You are on page 1of 2

Method Statement

Project:
Location:
Element: Epoxy Painting
Index: 1. Purpose.
2. Scope.
3. References.
4. Equipment.
5. Materials.
6. Sequence of works.

Page | 1
1. Purpose:

This procedure covers the methodology to be followed for carrying out the epoxy paintings
with the approved technical specifications.

2. Scope:

2.1. Epoxy Paintings for floors.


2.2. Epoxy Paintings for Walls.

3. References:

3.1. Project Specification.


3.2. Approved Construction drawings, latest revision.

4. Equipment:

4.1. Wheel barrow.


4.2. Roller Brush.
4.3. Trowel.
4.4. Brush.
4.5. Shovels.

5. Materials:
5.1. Epoxy Sealer.
5.2. Epoxy Putty.
5.3. Epoxy painting

6. Sequence of works:
6.1. Removing dust and cleaning the whole area.
6.2. Repairing all grooves or cavities.
6.3. Painting the epoxy sealer.
6.4. Carrying out the epoxy putty.
6.5. Brushing the epoxy coats.