EPCI OF TSB PHASE 2 DEVELOPMENT File Number :

PLANT LOCATION TRANSMITTAL IN DATE

CONTRACTOR PAGE
PT. Timas Suplindo 1 of 1

COMMENTS SHEET

Document Title
Electrical Cable Design - HDPE
Company Document Number
TS-SS-SC-RPT-2303
Revision Number
B
Transmittal IN Number

Transmittal OUT Number

Approval Status Code


A - APPROVED
KEI Document Approver

Company Status :

A APPROVED
B APPROVED WITH COMMENTS
C NOT APPROVED

Comments:

DISCIPLINE COMMENTS CONTRACTOR’S REPLY (IF ANY)


PIPELINE / INS NO COMMENT