Professional Documents
Culture Documents
To meet the objectives of Training for Work Scholarship Program (TWSP), Private Education Student Financial Assistance (PESFA), Special Training Employment Program (STEP), Tulong Trabaho Scholarship
Program (TTSP), Rice Extension Service Program (RESP), Coconut Farmers Scholarship Program (CFSP), Barangay Kabuhayan Skills Training Program (BKSTP), and Tsuper Iskolar, the following schedule
of costs per qualification are hereby adopted. The following training costs relative to the implementation of TESDA Scholarship Programs are based on the following cost factors: Variable Costs (consumables,
utilities, facilties, equipment and tools maintenance; honoraria of trainers; and living allowance); and Fixed Costs (miscellaneous fees, national assessment fees, instructional materials, and other allowances.).
Training duration of scholarship programs with entrepreneurship are inclusive of 3-day entrepreneurship training. Further, implementation of supervised industry learning (SIL) is not covered under the
scholarship program.
Allowance (Php)
Training Support Fund (TSF) Per Capita Cost (Php)
No. of No. of National Book
Qualification Training Tsuper Iskolar Allowance
Sector No. NET Qualification Title Training Training Assessment
Code Cost (PhP) (PhP 350.00/day for .For PESFA TWSP and Tsuper
Hours Days Fee (PhP) PESFA
maximum of 35only BKSTP Iskolar
8 hours) days 8 Hours)
fre/(8 hrs
a b c d e g h 1 j k Pg+h+i ni=g+li+i+k n=g+ht
per day)
Agriculture,
Forestry, and 21 AFFGRP215 Grains Production NC !I' 423 53 19,222.00 944.00 8,480.00 12,250.00 500.00 28,646.00 29,146.00 32,416.00
Fishery
Agriculture:
Forestry. and 22 AFFHTC306 Horticulture NC III 445 56 16,659.00 300.00 8,960.00 12,250.00 500.00 25,919.00 26.419.00 29,209.00
Fishery
Agriculture,
Landscape Installation and
Forestry. and 23 AFFLIM208 212 27 21,590.00 500.00 4,320.00 9.450.00 500.00 26,410.00 26,910.00 31,540 00
Maintenance (So anon ) NC II
Fishery
Agriculture,
Forestry. and 24 AFFMLO217 Milking Operation NC II 160 20 5,134.05 1,387.00 3,200.00 7,000.00 500.00 9,721.05 10.221.05 13, 521.05
Fishery
Agriculture,
Forestry, and 25 AFFOAP212 Organic Agriculture Production NC II 232 29 23,391.00 979.00 4.640.00 10.150.00 500.00 29,010.00 29,510.00 34,520 00
Fishery
Agriculture,
Organic Agriculture Production NC II
Forestry. and 26 AFFOAP212 178 23 13,355.00 979.00 3,680.00 8,050.00 500.00 18,014.00 18,514.00 22,384.00
(Without Electives)
Fishery
Agriculture,
Forestry, and 27 AFFPMV207 Pest Management (Vegetables) NC II 312 39 13,746.00 500.00 6,240.00 12,250.00 500.00 20,486.00 20,986.00 26,496.00
Fishery
Agriculture.
Forestry. and 28 AFFRM0207 Rice Machinery Operations NCl/ 232 29 22,339.00 1,323.00 4,640.00 10,150.00 500.00 28,302.00 28,802.00 33,812.00
Fishery
Agriculture,
Forestry, and 29 AFFRPT212 Rubber Processing NC 11 162 21 19,797.00 500.00 3,360.00 7,350.00 500.00 23,657.00 24,157.00 27,647.00
Fishery
Agriculture,
Forestry. and 30 AFFRPT221 Rubber Production NC 11 (Superseded)° 322 41 10,000.00 500.00 6,560.00 12,250.00 500.00 17,060.00 17,560.00 22,750.00
Fishery
Agriculture,
Forestry, and 31 AFFRPT221 Rubber Production NC I! 321 41 10,000.00 500.00 6,560.00 12,250.00 500.00 17,060.00 17,560.00 22,750.00
Fishery
Agriculture.
