Professional Documents
Culture Documents
SCORING M T W T F S S M T W T F S S M T W T F S S M T W T F S S M
(Insert Skill Level Key Result)
NAME AREA TRAINER START END TIME
Basic Sequence System
SCHEDULE
Knowledge Inspection Support
Wave 1
Indah Purwati Sewing PMS QMS - QA Mon, 1/3/2022 Mon, 1/3/2022 07.00-09.00
Ika Aisyahturokhmah Sewing PMS QMS - QA Mon, 1/3/2022 Mon, 1/3/2022 07.00-09.00
Agnes Tiara Novita Sewing P1 QMS - QA Mon, 1/3/2022 Mon, 1/3/2022 07.00-09.00
Dinda Citra Sakinah Sewing P1 QMS - QA Mon, 1/3/2022 Mon, 1/3/2022 07.00-09.00
Via Assy P1 QMS - QA Mon, 1/3/2022 Mon, 1/3/2022 07.00-09.00
Afziatun nisa Assy P1 QMS - QA Mon, 1/3/2022 Mon, 1/3/2022 09.00-11.00
Leilina Assy P1 QMS - QA Mon, 1/3/2022 Mon, 1/3/2022 09.00-11.00
Khoerunisa N Sewing P2 QMS - QA Mon, 1/3/2022 Mon, 1/3/2022 09.00-11.00
Asri Yati Assembly P2 QMS - QA Mon, 1/3/2022 Mon, 1/3/2022 09.00-11.00
Devi Anjeli Sukma Sewing P2 QMS - QA Mon, 1/3/2022 Mon, 1/3/2022 09.00-11.00
Wave 2
Yeni Purwati Sewing PMS QMS - QA Tue, 1/4/2022 Tue, 1/4/2022 07.00-09.00
Widianingrum Sewing PMS QMS - QA Tue, 1/4/2022 Tue, 1/4/2022 07.00-09.00
Puspa Nur Lailani Sewing P1 QMS - QA Tue, 1/4/2022 Tue, 1/4/2022 07.00-09.00
Eka Yuniar Sewing P1 QMS - QA Tue, 1/4/2022 Tue, 1/4/2022 07.00-09.00
Tanisa Solikhati Sewing PMS QMS - QA Tue, 1/4/2022 Tue, 1/4/2022 07.00-09.00
Hesti Isnaeni Sewing PMS QMS - QA Tue, 1/4/2022 Tue, 1/4/2022 09.00-11.00
Raden Assy P1 QMS - QA Tue, 1/4/2022 Tue, 1/4/2022 09.00-11.00
Bela Safitri Assy P1 QMS - QA Tue, 1/4/2022 Tue, 1/4/2022 09.00-11.00
Rohmatunisa Assy P1 QMS - QA Tue, 1/4/2022 Tue, 1/4/2022 09.00-11.00
Afrotunisa Assy P1 QMS - QA Tue, 1/4/2022 Tue, 1/4/2022 09.00-11.00
Wave 3
Lutfiatun Nisa Sewing PMS QMS - QA Wed, 1/5/2022 Wed, 1/5/2022 07.00-09.00
Adenia Febri Damayanti Sewing PMS QMS - QA Wed, 1/5/2022 Wed, 1/5/2022 07.00-09.00
Lutfiatun Nisa Sewing PMS QMS - QA Wed, 1/5/2022 Wed, 1/5/2022 07.00-09.00
Adenia Febri Damayanti Sewing PMS QMS - QA Wed, 1/5/2022 Wed, 1/5/2022 07.00-09.00
Sugiarti Retno Sari Sewing P1 QMS - QA Wed, 1/5/2022 Wed, 1/5/2022 07.00-09.00
Aprilliyani Khasanah Sewing P1 QMS - QA Wed, 1/5/2022 Wed, 1/5/2022 09.00-11.00
Laela Assy P1 QMS - QA Wed, 1/5/2022 Wed, 1/5/2022 09.00-11.00
Endang Aori Assy P1 QMS - QA Wed, 1/5/2022 Wed, 1/5/2022 09.00-11.00
Frefi Lusi Assy P1 QMS - QA Wed, 1/5/2022 Wed, 1/5/2022 09.00-11.00
Bunga Jayanti Sewing PMS QMS - QA Wed, 1/5/2022 Wed, 1/5/2022 09.00-11.00
Wave 4
Rahmatun Solikha Sewing PMS QMS - QA Thu, 1/6/2022 Thu, 1/6/2022 07.00-09.00
