Amount (Birr)
xƶ bçnW yts„ S‰ãC mlk!à snD msrT XSk²Ê DrS S‰ t̉Œ ys‰W S‰¼ÃqrbW :” êU
1,128,267.72
As per the attached statement the value of work executed and/or materials supplied to date is
tqÂ> ygNzb# LK¼BR¼
DEDUCTIONS AMOUNT (BIRR)
1. xSqDä yidq
Previous Approved
2. mÃÏ
53,727.03
Retention (5%)
3. mqÅ
Penalty
4. yQD¸Ã KFÃ
90,999.82
Advance payment (30%)
5. l@§
Others (10% for material supply)
Advance Repay W/out VAT With VAT DMR
144,726.85
yQD¸Ã KFà BR Total
Amount of Advance taken .-Q§§ DMR
983,540.87
1st 93,043.47 107,000.00 Net sum before VAT
2nd 179,955.99 206,949.39 (V.A.T 15%) due to Net Sum 147,531.13
(V.A.T 5%) due to Current Retention 8,462.01
Advance repaid
lt̉Œ y¸kfL gNzB
1,139,534.00
Net sum due to the Contractor
yS‰ t̉+/Contractor/
trUGÈ*L iDÌL
Certified Approved
Name Ayal Mengistu Name Ayal Mengistu
Signiture--------------- Signiture------------------
Date: 20 /03/2008 Date: 20 /03/2008
contractor Consultant
Name Name
Signature Signature
Date Date
BAHIR DAR PIPE FITTING FACTORY
1.2 Bulk Excavation over the site up to and average M3 64.77 0.01 0.65
depth of 60cm
1.4 Selected fill from site material around trench M3 63.96 0.01 0.64
and well compacted to an average layer of 25cm
1.5 Ditto 1.4 but under hard core M3 154.11 0.01 1.54
1.6 Cart away excavated surplus material from site M3 129.52 0.01 1.30
to distance of appropriate area
Basaltic or equivalent stone hard core well
1.7 rolled, conslidated and blinded with crushed M2 395.28 310.00 122,536.80
stone to a finshed thickness of 25cm
Total Carried to summary 143,628.42
2. MASONRY WORK
Basaltic or equivalent stone masonry
2.1 foundation bedded in cement sand mortar (1:4) M3 103.08 800.00 82,464.00
below NGL
Basaltic or equivalent stone masonry
2.2 foundation bedded in cement sand mortar (1:4) M3 72.44 1,000.00 72,443.75
above NGL
B. SUPER-STRUCTURE
1. CONCRETE
C-25 concreteWORK
cast into form work and vibrated
1.1 around rod reinforcement
a) In Elevation columns M3 4.62 0.01 0.05
b)top tie beam & lintels M3 92.39 50.00 4,619.50
9.80 Ditto, but for flushed mounted 2 gang two way Pcs 7.00 100.00 700.00
switch, 774005+774041 (legrand or equiv.)
contractor supervisor
Name Name
Signature Signature
Date Date
Ayal Mesenbet and friends Contractor
Project:- Yejubie Finance office
Location:- Yejubie Take off No:- 1
Client:- Baso Liben Wored Finance Office Page No: 1
Consultant:- Tatkin Consultant
Contractor:- Ayal Mesenbet and F
Block:- Office Building
T D S Description T D S Description
A.SUBSTRUCTURE
1.EXCAVATION & EARTH WORK
1.1 Site Clearing to Remove Top soil to and average
depth of 20cm 1.7 Basaltic or equivalent stone hard core well rolled,
conslidated and blinded with crushed stone to a finshed
thickness of 25cm
2 26.8
2 31 L= 2*(31*9.2)+(13.5*9.2) = 694.6 5.6
9.2 300.16 m2
570.4 m2 16.4
1 13.5 5.8
9.2 95.12 m2
124.2 m2 395.28 m2 (total)
694.6 m2 (total) 2. Masonary Work
1.2 Bulk Excavation over the site up to and average 2.1 Basaltic or equivalent stone masonry foundation bedded
depth of 60cm in cement sand mortar (1:4) below NGL
32 Average depth = (30+60+0+0)/4 = 0.22 2 108.5
9.2 0.5 L = 2(28*2 + 5.2 *7+16.1) = 217
0.22 0.95
64.768 m3 103.075 m
2.23 (total)
Basaltic or equivalent stone masonry foundation bedded
1.3 Excavation for Trench masonry Not exceeding in cement sand mortar (1:4) above NGL
2 to a depth of 50cm starting from RGL 2
106.6 28
0.9 L = 2(28.4*2 +4.8*7 +16.2) * 0.9*1.1 = 211.1 0.5 Average depth L1 = (0.4+ 0.38 +1.2 +1.1)/4 = 0.77
0.75 0.77
143.91 m3 21.56 m3
25 Average depth, L2 = (0.3+0.3 +0.2+0.3)/4 = 0.3 0.5 Average depth L5 = (0.3+ 0.47 )/2 = 0.385
4.7 0.385
0.3 0.90475 m3
35.25 m 3
6 4.7 Average depth L6 = (0.3+ 0.3+0.9+0.75)/4 = 0.56
1.4 1.3m wide precast concrete pavement infront of 3.3 Supply & fix G-28 galvanized flat metal sheet down pipe
the building (the price includes 30cm compacted secured to walls with metal straps with two coats of rust
2 23.1 red ash fill) resisting paint.