Forestry. and 32 AFFSWP215 Seaweed Production NC 11 652 82 11,476.61 1,035.00 13,120.00 12,250.00 500.00 25,631.61 26,131.61 24,761.61
Fishery
Automotive and
Automotive Body Painting/Finishing NC
Land 33 ALTABP106 1 120 15 5,000.00 400.00 2,400.00 5.250.00 500.00 7.800.00 8,300.00 10,650.00
Transportation
Automotive and
Automotive Body Painting/Finishing NC 8,050.00
Land 34 ALTABP306 183 23 7,000.00 400.00 3,680.00 500.00 11,080.00 11,580.00 15.450.00
/I/
Transportation
Automotive and
Land 35 ALTABR220 Automotive Body Repairing NC II 895 112 5,000.00 1,036.00 17,920.00 12,250.00 500.00 23,956.00 24,456.00 18,286.00
Transportation
Automotive and
Land 36 ALTAEA207 Automotive Electrical Assembly NC 11 143 18 6,607.00 500.00 2,880.00 6,300.00 500.00 9,987.00 10,487.00 13,407.00
Transportation
Automotive and
Land 37 ALTAEA308 Automotive Electrical Assembly NC III 240 30 7,000.00 500.00 4,800.00 10.500.00 500.00 12,300.00 12,800.00 18,000.00
Transportation
Automotive and
Land 38 ALTAMA207 Automotive Mechanical Assembly NC II 143 18 5,000.00 500.00 2,880.00 6,300.00 500.00 8,380.00 8.880.00 11,800.00
Transportation
Automotive and
Land 39 ALTAMA308 Automotive Mechanical Assembly NC III 480 60 7.000.00 500.00 9.600.00 12,250.00 500.00 17,100.00 17,600.00 19.750.00
Transportation
Automotive and
Land 40 ALTATS118 Automotive Servicing NC I 469 59 14,674.00 1.141.00 9,440.00 12,250.00 500.00 25,255.00 25,755.00 28.065.00
Transportation
Automotive and
Land 41 ALTATS313 Automotive Servicing NC III 596 75 20,448.00 300.00 12,000.00 12,250.00 500.00 32,748.00 33,248.00 32,998.00
Transportation
TESDA CIRCULAR Page 3 of 30 pages
Subject: Schedule of Costs of TESDA Scholarship Programs
Numberoll, series of 2023
Date Issued: Effectivity: Supersedes:
TESDA Circular No. 051, series of 2022
TESDA Circular No. 032, series of 2022
TESDA Circular No. 094, series of 2021
16 January 2023 Immediately TESDA Circular No. 13, 13-A, 13-B, 13-C, series of 2021
TESDA Circular No. 006-A. series of 2021
TESDA Circular No. 065-A, series of 2020
To meet the objectives of Training for Work Scholarship Program (TWSP), Private Education Student Financial Assistance (PESFA), Special Training Employment Program (STEP), Tulong Trabaho Scholarship
Program (TTSP), Rice Extension Service Program (RESP), Coconut Farmers Scholarship Program (CFSP), Barangay Kabuhayan Skills Training Program (BKSTP), and Tsuper lskolar, the following schedule
of costs per qualification are hereby adopted. The following training costs relative to the implementation of TESDA Scholarship Programs are based on the following cost factors: Variable Costs (consumables,
utilities, facilties, equipment and tools maintenance; honoraria of trainers; and living allowance); and Fixed Costs (miscellaneous fees, national assessment fees, instructional materials, and other allowances.).
Training duration of scholarship programs with entrepreneurship are inclusive of 3-day entrepreneurship training. Further, implementation of supervised industry learning (SIL) is not covered under the
scholarship program.
