Template 1 Date
Project Atacama Country
Design 130MWp - Topo & CAPEX Currency
Item Reference unit
1 MAIN EQUIPMENT
1.1 DC Side
1.1.1 PV module Number of PV modules
1.1.2 Electrical boxes DC electrical boxes
1.1.3 Electrical big boxes DC electrical big boxes
1.2 AC Side
1.2.1 Power stations Main peak power
2 CIVIL WORKS
2.1 Site Conditions
2.1.1 Clearing and grubbing Fence area
2.1.2 Topsoil and vegetation removal Removal area
2.1.3 Internal roads Roads length
2.1.4 Road ditches Road ditches length
2.2 Foundations
2.2.1 Power Station foundation Number foundations PS
2.2.2 Structure Poles Op.1 - Driving into the ground Number foundations structure
2.3 Trenches and manholes
2.3.1 Low Voltage manholes Number LV manholes
2.3.2 Medium Voltage manholes Number MV manholes
2.3.3 Trench 400mm x 1000mm Lv trenches
2.3.4 Trench 800mm x 1000mm Lv trenches
Mv trenches
2.3.5 Trench 800mm x 1500mm Mv trenches
2.3.6 Trench 800mm x 2000mm Mv trenches
2.3.7 Earthing trenches Earthing trenches vol
2.3.8 Ancillary services trenches AC trenches vol
2.4 Security and control
2.4.1 Chain link fence Fence perimeter
2.4.2 Access gates Number access gates
2.4.3 Light pole foundations Number foundations light pole
2.4.4 Video camera foundations Number foundations video camera
3 ELECTRICAL SYSTEM
3.1 LV DC Electrical String cabling
3.1.1 Cable LV DC IEC 4mm CU Cable LV DC IEC 4mm² CU
3.1.2 Cable LV DC IEC 10mm CU Cable LV DC IEC 10mm² CU
3.2 LV DC Electrical System cabling
3.2.1 Cable LV DC IEC 300mm AL Cable LV DC IEC 300mm² AL
3.2.2 Cable LV DC IEC 630mm AL Cable LV DC IEC 630mm² AL
3.3 MV Electrical cabling
3.3.1 Cable MV AC IEC 300mm AL Cable MV AC IEC 300mm² AL
3.4 Earthing System
3.4.1 Earthing cable (LV & MV trenches) Trenches earthing cable length
3.4.2 Earthing cable (Power Station)) PS earthing cable length
3.4.3 Earthing rods (Power Station) Earthing rods
3.5 AC Ancillary System
3.5.1 Auxiliary AC Cable for the perimeter Auxiliary AC Cable for the perimeter
3.6 Communication / Monitoring System
3.6.1 Multi Mode Fiber Optic Cable (Control System) Multi Mode Fiber Optic Cable
3.6.2 Single Mode Fiber Optic Cable (Security System) Single Mode Fiber Optic Cable
3.6.3 RS 485 Com cable (Monitoring System) RS 485 Com cable
3.7 Connectors
3.7.1 MV Connectors Number MV connectors
4 MISCELLANEOUS
4.1 Monitoring system
4.1.1 Weather Station Number weather stations
4.1.2 Monitoring system (SCADA) Monitoring systems
4.1.3 Remote Terminal Units Number remote terminal units
4.2 Security and Control System
4.2.1 Control Unit Control units
4.2.2 Lighting Number lights
4.2.3 Video cameras Number video cameras
4.2.4 Domo cameras Number domo video cameras
4.2.5 Microwave barriers Number microwave barriers
4.2.6 Microphone cable Fence perimeter
4.3 Buildings
4.3.1 Control room building Number control buildings
4.3.2 Warehouse building Number warehouse buildings
01/04/2021 15:08:40
CL
$
ference unit Amount Unit Unitary price Pre-tax price
$ 0% 29,232,000.00 $
$ 0% 84,000.00 $
$ 0% 6,500.00 $
$ 0% 13,008,200.00 $
$ 0% 192,278,228.43 $
$ 0% 38,455,645.69 $
$ 0% 1,168,580.00 $
$ 0% 1,168,580.00 $
$ 0% 1,700.00 $
$ 0% 3,360,000.00 $
$ 0% 112,200.00 $
$ 0% 16,200.00 $
$ 0% 2,068,029.51 $
$ 0% 216,389.53 $
$ 0% 411,173.03 $
$ 0% 232,748.05 $
$ 0% 33,259.17 $
$ 0% 12,721.95 $
$ 0% 93,171.86 $
$ 0% 621,145.72 $
$ 0% 100.00 $
$ 0% 12,500.00 $
$ 0% 6,300.00 $
$ 0% 29,871,580.39 $
$ 0% 14,086,607.16 $
$ 0% 21,990,461.41 $
$ 0% 7,841,578.60 $
$ 0% 6,893,853.13 $
$ 0% 6,169,270.66 $
$ 0% 56,542.00 $
$ 0% 13,600.00 $
$ 0% 621,145.72 $
$ 0% 2,297,951.04 $
$ 0% 621,145.72 $
$ 0% 7,388,772.76 $
$ 0% 7,500.00 $
$ 0% 600.00 $
$ 0% 100.00 $
$ 0% 1,700.00 $
$ 0% 100.00 $
$ 0% 12,500.00 $
$ 0% 6,300.00 $
$ 0% 200.00 $
$ 0% 12,500.00 $
$ 0% 621,145.72 $
$ 0% 100.00 $
$ 0% 100.00 $
$ 381,114,727.22 $