Yusti Intan Saphira Sewing P1 QMS - QA Thu, 1/6/2022 Thu, 1/6/2022 07.00-09.00
Risnopi Sewing P1 QMS - QA Thu, 1/6/2022 Thu, 1/6/2022 07.00-09.00
Adelia Nanda Safitri Sewing P1 QMS - QA Thu, 1/6/2022 Thu, 1/6/2022 07.00-09.00
Nur Eva Rahayu Sewing PMS QMS - QA Thu, 1/6/2022 Thu, 1/6/2022 07.00-09.00
Waeni Sewing PMS QMS - QA Thu, 1/6/2022 Thu, 1/6/2022 09.00-11.00
Attiyautus Sholihah Sewing P1 QMS - QA Thu, 1/6/2022 Thu, 1/6/2022 09.00-11.00
Dita Pujiasih Sewing P1 QMS - QA Thu, 1/6/2022 Thu, 1/6/2022 09.00-11.00
Sarohmah Assy P1 QMS - QA Thu, 1/6/2022 Thu, 1/6/2022 09.00-11.00
Wave 5
Tri Dewi Sutriawati Sewing PMS QMS - QA Fri, 1/7/2022 Fri, 1/7/2022 07.00-09.00
Rusdiana Assy P1 QMS - QA Fri, 1/7/2022 Fri, 1/7/2022 07.00-09.00
Khasbiatun Hikmah Assy P1 QMS - QA Fri, 1/7/2022 Fri, 1/7/2022 07.00-09.00
Siti Amalia Sewing PMS QMS - QA Fri, 1/7/2022 Fri, 1/7/2022 07.00-09.00
Eggyta Tiara Wati Sewing P1 QMS - QA Fri, 1/7/2022 Fri, 1/7/2022 07.00-09.00
Andini Falina Sewing P1 QMS - QA Fri, 1/7/2022 Fri, 1/7/2022 09.00-11.00
Dwi Apri Yuliani Sewing P1 QMS - QA Fri, 1/7/2022 Fri, 1/7/2022 09.00-11.00
Tri Dewi Sutriawati Sewing PMS QMS - QA Fri, 1/7/2022 Fri, 1/7/2022 09.00-11.00
Tri Susanti Final Inspection QMS - QA Fri, 1/7/2022 Fri, 1/7/2022 09.00-11.00
Cathy Lambar Praditya Sewing PMS QMS - QA Fri, 1/7/2022 Fri, 1/7/2022 09.00-11.00
Wave 6
Safina Melati Sukma Sewing PMS QMS - QA Sat, 1/8/2022 Sat, 1/8/2022 07.00-09.00
Nurul Aenun Fitria Sewing PMS QMS - QA Sat, 1/8/2022 Sat, 1/8/2022 07.00-09.00
Nur Fitriana Sewing PMS QMS - QA Sat, 1/8/2022 Sat, 1/8/2022 07.00-09.00
Khusnul Akhiroh Sewing PMS QMS - QA Sat, 1/8/2022 Sat, 1/8/2022 07.00-09.00
Maesaroh Sewing PMS QMS - QA Sat, 1/8/2022 Sat, 1/8/2022 07.00-09.00
Hafrida Pelangi Assy P1 QMS - QA Sat, 1/8/2022 Sat, 1/8/2022 09.00-11.00
Ani Aprilia Assy P1 QMS - QA Sat, 1/8/2022 Sat, 1/8/2022 09.00-11.00
Putri Hana Assy P1 QMS - QA Sat, 1/8/2022 Sat, 1/8/2022 09.00-11.00
Mei Nur Assy P1 QMS - QA Sat, 1/8/2022 Sat, 1/8/2022 09.00-11.00
Wave 7
Mei Silviani Sewing PMS QMS - QA Mon, 1/10/2022 Mon, 1/10/2022 07.00-09.00
Alfina Rahmawati Sewing PMS QMS - QA Mon, 1/10/2022 Mon, 1/10/2022 07.00-09.00
Puput Esa Rahma Dina Sewing PMS QMS - QA Mon, 1/10/2022 Mon, 1/10/2022 07.00-09.00
Sri Rahayu Ningsih Sewing PMS QMS - QA Mon, 1/10/2022 Mon, 1/10/2022 07.00-09.00
Esa Jan Avita Sewing PMS QMS - QA Mon, 1/10/2022 Mon, 1/10/2022 07.00-09.00
Febriana Yuyun Assy P1 QMS - QA Mon, 1/10/2022 Mon, 1/10/2022 09.00-11.00