Allowance (Phi))
Per Capita Cost (Php)
Training Support Fund (TSF)
No. of No. of National Book
Qualification Training TWSP, BKSTP, Tsuper lskolar
Sector No. TVET Qualification Title Training Training Assessment Allowance
Code Cost (PhP) and PESFA (PhP 350.001day for * TWSP and Tsuper
Hours Days Fee (PhP) For PESFA PESFA
(PhP160.001day maximum of 35 BKSTP Iskolar
only
8 hours) days 8 Hours)
Construction 58 Construction Site Supervision Level IV 192 24 15,000.00 3.840.00 8,400.00 500.00 18.840.00 19,340.00 23,400.00
To meet the objectives of Training for Work Scholarship Program (TWSP), Private Education Student Financial Assistance (PESFA). Special Training Employment Program (STEP), Tulong Trabaho Scholarship
Program (TTSP), Rice Extension Service Program (RESP), Coconut Farmers Scholarship Program (CFSP), Barangay Kabuhayan Skills Training Program (BKSTP), and Tsuper Iskolar, the following schedule
of costs per qualification are hereby adopted. The following training costs relative to the implementation of TESDA Scholarship Programs are based on the following cost factors: Variable Costs (consumables,
utilities, facilties, equipment and tools maintenance; honoraria of trainers; and living allowance); and Fixed Costs (miscellaneous fees, national assessment fees, instructional materials, and other allowances.).
Training duration of scholarship programs with entrepreneurship are inclusive of 3-day entrepreneurship training. Further, implementation of supervised industry learning (SIL) is not covered under the
scholarship program.
Allowance (Php)
Per Capita Cost (Php)
Training Support Fund (TSF)
No. of No. of National Book
Qualification .. Training TWSP, BKSTP, Tsuper Iskolar
Sector No. TVET Qualification Title Trainin Training Assessment Allowance
Code g Cost (PhP) and PESFA (PhP 350.001day for TWSP and Tsuper
Hours Days Fee (PhP) *For PESFA PESFA
(PhP160.001day maximum of 35only BKSTP Iskolar
8 hours) days 8 Hours)
To meet the objectives of Training for Work Scholarship Program (TWSP), Private Education Student Financial Assistance (PESFA), Special Training Employment Program (STEP), Tulong Trabaho Scholarship
Program (TTSP), Rice Extension Service Program (RESP), Coconut Farmers Scholarship Program (CFSP), Barangay Kabuhayan Skills Training Program (BKSTP), and Tsuper Iskolar, the following schedule
of costs per qualification are hereby adopted. The following training costs relative to the implementation of TESDA Scholarship Programs are based on the following cost factors: Variable Costs (consumables,
utilities, facilties, equipment and tools maintenance; honoraria of trainers; and living allowance); and Fixed Costs (miscellaneous fees, national assessment fees, instructional materials, and other allowances.).
Training duration of scholarship programs with entrepreneurship are inclusive of 3-day entrepreneurship training. Further, implementation of supervised industry learning (SIL) is not covered under the
scholarship program.
