Preparation of the water supply line for the washing machine WDM.
(Important! Use filtered water.)
For the exact connected loads please refer to the layout that you will receive later.
Seite 18 von 23
For the commissioning of the ACS105/1.0 production system, you should keep the lubricants
and operating supplies listed below at hand. They guarantee correct and reliable operation.
You can also find our sources of supply in the list:
7.1 LUBRICANTS
Seite 19 von 23
MOLYCOTE DX DuPont
www.dupont.com
- Grease gun for the vertical adjustment of the BM bundle loading magazine
- Consumption: approx. 1 kg/year Quantity supplied: 1 kg
The use of substitute products is not allowed; this voids any claims under the warranty.
Non-compliance with the lubricant specifications or the use of lubricants that are different
from those recommended in the table can result in malfunction of the machine and in
premature wear of machine components. Machine damage caused by the use of
inappropriate lubricants is excluded from any claims under the warranty.
Seite 20 von 23
RIVOLTA T.F.L.-SPRAY
- Multifunction oil with PTFE for all stoppers
WEICON MULTI-SCHAUM
- Cleaning of inspection windows
Consumption: Approx. half a bottle/cleaning
INDUSTRIAL CLEANER based on soapy water (we recommend Würth BMF cleaner)
- Cleaning of all machine housings
Seite 21 von 23
The customer has to supply the following tools and operating supplies:
Immersion pump to pump off the washing medium when changing the medium (only for
WDM)
Cotton cleaning cloths
Hand brush
Pump spray bottle for BMF cleaner
Flashlight
Seite 22 von 23
Included in delivery:
Seite 23 von 23