Cactus Wellhead Presentation
Cactus Wellhead Presentation
• Arrival/Welcome
• Safety Orientation
• Facility Tour
• Presentation on Basic Wellhead and API Requirements
• Lunch
• Stack-up of MBU-LR Speed Head System/Conventional
Wellhead System/Overview of Frac Tree Equipment
• Discussion | Q&A
Conventional Assemblies
• Include the casing head, casing
hangers, spool sections, tubing head,
tubing hanger, valves and fittings
• Provides safe and adequate means for
supporting and attaching blowout
control equipment during drilling
• Provides sealing between casing
strings and a connection for the
Christmas tree
• Requires manipulation of BOP’s with
each added section
• Tubulars suspended on “slips”
Casing Heads
O-Ring
Groove
Test Port
C2 Casing Head
(With LP Outlets and Baseplate)
Tubing Heads
Test Port
C2 Casing Hanger.
C1 Casing Hanger and H Standard automatic slip-
Plate. Non-Automatic slip- type casing hanger. Used
type hanger. Used to to suspend medium
suspend light to medium casing loads (50% joint
casing loads in C2 & strength) in C2 & C2BP
C2BP Casing Heads Casing Heads
BPV Threads
BPV Threads
CTH-2W
BPV Threads
11” 5M
MBS MBU
Multi-bowl Wellhead Systems
Threaded-on Flange Lock-Ring
2” LP
3” LP
Landing Ring
20” Casing
13-3/8” Casing
9-5/8” Casing
5-1/2” Casing
MBU-T MBU-LR
‘HPS’ Elastomer Secondary Seals
Interference fit provides pressure
energized seal. No plastic packing
required.
Springs in corners
prevent extrusion
Large ID interference
provides sealing on
rough casing
Type ‘P’ Elastomer Seal
OD bump provides
interference fit allowing
seal to be pressure
energized
Lockscrews
7-1/16” 10M
Potential Leaks
• Bonnet/Body
• Stem
• Body Fittings
Wellhead/Christmas Tree Safety
“Line of Fire”
• Test or injection
fittings
• Lockscrews
Wellhead/Christmas Tree Safety
Hidden Pressure
Wellhead/Christmas Tree Safety
Top of
cement
• API Specification 6A
• Twentieth Edition, October 2010
6A-U-EE-1.5-1-1
PR – Performance
API Spec 6A Requirement
4130 80K
(CMS-104)
4130 60K 4130 75K
DD Or 4130 60K (CMS-102)
(CMS-102) (CMS-103)
4140 80K
(CMS-105)
17-4 PH
(CMS-303)
410SS 410SS
FF-XX Or
(CMS-301) (CMS-301)
Inconel 718
(CMS-304)
Inconel 718
HH-XX ------ ------
(CMS-304)
Product Plan - Quality Control Requirements for Wellhead Bodies and Assemblies
The following chart details the Quality Control Requirements for all bodies. Applies to Casing and Tubing Heads,
Cross-Over Connectors, Tubing Head Adapters, Top Connectors Tees and Crosses, Adapter and Spacer Spools,
Casing and Tubing Hangers, Flanged Connectors Threaded Connectors, Other End Connectors.
CNT-002 or CNT-002 or
Surface NDE --- Process Router & EPS
CNT-004 CNT-004
Weld NDE --- CNT-008 CNT-008 Process Router & EPS, if applicable
S 0 (-18) -- -- 15 (20)
T 0 (-18) -- -- 15 (20)
U 0 (-18) -- -- 15 (20)
V 0 (-18) -- -- 15 (20)
Cactus Record Requirements
Bodies, End and Outlet Connections,
Mandrel Tubing Hanger and Casing PSL-1 PSL-2 PSL-3*
Hanger
Material Test Reports: Chemical analysis,
tensile test, impact test (if required) and X X X
hardness test
Weld Process Records: WPS, WPQR and
X X X
WQR
Bullplugs, Valve-Removal Plugs and Back- Material Test Reports : Chemical analysis, tensile test, impact
Pressure Valves test, and hardness test