Professional Documents
Culture Documents
FIREWALL FIREWALL
5
A A 4 SD SD SD SD SD AM
AM SD AM SD
OPENABOVE RM
TO TO
FACP FACP SD SD SD SD SD
A' A'
SD SD
SD SD SD SD SD SD SD SD SD SD SD AM
B B RM
LL
L
SD SD SD SD SD
L
A
A
FIREWALL
W
FIREWALL
EW
E
SD SD SD
R
UP
R
UP
SD SD SD SD SD AM
I
I
F
RM
C C
F
6 SD SD SD SD SD
3
SD SD SD
SD SD SD SD
SD SD SD SD SD AM
RM
SD SD SD SD SD
SD SD SD SD SD
D D
SD SD SD SD SD AM
E E
UP DN RM
TO FIRE EXIT
TO FIRE EXIT STAIRS
SD SD SD SD SD
UP STAIRS
SD SD SD SD SD AM
RM
SD SD SD SD SD
PROPERTY
SIDEWALK SIDEWALK
2 LINE
1
RAMP-UP RAMP-UP RAMP-UP
GENERAL NOTES:
1. ALL PLUMBING WORKS INCLUDED HEREIN SHALL BE EXECUTED IN ACCORDANCE WITH
THE PROVISION
BUILDING CODEOF
& THE
THE RULES
PHILIPPINE
& REGULATIONS
PLUMBING CODE,
OF THEALSO
FIRE CODE
OF THEOF
NATIONAL
THE PHILIPPINES.
2.
PROPER
ALL PIPESEXECUTION
SHALL BE INSTALLED
OF THE PLUMBING
AS INDICATED,
WORKS ANY
SHALL
RELOCATIONS
BE WITH PRIOR
REQUIRED
APPROVAL
FOR
OF THE ARCHITECT AND/OR ENGINEER.
4.
PROPOSED
INVERT ELEVATIONS
SANITARY
OFUTILITIES
ALL EXISTING
SHALL PIPES
CONFORM
& STRUCTURES
THE ACTUAL
AS VERIFIED
LOCATION,BY THE
DEPTH &
CONTRACTOR.
5.
SLOPES
(1%) & ONE-HALF
FOR SANITARY
(0.5%)
& MINIMUM
STORM DRAINAGE
RESPECTIVELY,
LINE SHALL
UNLESS
MAINTAINED
OTHERWISEONE
SPECIFIED.
PERCENT
AM ADDRESSABLE MONITORING/ZONE