Avlia Azzatun Assy P1 QMS - QA Mon, 1/10/2022 Mon, 1/10/2022 09.00-11.00
Tria Rahmawati Assy P1 QMS - QA Mon, 1/10/2022 Mon, 1/10/2022 09.00-11.00
Ika Akmaliah Assy P1 QMS - QA Mon, 1/10/2022 Mon, 1/10/2022 09.00-11.00
Irma Indriyani Assy P1 QMS - QA Mon, 1/10/2022 Mon, 1/10/2022 09.00-11.00
Wave 8
Ely Nur Janah Sewing PMS QMS - QA Tue, 1/11/2022 Tue, 1/11/2022 07.00-09.00
Indriawati Sewing PMS QMS - QA Tue, 1/11/2022 Tue, 1/11/2022 07.00-09.00
Etik Marlinah Sewing PMS QMS - QA Tue, 1/11/2022 Tue, 1/11/2022 07.00-09.00
Siti Parikha Sewing PMS QMS - QA Tue, 1/11/2022 Tue, 1/11/2022 07.00-09.00
Betri Nur Aliasari Sewing PMS QMS - QA Tue, 1/11/2022 Tue, 1/11/2022 07.00-09.00
Nur Aeni Assy P1 QMS - QA Tue, 1/11/2022 Tue, 1/11/2022 09.00-11.00
Feidahfun Damayanti Assy P1 QMS - QA Tue, 1/11/2022 Tue, 1/11/2022 09.00-11.00
Asgani Cahyamimhrum Assy P1 QMS - QA Tue, 1/11/2022 Tue, 1/11/2022 09.00-11.00
Rena Ranita Assy P1 QMS - QA Tue, 1/11/2022 Tue, 1/11/2022 09.00-11.00
Nur Atikah Assy P1 QMS - QA Tue, 1/11/2022 Tue, 1/11/2022 09.00-11.00
Wave 9
Jumiyati Sewing PMS QMS - QA Wed, 1/12/2022 Wed, 1/12/2022 07.00-09.00
Fatimah Sewing PMS QMS - QA Wed, 1/12/2022 Wed, 1/12/2022 07.00-09.00
Diyah Tri Noviyanti Sewing PMS QMS - QA Wed, 1/12/2022 Wed, 1/12/2022 07.00-09.00
Nur Handayani Sewing PMS QMS - QA Wed, 1/12/2022 Wed, 1/12/2022 07.00-09.00
Nur Atikah HI P1 QMS - QA Wed, 1/12/2022 Wed, 1/12/2022 07.00-09.00
Aulia Hikma S HI P1 QMS - QA Wed, 1/12/2022 Wed, 1/12/2022 09.00-11.00
Ade Siti Rahayu Assy P1 QMS - QA Wed, 1/12/2022 Wed, 1/12/2022 09.00-11.00
Erisma Nur P1 QMS - QA Wed, 1/12/2022 Wed, 1/12/2022 09.00-11.00
Tika Nuraeni Assy P1 QMS - QA Wed, 1/12/2022 Wed, 1/12/2022 09.00-11.00
Ainun Syafiroh Sewing PMS QMS - QA Wed, 1/12/2022 Wed, 1/12/2022 09.00-11.00
Wave 10
Isitiana Puji Astuti 2nd Process QMS - QA Thu, 1/13/2022 Thu, 1/13/2022 07.00-09.00
Puji Nur Utami 2nd Process QMS - QA Thu, 1/13/2022 Thu, 1/13/2022 07.00-09.00
Sassa Melinda FI QMS - QA Thu, 1/13/2022 Thu, 1/13/2022 07.00-09.00
Jihan Febriani FI QMS - QA Thu, 1/13/2022 Thu, 1/13/2022 07.00-09.00
Siti Nur Fatihah 2nd Process QMS - QA Thu, 1/13/2022 Thu, 1/13/2022 07.00-09.00
Siti Amalia Sewing PMS QMS - QA Thu, 1/13/2022 Thu, 1/13/2022 09.00-11.00
Nur Laely Fitriyani A.R Sewing PMS QMS - QA Thu, 1/13/2022 Thu, 1/13/2022 09.00-11.00
Yulia Rahma Faradina Sewing PMS QMS - QA Thu, 1/13/2022 Thu, 1/13/2022 09.00-11.00
Tisna Asmiati Sewing PMS QMS - QA Thu, 1/13/2022 Thu, 1/13/2022 09.00-11.00