Allowance (Php)
Training Support Fund (TSF) Per Capita Cost (Php)
No. of No. of National Book
Qualification Training TWSP, BKSTP, Tsuper Iskolar
Sector No. TVET Qualification Title Training Training Assessment Allowance
Code Cost (PhP) and PESFA (PhP 350.00Iday for *For PESFA TWSP and Tsuper
Hours Days Fee (PhP) PESFA
(PhP160.001day maximum of 35only BKSTP Iskolar
8 hours) days 8 Hours)
1=61(8 hrs
a b c d e g h i j k Irg+h+i nr-g+h+i+k n=g+h+j
per day)
Construction 102 CONRGG107 Rigging NCI 116 15 15,000.00 2,144.00 2,400.00 5,250.00 500.00 19,544.00 20,044.00 22.394.00
Scaffolding Works NC II (Supported
Construction 103 CONSCA218 181 23 6,520.00 1,276.00 3.680.00 8,050.00 500.00 11,476.00 11,976.00 15.846.00
Type Scaffold)
Construction 104 CONSSW208 Structural Erection NC 11 162 21 6,500.00 500.00 3,360.00 7,350.00 500.00 10,360.00 10,860.00 14,350.00
Construction 105 CONTEC210 Technical Drafting NC 11 206 26 10,194.00 500.00 4,160.00 9,100.00 500.00 14,854.00 15,354.00 19,794.00
Construction 106 CONTIL218 Tile Setting NC II 117 15 10,605.00 1.415,00 2.400.00 5,250.00 500.00 14,420,00 14,920.00 17.270.00
Electrical and
107 ELCCSS213 Computer Systems Servicing NC II 280 35 37,190.00 1,049.00 5,600.00 12,250.00 500.00 43,839.00 44,339.00 50,489.00
Electronics
Electrical and
108 ELCCES306 Consumer Electronics Servicing NC III 176 22 6,000.00 400.00 3,520.00 7,700.00 500.00 9,920.00 10,420.00 14,100.00
Electronics
Electrical and
109 ELCCES406 Consumer Electronics Servicing NC IV 176 22 6,000.00 400.00 3,520.00 7,700.00 500.00 9,920.00 10,420.00 14,100.00
Electronics
Electrical and Electrical Installation and Maintenance
110 ELCEIM215 196 25 6,215.00 1,849.00 4,000.00 8,750.00 500.00 12,064.00 12.564.00 16.814.00
Electronics NC II
Electrical and Electrical Installation and Maintenance
111 ELCEIM315 160 20 6,000.00 1,896.00 3,200.00 7,000.00 500.00 11,096.00 11.596.00 14,896.00
Electronics NC 111
Electrical and Electrical Installation and Maintenance
112 ELCEIM408 516 65 9.000.00 500.00 10,400.00 12,250.00 500.00 19,900.00 20,400.00 21.750.00
Electronics NC IV
Electrical and Electronics Production Line Back End
113 72 9 5,800.00 - 1,440.00 3.150.00 500.00 7,240.00 7,740.00 8,950.00
Electronics Operation Level 1
Electrical and Electronics Production Line - SMT
114 80 10 5,800.00 - 1,600.00 3,500.00 500.00 7,400.00 7,900.00 9,300.00
Electronics Operation Level1
Electrical and Electronic Products Assembly and
115 ELCEPA213 260 33 9,747.00 1,089.00 5,280.00 11,550.00 500.00 16,116.00 16,616.00 22,386.00
Electronics Servicing NC 11
Electrical and Instrumentation and Control Servicing
116 ELCICS206 238 30 10,000.00 400.00 4,800.00 10,500.00 500.00 15,200.00 15,700.00 20.900.00
Electronics NC it
Electrical and Instrumentation and Control Servicing
117 ELCICS306 176 22 13,423.00 500.00 3,520.00 7,700.00 500.00 17,443.00 17,943.00 21,623.00
Electronics NC Ill
Electrical and Instrumentation and Control Servicing
118 ELCICS406 170 22 13,070.00 500.00 3,520.00 7,700.00 500.00 17,090.00 17,590.00 21,270.00
Electronics NC IV
Electrical and
119 ELCMEC215 Mechatronics Servicing NC II 158 20 14,854.00 1,301.00 3,200.00 7,000.00 500.00 19,355.00 19,855.00 23,155.00
Electronics