15 4 b) Size 100*100mm
46.2 m 60 m
4 Carpentry and joinery
14 4.1 all structural members shall be well seasoned and truss
14 m joint shall be firmily fixed to concrete top tie beam with 6mm
60.2 m (total) 2 50 plain bars.
6.8 a) 10-12 cm euclyptus lower/upper mem.
2 Hollow Concret Block Work 680 m
2 2.1 20*20*40cm concret HCB of class C wall beded 2
28 26
in cement sand mortar (1:4)
4.1 6.8
229.6 m2 353.6 m
1033.6 m (total)
29 15 76 b) 8-10 cm euclyptus bracing and internal mem
4.1 1140 m
118.9 m 2
2 28 4.2 suplly and fix 5*7 cm zigiba wood purlins fixed to truss by
9 means of nails
19
2.7 504 m
51.3 m2 9 16.6
2 5 149.4 m
3.55 35.5 Averag height; 4.1+3/2=3.55m 653.4 m (total)
2 23 Deduct door = (1.8 *2.1) + ( 0.9*2.1*11) = 24.57 4.3 8 mm thich chip wood celing divided into 60*120 cm
Deduct window = (1.8 *1.2*24) + ( 0.9*1.2*2) = 54 2 panels with 10 mm recess b/n joints, fixed to 5*4 cm sawn
2.7 124.2 26.8 zigiba wood battens in both directions incl. 3*4 cm tid or
equi.
559.5 78.57 5.6 300.16
480.93 m2 (total) 16.4
2 5.6 91.84 m2
2.2 Ditto 2.1, But 15*20*40 cm class C HCB wall
10 4.6 392 m2 (total)
2.7 248.4 m2
5.1 All metal doors and windows shall be fabricaed from
3 Rofing 5locally
Metal Work LTZ profile, with the necessary iron
manufactured
mongers accessories and three coats of synthethic enamel
paint. Glazing is mesured separetly. SDI type, steel doors
3.1 G-35 GCI sheet zigiba wood roofing fixed to 5*7 covered on one side with 0.8 mm thick corrugated sheet
cm zigiba purlins, at c/c 90 cm & 8-10 cm euclyptus metal.
2 6.8 trusese. G-28 flat metal roof ridge cover & three Windows size
roofing purlins 2
28 2 a) 120*90 cm
380.8 24 24 b) 120* 180 cm
15.4 m2 Door size
6.8 104.72 11 11 a) 90* 210 cm
485.52 3.2 Supply & fix G-28 galvanized flat metal sheet 1 1 b) 180 * 210 cm
gutter spliced & welded at joints with two coats of
rust resisting paint. 6 Plastering
2 6.1 Apply three coats of cement mortar plaster 1:3 to
2 21.8 a) 65 cm development length 2 28 a) for internal and external HCB wall
43.6 m 4.7 526.4
1 16.6 2 29
16.6 m 4.7
60.2 m (total) 272.6
2 8. Painting
2 28 2
2 Apply three coate of approved type plastic paint to plastered
3 336 26.8 wall surface
6 4.1 439.52
2 4.6 2 29 8.1 a) for internal and external HCB wall
3 165.6 4.1 237.8 .
2 2
2 4.6 Average height = 4.7+3.2/2 =3.95m 2 23
3.95 72.68 2.7 248.4
2 23 2 19
0.9 41.4 2.7 102.6
2 23 2
0.3 13.8 2 4.6
19 4 73.6
2
0.9 17.1
16.6 10 4.6
0.3 4.98 2.7 248.4
15 0.62 1350.32 Deduct door = 24.57*2= 49.5m2
2.7 25.11 3.14*Diam. Deduct window = 54*2 = 108m2
1475.67 m2 ( sub total) Deduct door = 24.57*2= 49.5m2 1192.82 m2 (total)
Deduct window = 54*2 = 108m2 2 28 8.2 b) for beam and columns
1318.17 m2 (total) 0.3 16.8
2
6.2 Apply rendering of cement mortar plaster 1:3 to
externa wall
2 28 3 28
4.7 263.2 0.3 50.4
29 2 23
4.7 136.3 0.8 36.8
2 5 2 21.8
3.95 39.5 Average height = 4.7+3.2/2 =3.95m 0.3 13.08
439 m2 (sub-total) 29
Deduct window = 1.8*1.2 * 17 = 54*2 = 36.72m2 0.3 8.7
402.28 m2 (total) 3 29
2 26.8 6.3 5 cm Cement screed 0.3 26.1
5.8 310.88 19
16.4 0.8 15.2
5.8 95.12 16.6
46.8 0.3 4.98
0.2 9.36 door L = 1.2*3 + 18*24 = 46.8 m 2 6.2
415.36 0.3 3.72
7 Glazing 2