Serli Destiana Assy P1 QMS - QA Thu, 1/13/2022 Thu, 1/13/2022 09.00-11.00
Wave 11
Jumiyati Sewing PMS QMS - QA Fri, 1/14/2022 Fri, 1/14/2022 07.00-09.00
Fatimah Sewing PMS QMS - QA Fri, 1/14/2022 Fri, 1/14/2022 07.00-09.00
Rara Aprilianingsih 2nd Process QMS - QA Fri, 1/14/2022 Fri, 1/14/2022 07.00-09.00
Tuti Haryani Cutting QMS - QA Fri, 1/14/2022 Fri, 1/14/2022 07.00-09.00
Lutfia Amalia Cutting QMS - QA Fri, 1/14/2022 Fri, 1/14/2022 07.00-09.00
Arlyana Meiliza Assy P1 QMS - QA Fri, 1/14/2022 Fri, 1/14/2022 09.00-11.00
Lutfi Nadia Assy P1 QMS - QA Fri, 1/14/2022 Fri, 1/14/2022 09.00-11.00
Siti Nurhikmah 2nd Process QMS - QA Fri, 1/14/2022 Fri, 1/14/2022 09.00-11.00
Nur Rochmah 2nd Process QMS - QA Fri, 1/14/2022 Fri, 1/14/2022 09.00-11.00
Diyah Tri Noviyanti Sewing PMS QMS - QA Fri, 1/14/2022 Fri, 1/14/2022 09.00-11.00
Wave 12
Solikhatun Khotimah FI QMS - QA Sat, 1/15/2022 Sat, 1/15/2022 07.00-09.00
Sintia Karenina FI QMS - QA Sat, 1/15/2022 Sat, 1/15/2022 07.00-09.00
Voni Marsela 2nd Process QMS - QA Sat, 1/15/2022 Sat, 1/15/2022 07.00-09.00
Eka Marlina 2nd Process QMS - QA Sat, 1/15/2022 Sat, 1/15/2022 07.00-09.00
Anggi Rachmawati 2nd Process QMS - QA Sat, 1/15/2022 Sat, 1/15/2022 07.00-09.00
Istiana Puji Astuti 2nd Process QMS - QA Sat, 1/15/2022 Sat, 1/15/2022 09.00-11.00
Yulia Rahma Faradina FI QMS - QA Sat, 1/15/2022 Sat, 1/15/2022 09.00-11.00
Tisna Asmiati FI QMS - QA Sat, 1/15/2022 Sat, 1/15/2022 09.00-11.00
Nur Handayani Sewing PMS QMS - QA Sat, 1/15/2022 Sat, 1/15/2022 09.00-11.00
Ainun Syafiroh Sewing PMS QMS - QA Sat, 1/15/2022 Sat, 1/15/2022 09.00-11.00
Wave 13
Arsyi Kholviati 2nd Process QMS - QA Mon, 1/17/2022 Mon, 1/17/2022 07.00-09.00
Nok Tria Nurlita 2nd Process QMS - QA Mon, 1/17/2022 Mon, 1/17/2022 07.00-09.00
Devi Mela Andini FI QMS - QA Mon, 1/17/2022 Mon, 1/17/2022 07.00-09.00
Santi Nur Azizah FI QMS - QA Mon, 1/17/2022 Mon, 1/17/2022 07.00-09.00
Melia Fitrihatin FI QMS - QA Mon, 1/17/2022 Mon, 1/17/2022 07.00-09.00
Nur Faozah FI QMS - QA Mon, 1/17/2022 Mon, 1/17/2022 09.00-11.00
Umiyati Cutting QMS - QA Mon, 1/17/2022 Mon, 1/17/2022 09.00-11.00
Septi Gustianah Assy P1 QMS - QA Mon, 1/17/2022 Mon, 1/17/2022 09.00-11.00
Sulih Maulida Assembly P2 QMS - QA Mon, 1/17/2022 Mon, 1/17/2022 09.00-11.00
Nesa Ayunda FI QMS - QA Mon, 1/17/2022 Mon, 1/17/2022 09.00-11.00
Wave 14
Ika Nuraeni Assembly P2 QMS - QA Tue, 1/18/2022 Tue, 1/18/2022 07.00-09.00
Ulfa Setianur Assembly P2 QMS - QA Tue, 1/18/2022 Tue, 1/18/2022 07.00-09.00
Rindi Santika Stockfit P2 QMS - QA Tue, 1/18/2022 Tue, 1/18/2022 07.00-09.00
