You are on page 1of 3

Document Code

OPERATING PROCEDURE
TESDA-OP–CO-03
Rev. No. Page
00 1
Accreditation of Competency
Assessment Centers Issued By Date
Certificatio 08 March 2017
n Office

TESDA-OP-CO-03-F02
Rev. No.00-03/08/17

ACCREDITATION OF ASSESSMENT CENTER


SELF-ASSESSMENT CHECKLIST

Name of Assessment
JUN GO TECHNOLOGICAL INSTITUTE (JGTI) INC.
Center-Applicant
Address PANGANIBAN/ALCALA ST., SIPI, DARAGA, ALBAY
Email
Contact Number 09667163185 poalbay.jgti2016@gmail.com
address
Title of Qualification
ELECTRICAL INSTALLATION AND MAINTENANCE NC II
Applied for
Date Accomplished November 15, 2021
A. PHYSICAL STRUCTURE
Quantity
Item Remarks
Required Existing
A.1 Location and Area
A.1.1. Accessibility Accessible to public transport JGTI is accessible to
public transport.
A.1.2. Assessment area Minimum area provided to Assessment area
permits ample workplace for permits ample
candidates workplace for 10
candidates.
A.2. Lighting and Ventilation
A.2.1. Assessment room or Well lighted (30 – 40 Foot Assessment area is
laboratories Candle) well lighted.
A.2.2. Air conditioning unit Optional
A.2.3. Blowers/fans Quantity shall be according to Assessment
the size of the room area/room is well
ventilated with 3
ceiling fans, 2 wall
fans & 2 stand fans.
Large windows are
enough for the air to
penetrate area.
A.3 Auxiliary Room
A.3.1. Storeroom Storeroom for tools, materials Complied
(shelves properly labeled)
Bins/racks for critical materials Complied
A.3.2. Room for performance Must be able to accommodate Complied
assessment at least 10 candidates/ batch
A.3.3 Orientation Room / Must be able to accommodate Complied
Holding Area at least 10 candidates/ batch
A.3.4. Chairs and tables Available in the area Complied
A.3.5. Comfort rooms Clean and functional Complied
Document Code
OPERATING PROCEDURE
TESDA-OP–CO-03
Rev. No. Page
00 2
Accreditation of Competency
Assessment Centers Issued By Date
Certificatio 08 March 2017
n Office

Separate for male and female Complied


Located at convenient part of Complied
the building
A.4. Assessment Equipment, Hand tools, Supplies, Materials
A.4.1. Equipment In accordance with the list in
the Competency Assessment
A.4.2. Hand tools All tools & equipment
Tools of the Qualification supplies and
A.4.3. Supplies, materials applied for materials are
available in
accordance with the
requirements
prescribes in the
operating procedure.
A.5. Safety Provisions
A.5.1. Medicine cabinet With first aid kit and other Complied
medical paraphernalia
A.5.2. Open floor spaces Entrances and exits are Entrance and Exit
marked and maintained label were
maintained.
A.5.3. Work stations, tool Are appropriately grouped to Complied
panels and equipment provide ease of movement
A.5.4. Fire extinguishers Functional/valid/current Complied
Located in conspicuous and Complied
highly accessible locations/
places
A.5.5. Equipment lay out Arranged according to Complied
sequence of operations to
allow maximum use of
resources
B. Administrative
B.1.Documentary 1. Letter of Intent Attached
Requirements 2. SEC Registration or Complied
equivalent (CDA-
registered, RA, except
Sole Proprietorship)

3. Financial Statement Complied


 For New Company:
Paid up capital required
by the SEC
 For Existing: Latest
Audited by a third party
4. Business Permit (Current Attached
and Valid)
5. BIR Registration (Valid) Attached
6. Company Profile Attached
7. Organizational structure Updated
8. Staff complement and Updated
profile
9. Building lay out/ Floor plan Attached
10. Self-assessment checklist Attached
11. List of equipment/ tools Attached
and materials
Document Code
OPERATING PROCEDURE
TESDA-OP–CO-03
Rev. No. Page
00 3
Accreditation of Competency
Assessment Centers Issued By Date
Certificatio 08 March 2017
n Office

12. Location map Attached


13. Lease Contract/ Proof of Attached
Ownership of the
location/premises of the
14. Assessment Center
15. Fire Safety Certificate Attached
(Current and Valid)
B.2. Communication 1. Telephone/mobile phone Complied
Facilities 2. Fax machine/ internet Complied
connection
3. Computer with peripherals Complied
4. CCTV system (Functional) Complied
 Assessment Area (per
qualification)
B.3. Staff Complement
B.3.1. Manager ADELYN N. ALTAVANO
B.3.2. Cashier GENELYN S. MILLARE
B.3.3. Computer Operator/ GENELYN S. MILLARE
Data Encoder
B.3.4. Liaison Officer MAGELINE B. ATE
B.3.5. Processing Officer MAGELINE B. ATE

Submitte
d by:
ADELYN N. ALTAVANO
__________________________________ _______________________________
Name of Authorized AC Representative Signature

Assessment Center Manager April 18, 2022


___________________________________ _______________________________
Position/Designation Date of submission

You might also like