AGRA - LUC

KNOW EXP
RESSWAY

LUCKNOW
UTTAR PRADESH

OPTION 1
51.00 Km
OPTION 4
65.00 Km

11
+0
00 SHAHID PATH
OPTION 3
OPTION 6
54.00 Km
62.00 Km

SAROJININAGAR
OPTION 2
55.00 Km

OPTION 5 17
+0
64.00 Km 00
PROPOSED LUCKNOW RING
ROAD (IN ADVANCE STAGE)

BANTHARA

BANI
LALPURA
Nawabganj 26
+5
00
Bird Sanctuary ASAKHERA DATAULI
NH-25
NAWABGANJ
OPTION 1
51.00 Km
OPTION 6
62.00 Km
PROPOSED KANPUR DAHI CHOWK
SH

RING ROAD (ON HOLD) KANTHA


8-3

MURTAZANAGAR

12
NH-25

.5K
OPTION 3

UNNAO 54.00 Km

M
OPTION 2
55.00 Km
PROPOSED TRANS
GANGA BARRAGE GANGA CITY

TAURA

58
SH- SARAIYAN OPTION 5
64.00 Km
PROPOSED 6 LANE ROAD
OPTION 4
NH 65.00 Km
321

-34
74+

NEORNA
AMARSAS
RAWAL

NH
5
-2

-31
KANPUR
NH

NH-2
5

egis
Consultancy Services for Preparation of Detailed Project Report of ANALYSIS OF ALTERNATIVE ALIGNMENT OF
egis Kanpur - Lucknow Expressway,having an approximate length of KANPUR - LUCKNOW EXPRESSWAY
NTS

75km (the "Project") including spurs through BOT and EPC basis
Egis India Consulting Engineers Pvt Ltd. (2nd Call)
NATIONAL HIGHWAYS Egis Tower , Plot No. 66, Sector-32,
RG
Gurgaon, Haryana-122001, India
AUTHORITY OF INDIA EIRH1UP028-NHAI-DPR-AP-PAKLE-01 R0