Electrical and
120 ELCMEC315 Mechatronics Servicing NC III 196 25 13,345.00 1,504.00 4.000.00 8,750.00 500.00 18,849.00 19,349.00 23,599.00
Electronics
Electrical and
121 ELCMEC415 Mechatronics Servicing NC IV 200 25 13,610.00 2,141.00 4,000.00 8,750.00 500.00 19.751.00 20.251.00 24,501.00
Electronics
Electrical and Semiconductor Back-End Operation NC
122 ELCSB0215 80 10 4,839.38 852.00 1,600.00 3,500.00 500.00 7,291.38 7,791.38 9.191.38
Electronics II
Electrical and Semiconductor Front-of-Line Operation
123 ELCSF0215 80 10 4,839.38 877.00 1,600.00 3,500.00 500.00 7,316.38 7,816.38 9,216.38
Electronics NC 11
Furniture and
124 FURFIN207 Furniture Making (Finishing) NC II 212 27 11,390.00 500.00 4,320.00 9.450.00 500.00 16,210.00 16,710.00 21.34.0.00
Fixtures
Garments and
125 GRMDRM205 Dressmaking NC II 275 35 6,295.00 1,348.00 5,600.00 12,250.00 500.00 13,243.00 13,743.00 19,893.00
Textiles
Garments and
126 GRMFAD311 Fashion Design (Apparefl NC III 397 50 16,252.19 500.00 8,000.00 12,250.00 500.00 24.752.19 25,252.19 29,002.19
Textiles
Garments and
127 GRMTLR205 Tailoring NC 11 275 35 14,071.00 1,684.00 5,600.00 12,250.00 500.00 21,355.00 21,855.00 28.005.00
Textiles
Heating,
Ventlalim,
128 HVCADS206 Air Duct Servicing NC II 596 75 10,000.00 300.00 12,000.00 12,250.00 500.00 22,300.00 22,800.00 22,550.00
Airconditioning
and Refrigeration
Heating.
Ventilation,
129 HVCIPR306 Ice Plant Refrigeration Servicing NC III 672 84 10,000,00 400.00 13,440.00 12,250.00 500.00 23,840.00 24,340.00 22,650.00
Airconditioning
and Refrigeration
Heating,
Ventilation RAC Servicing (DomRAC) NC II
' 130 HVCWAC211 480 60 14,272.00 500.00 9,600.00 12,250.00 500.00 24,372.00 24,872.00 27,022.00
Airconditioning (Superseded)'
and Refrigeration
TESDA CIRCULAR Page 6 of 30 pages
Subject: Schedule of Costs of TESDA Scholarship Programs
Number 00',, series of 2023
Date Issued: Effectivity: Supersedes:
TESDA Circular No. 051 series of 2022
TESDA Circular No. 032 series of 2022
TESDA Circular No. 094, series of 2021
16 January 2023 Immediately TESDA Circular No. 13, 13-A, 13-B, 13-C, series of 2021
TESDA Circular No. 006-A, series of 2021
TESDA Circular No. 065-A, series of 2020
To meet the objectives of Training for Work Scholarship Program (TWSP), Private Education Student Financial Assistance (PESFA). Special Training Employment Program (STEP), Tulong Trabaho Scholarship
Program (TTSP), Rice Extension Service Program (RESP), Coconut Farmers Scholarship Program (CFSP), Barangay Kabuhayan Skills Training Program (BKSTP), and Tsuper Iskolar, the following schedule
of costs per qualification are hereby adopted. The following training costs relative to the implementation of TESDA Scholarship Programs are based on the following cost factors: Variable Costs (consumables,
utilities, facilties, equipment and tools maintenance; honoraria of trainers; and living allowance); and Fixed Costs (miscellaneous fees, national assessment fees, instructional materials, and other allowances ).
Training duration of scholarship programs with entrepreneurship are inclusive of 3-day entrepreneurship training. Further, implementation of supervised industry learning (SIL) is not covered under the
scholarship program.
