You are on page 1of 1

HANDING OVER OF KEYS

Issue Date: ______ __, 20__


Reference: VP-HAN-0004-19
(M/D/Y)
Client Name: M/s. Conserv Engineering
Project
NEW ARAB BANK HEADQUARTER Location: New Cairo, Egypt
Name:
Supply and Installation of Klariti Single
Scope:
Glazed System (raised-floor)

DETAILS
Receiver’s Name: ______________________________ Position: _________________
Date Received: ______________

Please fill this section for any comments:

__________________________________________________________________________________
__________________________________________________________________________________
__________________________________________________________________________________

This is to certify that the handing over of keys in 3rd floor of this project with 33 nos. (attached) was
carried out on ______, 20__ by Mr. /Ms. ________________.

Handed Over by: Taken Over by:

Faisal Chempan _____________________


(Signature) (Signature)

VISTA SYSTEMS FOR PARTITIONS CONSERV ENGINEERING

You might also like