Siti Nurul Azizah Stockfit P2 QMS - QA Tue, 1/18/2022 Tue, 1/18/2022 07.00-09.00
Siti Nurafiyah Sewing P2 QMS - QA Tue, 1/18/2022 Tue, 1/18/2022 09.00-11.00
Putri Diana Sewing P2 QMS - QA Tue, 1/18/2022 Tue, 1/18/2022 09.00-11.00
Irma Indriyany HI P1 QMS - QA Tue, 1/18/2022 Tue, 1/18/2022 09.00-11.00
Rahma Selpia HI P1 QMS - QA Tue, 1/18/2022 Tue, 1/18/2022 09.00-11.00
Wave 15
Denisa Stockfit P2 QMS - QA Wed, 1/19/2022 Wed, 1/19/2022 07.00-09.00
Shindi Noviana Stockfit P2 QMS - QA Wed, 1/19/2022 Wed, 1/19/2022 07.00-09.00
Widianingsih Sewing P2 QMS - QA Wed, 1/19/2022 Wed, 1/19/2022 07.00-09.00
Mega Assy P2 QMS - QA Wed, 1/19/2022 Wed, 1/19/2022 07.00-09.00
Septia Regina Sewing P2 QMS - QA Wed, 1/19/2022 Wed, 1/19/2022 09.00-11.00
Desliya Ramadani Sewing P2 QMS - QA Wed, 1/19/2022 Wed, 1/19/2022 09.00-11.00
Wiwin Winani HI P1 QMS - QA Wed, 1/19/2022 Wed, 1/19/2022 09.00-11.00
Alisah Anahsikha HI P1 QMS - QA Wed, 1/19/2022 Wed, 1/19/2022 09.00-11.00
Dewi Nur Safitri Sewing P2 QMS - QA Wed, 1/19/2022 Wed, 1/19/2022 09.00-11.00
Wave 16
Anggun Riyani Pratiwi HI P1 QMS - QA Thu, 1/20/2022 Thu, 1/20/2022 07.00-09.00
Serlia Anggraeni HI P1 QMS - QA Thu, 1/20/2022 Thu, 1/20/2022 07.00-09.00
Yeni Rogmatul HI P1 QMS - QA Thu, 1/20/2022 Thu, 1/20/2022 07.00-09.00
Septi Gustianah Assy P1 QMS - QA Thu, 1/20/2022 Thu, 1/20/2022 07.00-09.00
Qutrotun Nabila Atika Assy P1 QMS - QA Thu, 1/20/2022 Thu, 1/20/2022 09.00-11.00
Nita Fransiska Assy P1 QMS - QA Thu, 1/20/2022 Thu, 1/20/2022 09.00-11.00
Wave 17
Lulu Norma Lalabah Assy P1 QMS - QA Fri, 1/21/2022 Fri, 1/21/2022 07.00-09.00
Siti Nur Karomah Assy P1 QMS - QA Fri, 1/21/2022 Fri, 1/21/2022 07.00-09.00
Silviana Izma Ashari Assy P1 QMS - QA Fri, 1/21/2022 Fri, 1/21/2022 07.00-09.00
Nikmahtun Assy P1 QMS - QA Fri, 1/21/2022 Fri, 1/21/2022 07.00-09.00
Rini Zaenatun 2nd Process QMS - QA Fri, 1/21/2022 Fri, 1/21/2022 09.00-11.00
Mela Sari Napika 2nd Process QMS - QA Fri, 1/21/2022 Fri, 1/21/2022 09.00-11.00
Sassa Melinda Sewing PMS QMS - QA Fri, 1/21/2022 Fri, 1/21/2022 09.00-11.00
PLAN TRAINING QUALITY FOR TM
Trainer :
1. Agustia
2. Isna
3. Dewi
4. Yulia
5. Anggun
6. Fayza
PARTICIPANT TRAINING : PLANT 2
DEPT/SECTION TOTAL MP LINE PARTICIPANT PER WAVE BY DEPT
CUTTING 18 - 18 1
SEWING 204 6 34 16
STOCKFIT 43 1 43 3
ASSEMBLING 114 1 114 9
TOTAL 379 209 29
Plan
TIMELINE Done
DATE
3-Jan 10-Jan 17-Jan 24-Jan 31-Jan 7-Feb 14-Feb 21-Feb 28-Feb 7-Mar 14-Mar 21-Mar 28-Mar
Plan Shcedule
Time Material Training Duration Method Trainer