Professional Documents
Culture Documents
Lab#2 - Taping On Level Ground. Closed Traverse.
Lab#2 - Taping On Level Ground. Closed Traverse.
Objectives:
1. Locate a polygon. Five sides.
2. Record the distance between main stations by pacing and using steel tape.
3. Calculate the area of the polygon using the method of chain (tape) surveying.
4. Determine the difference in measurements.
5. Turned in the recorded video of instructions #1,2&3 with your solutions in #3&4.
Materials Used:
● Steel Tape
● Alternative Reference Points
Table I.
Note:
● I have 0.66 as my pace factor from Laboratory #1
● Method Used: Multiplied each pace count to the 0.66 pace factor in order to get the distance
in meters and be able to compare it eventually to the steel tape distance that is in units of
meter as well.
Guide instructions:
Fig. 2 Fig. 7
Assigned sides w/ Assigned sides w/
measurement measurement
A= 3.46 A= 3.47
B= 1.98 B= 1.98
C= 3 C= 3.04
SQ.M. = 3.00 SQ.M. = 2.96
Fig. 3 Fig. 8
Assigned sides w/ Assigned sides w/
measurement measurement
A= 1.98 A= 1.98
B= 3.46 B= 3.47
C= 4 C= 4.03
SQ.M. = 3.43 SQ.M. = 3.43
Fig. 4 Fig. 9
Assigned sides w/ Assigned sides w/
measurement measurement
A= 3.46 A= 3.47
B= 3.21 B= 3.23
C= 3 C= 3.1
SQ.M. = 4.45 SQ.M. = 4.59
Fig. 5 Fig. 10
Assigned sides w/ Assigned sides w/
measurement measurement
A= 3.21 A= 3.23
B= 4.27 B= 4.29
C= 3 C= 3.04
SQ.M. = 4.81 SQ.M. = 4.90