Project Document Number
TSB Phase 2 TS-SS-SC-VDM-2301
Development
Discipline Kangean Energy Indonesia Doc. Type
Subsea Control Vendor Data
KANGEAN ENERGY INDONESIA Ltd. Manufacture
Originator Revision Date
TUL 01-Nov-17
TABULATION OF REVISED PAGES
SHEET REVISIONS SHEET REVISIONS
A B 0 1 A B 0 1
1
2
3
4
5
6
7
8
9
10
11 X
12 X
13 X
ATTACHMENT APPENDIX
1 A
2 B
3 C
4 D
5 E
6 F
7 G
8 H
9 I
UmbilicalLengthSpecificationRev.0
Project Document Number
TSB Phase 2 TS-SS-SC-VDM-2301
Development
Discipline Kangean Energy Indonesia Doc. Type
Subsea Control Vendor Data
KANGEAN ENERGY INDONESIA Ltd. Manufacture
Originator Revision Date
TUL 01-Nov-17
TABLEOFCONTENTS
UmbilicalLengthSpecificationRev.0
Project Document Number
TSB Phase 2 TS-SS-SC-VDM-2301
Development
Discipline Kangean Energy Indonesia Doc. Type
Subsea Control Vendor Data
KANGEAN ENERGY INDONESIA Ltd. Manufacture
Originator Revision Date
TUL 01-Nov-17
1.0 INTRODUCTION
1.1 General
Kangean Energy Indonesia Ltd (KEI) is undertaking the development of Terang
Sirasun Batur (TSB) project in two phases:
x Phase-1; Development of the Terang Field (5 wells). Phase-1 production
commenced in 2012,
x Phase-2; Development of the Batur field (1 well; BTO-01) and Sirasun
field (3 wells; SIO-01, SIO-02 and SIO-03).
The gas from the fields flows to the Floating Production Unit (FPU) Joko Tole providing
separation, compression, dehydration, and supporting utilities systems. The treated
gas will be fiscally metered and exported via an 18-inch diameter transmission pipeline
to the East Java Gas Pipeline (EJGP) which delivers the gas to customers. The overall
system was designed to meet a maximum export gas rate of 330-MMscfd. Operation
of the fields will be controlled and supervised from the FPU Joko Tole.
The TSB fields is located in a seismically active area in the Bali Sea approximately
120 km from Pagerungan Island, off the north coast of East Java (Figure 1-1).
Figure1Ͳ1–TSBFieldLocation
UmbilicalLengthSpecificationRev.0
Project Document Number
TSB Phase 2 TS-SS-SC-VDM-2301
Development
Discipline Kangean Energy Indonesia Doc. Type
Subsea Control Vendor Data
KANGEAN ENERGY INDONESIA Ltd. Manufacture
Originator Revision Date
TUL 01-Nov-17
The TSB phase-2 development project comprises of subsea facilities for producing
gas from the Batur and Sirasun wells tied in to the existing TSB Phase-1 subsea
facilities shows schematic layout of the subsea facilities for TSB Phase-2.
Figure1Ͳ2–TSBPhase2SchematicLayout
KEI have contracted PT Timas Suplindo to perform the detailed engineering,
procurement, construction and installation (EPCI) for the TSB phase-2 subsea
facilities.
UmbilicalLengthSpecificationRev.0
Project Document Number
TSB Phase 2 TS-SS-SC-VDM-2301
Development
Discipline Kangean Energy Indonesia Doc. Type
Subsea Control Vendor Data
KANGEAN ENERGY INDONESIA Ltd. Manufacture
Originator Revision Date
TUL 01-Nov-17
APPENDIXA–UMBILICALLENGTHSPECIFICATION
UmbilicalLengthSpecificationRev.0
DETAILED / WORK PROCEDURE Page 1 of 7
Senior Project
Senior Project Engineer Project Manager
Function Engineer
Name Rachel Johnston Ben Rutter Elodie Bruyere
Rachel o=TECHNIP, Elodie Bruyere
Date Johnston cn=Ben Rutter
2017.10.26
2017.10.26 2017.10.26
15:40:41 15:46:19 23:39:16
Visa +01'00' +01'00' +01'00'
Date of
Rev Reason for Revising Established Verified Approved
Revision
Distribution List
Controlled
Functions Names
Copy No.