Allowance (Php)
Per Capita Cost (Php)
Training Support Fund (TSF)
No. of No. of National Book
Qualification Training TWSP, BKSTP, Tsuper Iskolar
Sector No. NET Qualification Title Training Training Assessment Allowance
Code Cost (PhP) and PESFA (PhP 350.00Iday for * TWSP and Tsuper
Hours Days Fee (PhP) For PESFA PESFA
(PhP160.00Iday maximum of 35 only BKSTP Iskolar
8 hours) days 8 Hours)
Heating,
Ventilation RAC Servicing (PACU-CRE) NC III
' 131 HVCPCR312 226 29 17,926.00 500.00 4,640.00 10,150.00 500.00 23,066.00 23,566.00 28,576.00
Airconditioning (Superseded,)
and Refrigeration
Human Health /
132 HHCBHS219 Barangay Health Services NC II 463 58 16,276.00 935.00 9,280.00 12,250.00 500.00 26,491.00 26,991.00 29,461.00
Health Care
Human Health / Barangay Infectious Disease
133 88 11 4,914.00 - 1,760.00 3,850.00 500.00 6,674.00 7,174.00 8.764.00
Health Care Management Services Level II
Human Health I
134 HHCBES206 Biomedical Equipment Services NC II 960 120 10,000.00 350.00 19,200.00 12,250.00 500.00 29,550.00 30.050.00 22,600.00
Health Care
Human Health /
135 HHCCGV207 Caregiving NC II (Superseded)' 786 99 23,687.00 350.00 15,840.00 12,250.00 500.00 39,877.00 40,377.00 36,287.00
Health Care
Human Health / Caregiving (Clients with Special Needs)
136 HHCCGC220 653 82 20,950.00 1,481.00 13,120.00 12,250.00 500.00 35,551.00 36,051.00 34,681.00
Health Care NC II
Human Health /
137 HHCCGE220 Caregiving (Eberly) NC II 401 51 19,895.00 1,620.00 8,160.00 12,250.00 500.00 29,675.00 30,175.00 33,765.00
Health Care
Human Health / Caregiving (Grade Schooley to
138 HHCCGG220 389 49 9,502.00 1,268.00 7,840.00 12,250.00 500.00 18,610.00 19,110.00 23,020.00
Health Care Adolescent) NC H
Human Health / Caregiving (Newborn to Pie Schooley)
139 HHCCGN220 465 59 31,117.00 1,358.00 9,440.00 12,250.00 500.00 41,915.00 42,415.00 44,725.00
Health Care NC II
Human Health / Dental Laboratory Technology Services
140 HHCDSF210 808 101 10,000.00 500.00 16,160.00 12,250.00 500.00 26,660.00 27,160.00 22,750.00
Health Care (Fixed Dentures/Restorations) NC II
Maritime 175 MTMSCC314 Ships' Catering (Ships' Cooks) NC III 160 20 10,172.00 1,300.00 3,200.00 7,000.00 500.00 14,672.00 15.172.00 18,472.00
Metals and
176 MEECC0309 CAD/CAM Operation NC ill 234 30 13,938.00 500.00 4,800.00 10,500.00 500.00 19,238.00 19.738.00 24.938.00
Engineering
Metals and
177 MEECL0209 CNC Lathe Machine Operation NC II 236 30 26,497.00 500.00 4,800.00 10,500.00 500.00 31,797.00 32,297.00 37497.00
Engineering
Metals and
178 MEECL0309 CNC Lathe Machine Operation NC III 234 30 32,886.00 500.00 4,800.00 10,500.00 500.00 38,186.00 38,686.00 43,886.00
Engineering
Metals and
179 MEECM0209 CNC Milling Machine Operation NC 11 236 30 27,862.00 500.00 4,800.00 10,500.00 500.00 33,162.00 33.662,00 38,862.00
Engineering
Metals and
180 MEECM0309 CNC Milling Machine Operation NC III 234 30 29,060.00 500.00 4,800.00 10,500.00 500.00 34,360.00 34,860.00 40,060.00
Engineenng
Metals and
181 MEEFCW106 Flux Cored Arc Welding (FCAW) NCI 156 20 10,000.00 500.00 3,200.00 7,000.00 500.00 13,700.00 14,200.00 17,500.00
Engineering
Metals and
182 MEEFCW206 Flux Cored Arc Welding (FCAW) NC // 268 34 10,000.00 3,353.00 5,440.00 11,900.00 500.00 18,793.00 19,293.00 25,253.00
Engineering
TESDA CIRCULAR Page 8 of 30 pages
Subject: Schedule of Costs of TESDA Scholarship Programs
Number M series of 2023
Date Issued: Effectivity: Atp
ipersedes:
TESDA Circular No. 051, series of 2022
TESDA Circular No. 032, series of 2022
TESDA Circular No. 094, series of 2021
16 January 2023 Immediately TESDA Circular No. 13, 13-A, 13-B, 13-C, series of 2021
TESDA Circular No. 006-A, series of 2021
TESDA Circular No. 065-A, series of 2020
To meet the objectives of Training for Work Scholarship Program (TWSP); Private Education Student Financial Assistance (PESFA); Special Training Employment Program (STEP), Tulong Trabaho Scholarship
Program (TTSP), Rice Extension Service Program (RESP), Coconut Farmers Scholarship Program (CFSP), Barangay Kabuhayan Skills Training Program (BKSTP), and Tsuper Iskolar, the following schedule
of costs per qualification are hereby adopted. The following training costs relative to the implementation of TESDA Scholarship Programs are based on the following cost factors: Variable Costs (consumables,
utilities, facilties, equipment and tools maintenance; honoraria of trainers; and living allowance); and Fixed Costs (miscellaneous fees, national assessment fees, instructional materials, and other allowances.).
