WISMA BARITO PASIFIC II

PT TOTAL BANGUN PERSADA TBK

Ref:
DOCUMENT REVIEW - SHOP DRAWING Issue Date
Document Received from : PT. ABC Submission Ref Date : 13-Nov-18
Contract :
Document Type Shop Drawing X Specification Other please state
DOCUMENT STATUS
No DOC. TITLE DOC. No. Rev COMMENT
A B C D
FINISHING SCHEDULE

1 Finishing Schedule

A = NO COMMENT / ACCEPTED Sent by, Received by,


B = MINOR COMMENT ( See detail comment in the documents)
C = MAJOR COMMENTS ( see detail in document ) Resubmission required (Nama Engineer & perusahaannya) PT. GRIYA IDOLA
D = REJECTED
WISMA BARITO PASIFIC II
PT TOTAL BANGUN PERSADA TBK

DOCUMENT REVIEW - Material Approval ( PT. CAHAYA TEKNINDO Ref: CWJ DC PT. CTM
MAJUMANDIRI) Issue Date
Document Received from : PT. Ctm Submission Ref Date :
Contract : Dimas
Document Type Material Approval X Specification Other please state
DOCUMENT STATUS
No DOC. TITLE DOC. No. Rev COMMENT
A B C D

1 instalasi pipa drain ac 01/ App/ CTM - GI / II/ 2019

2 Grille , dippuser, Louvre 02/ App/ CTM - GI / II/ 2019

3 Volume dumper 03/ App/ CTM - GI / II/ 2019

4 Ducting suplay dan Exchaust fan 04/ App/ CTM - GI / II/ 2019

5 Fitting instalasi pipa drain 05/ App/ CTM - GI / II/ 2019

6 RPS

A = NO COMMENT / ACCEPTED Requested by, Issued by,


B = MINOR COMMENT ( See detail comment in the documents)
C = MAJOR COMMENTS ( see detail in document ) Resubmission required
D = REJECTED DIMAS JALU
WISMA BARITO PASIFIC II
PT TOTAL BANGUN PERSADA TBK

DOCUMENT REVIEW - Material Approval ( PT. CAHAYA TEKNINDO Ref: CWJ DC PT. CTM
MAJUMANDIRI) Issue Date
Document Received from : PT. Ctm Submission Ref Date :
Contract : Dimas
Document Type Material Approval X Specification Other please state
DOCUMENT STATUS
No DOC. TITLE DOC. No. Rev COMMENT
A B C D

1 Fan lantai baseman 3 10/ App/ CTM - GI / VI/ 2019

2 Fan lantai baseman 2 11/ App/ CTM - GI / VI/ 2019

3 Fan lantai baseman 1 12/ App/ CTM - GI / VI/ 2019

4 Lantai 2 13/ App/ CTM - GI / VI/ 2019

5 Parkir 1 14/ App/ CTM - GI / VI/ 2019

6 Parkir 2 15/ App/ CTM - GI / VI/ 2019

7 Parkir 3 16/ App/ CTM - GI / VI/ 2019

8 Parkir 4 17/ App/ CTM - GI / VI/ 2019

9 Parkir 5 18/ App/ CTM - GI / VI/ 2019

10 Roof 19/ App/ CTM - GI / VI/ 2019

A = NO COMMENT / ACCEPTED Requested by, Issued by,


B = MINOR COMMENT ( See detail comment in the documents)
C = MAJOR COMMENTS ( see detail in document ) Resubmission required
D = REJECTED DIMAS JALU
WISMA BARITO PASIFIC II
PT TOTAL BANGUN PERSADA TBK

DOCUMENT REVIEW - Material Approval ( PT. CAHAYA TEKNINDO Ref: CWJ DC PT. CTM
MAJUMANDIRI) Issue Date
Document Received from : PT. Ctm Submission Ref Date :
Contract : Dimas
Document Type Material Approval X Specification Other please state
DOCUMENT STATUS
No DOC. TITLE DOC. No. Rev COMMENT
A B C D

1 Flexible duct 23/ App/ CTM - GI / VII/ 2019

A = NO COMMENT / ACCEPTED Requested by, Issued by,


B = MINOR COMMENT ( See detail comment in the documents)
C = MAJOR COMMENTS ( see detail in document ) Resubmission required
D = REJECTED DIMAS JALU
WISMA BARITO PASIFIC II
PT TOTAL BANGUN PERSADA TBK

DOCUMENT REVIEW - Material Approval ( PT. CAHAYA TEKNINDO Ref: CWJ DC PT. CTM
MAJUMANDIRI) Issue Date
Document Received from : PT. Ctm Submission Ref Date :
Contract : Dimas
Document Type Material Approval X Specification Other please state
DOCUMENT STATUS
No DOC. TITLE DOC. No. Rev COMMENT
A B C D

1 Freon 24/ App/ CTM - GI / VII/ 2019

2 Gambar baseman 3 WBPII-ME-CTM-VAC-DN-201


WBPII-ME-CTM-VAC-PT-201.1
WBPII-ME-CTM-VAC-PT-201.2
WBPII-ME-CTM-VAC-PT-201.3
WBPII-ME-CTM-VAC-PT-201.4
WBPII-ME-CTM-VAC-PT-201.5

A = NO COMMENT / ACCEPTED Requested by, Issued by,


B = MINOR COMMENT ( See detail comment in the documents)
C = MAJOR COMMENTS ( see detail in document ) Resubmission required
D = REJECTED DIMAS JALU