Contents
1.0 PURPOSE........................................................................................................................................................ 4
2.0 SCOPE............................................................................................................................................................. 4
3.0 REFERENCE LIST ......................................................................................................................................... 4
4.0 ABBREVIATIONS ......................................................................................................................................... 4
5.0 RESPONSIBILITIES ...................................................................................................................................... 5
6.0 DETAIL........................................................................................................................................................... 6
1.0 PURPOSE
1.1 The purpose of this “Umbilical Length Specification” document is to provide TU’s Newcastle production facility
with the definitive agreed umbilical length(s) and umbilical marking instructions and therefore ensure that sufficient
length of bundle / umbilical is being produced at every stage of manufacture
1.2 This “Umbilical Length Specification” document is an instruction for cutting this umbilical.
2.0 SCOPE
2.1 The scope of this “Umbilical Length Specification” document shall be limited to the TSB Phase 2 umbilicals.
2.2 The scope of this “Umbilical Length Specification” document shall be limited to the project umbilical cross sections
REF. [1] and REF. [2].
3.1 TU Documentation
REF. [1] DRG-DU064762-TUL-01-020 – Cross-Section: TSB Phase 2 Umbilical 1
REF. [2] DRG-DU064762-TUL-01-021 – Cross Section : TSB Phase 2 Umbilical 2
REF. [3] UDS-DU064762-TUL-01-020 – Umbilical Design Specification – Umbilical 1
REF. [4] UDS-DU064762-TUL-01-021 – Umbilical Design Specification – Umbilical 2
REF. [5] QHSE-SI-005 - Review and Verification prior to cutting Bundles, Sub-Bundles and Umbilicals
REF. [6] QHSE-F-032 – Final Umbilical, Bundle and Sub-Bundle Length marking and Review prior to cutting
REF. [7] APP-C-001 - Approval to Terminate Checklist
REF. [8] TS-SS-SC-MTO-2301 Material Take Off Subsea Umbilical (Client Specification)
3.2 This “Umbilical Length Specification” document shall be read in conjunction with TU Standing Instruction REF.
[3] & REF. [4].
4.0 ABBREVIATIONS
DCD Document Control Department
DQA Documentation of Quality Assurance
PMT Project Management Team
QA Quality Assurance
TLC Transmission Line Characteristics
TU TechnipFMC Umbilicals
UDS Umbilical Design Specification
ULS Umbilical Length Specification
UMS Umbilical Manufacturing Specification
UPS Umbilical Packing Specification
5.0 RESPONSIBILITIES
It is the responsibility of the TU Project team to obtain from the client the agreed umbilical lengths and to advise the
Logistics and Process departments accordingly. If there are any urgent changes that could impact on Production, the
TU QA department and Production shift supervisor must be informed.
It is the responsibility of the TU Project team to obtain from the client the agreed umbilical length marking details
and to advise the Logistics and Process departments accordingly.
It is the responsibility of the TU Production department to apply the length marking in accordance with this
“Umbilical Length Specification” (ULS) document, and the “Umbilical Packing Specification” (UPS) document.
5.3 Checking
It is the responsibility of the TU Production shift supervisor and quality control engineer to check, prior to cutting
umbilical components, sub-bundles and bundles, that the UMS and the ULS are consistent. This check shall be
recorded in accordance with TU Standing Instruction QHSE-SI-005 - Review and Verification prior to cutting
Bundles, Sub-Bundles and Umbilicals, REF. [5], QHSE-F-032 – Final Umbilical, Bundle and Sub-Bundle Length
marking and Review prior to cutting, REF. [6], and the relevant project documentation.
5.4 Cutting
It is the responsibility of the TU Production department to obtain approval to cut in accordance with “Final Umbilical,
Bundle and Sub Bundle, Length Marking and Review Prior to Cutting” QHSE-SI-005 (REF. [5]) by completing –
QHSE-F-032 (REF. [6]).
5.5 Discrepancies
In case of discrepancy during the review and verification of the information, the Process and Projects departments
must be contacted to confirm the required sub-bundle/umbilical length prior to any cutting taking place.
It is the responsibility of the TU Applications department to obtain approval to terminate the umbilical in accordance
with the APP-C-001 - Approval to Terminate Checklist, REF. [7].
6.0 DETAIL
6.1 Specification of umbilical length(s) for the purposes of umbilical cutting & termination of the TSB Phase 2 020
cross-section REF. [1].
6.2 Specification of umbilical length for the purposes of umbilical cutting & termination of the TSB Phase 2 021 cross-
section REF. [2].
7.1 The umbilical shall be length marked using Yellow background tape of typically 50mm wide and with Black
characters of 25mm wide and 50mm high.
7.2 The umbilical shall be marked every 1 meter for the first (and last) 10 metres (where possible).
7.3 The umbilical shall be marked every 5 meters for the first and last 50 metres.
7.4 The umbilical shall be marked every 10 meters for the first and last 400 metres.
7.5 Between the first and last 400 metres, the umbilical shall be marked every 100 metres.
7.6 Position and Specific Marking Requirements: Buoyancy is to be fitted to cobra head, therefore no umbilical marking
required.