Training duration of scholarship programs with entrepreneurship are inclusive of 3-day entrepreneurship training. Further, implementation of supervised industry learning (SIL) is not covered under the
scholarship program.
Allowance (Php)
Training Support Fund (TSF) Per Capita Cost (Php)
No. of No. of National Book
Qualification Training TWSP, BKSTP, Tsuper Iskolar
Sector No. TVET Qualification Title Training Training Assessment Allowance
Code Cost (PhP) and PESFA (PhP 350.00Iday for TWSP and Tsuper
Hours Days Fee (PhP) *For PESFA PESFA
(PhP160.00Iday maximum of 35 only BKSTP Iskolar
8 hours) days 8 Hours)
fre/(8 his
a b c d e g h , k i=g+h+i m=g+h+i+k n=g+h+j
per day)
Metals and
183 MEEFCVV306 Flux Cored Arc Welding (FCAW) NC Ill 148 19 15,000.00 500.00 3.040.00 6,650.00 500.00 18,540.00 19,040.00 22,150.00
Engineering
Metals and
184 MEEMIG106 Gas Metal Arc Welding (GMAW) NC 1 268 34 14,110.00 500.00 5,440.00 11.900.00 500.00 20,050.00 20,550.00 26,510.00
Engineering
Metals and
185 MEEMIG206 Gas Metal Arc Welding (GMAW) NC II 268 34 26,688.00 3,361.00 5,440.00 11,900.00 500.00 35,489.00 35,989.00 41,949.00
Engineering
Metals and
186 MEEMIG306 Gas Metal Arc Welding (GMAW) NC III 148 19 15,000.00 500.00 3,040.00 6,650.00 500.00 18,540.00 19.040.00 22,150.00
Engineering
Metals and Gas Tungsten Arc Welding (GTAW) NC
187 MEETIG206 268 34 22,872.00 2,126.00 5,440.00 11,900.00 500.00 30,438.00 30,938.00 36,898.00
Engineering /!
Metals and Gas Tungsten Arc Welding (GTAW) NC
188 MEETIG466 294 37 10,000.00 500.00 5,920.00 12,250.00 500.00 16420.00 16,920.00 22,750.00
Engineering IV
Metals and
189 MEEGSW106 Gas Welding NCI 156 20 10,385.00 500.00 3,200.00 7,000.00 500.00 14,085.00 14,585.00 17.885.00
Engineering
Metals and
190 MEEGSW206 Gas Welding NC II 312 39 12,227.00 600.00 6.240.00 12,250.00 500.00 19,067.00 19,567.00 25,077.00
Engineering
Metals and
191 MEEMCG119 Machining NCI 1,590 199 7,000.00 2,252.00 31,840.00 12,250.00 500.00 41,092.00 41.592.00 21.502.00
Engineering
Metals and
192 MEEMCG106 Machining NCI (Superseded)' 374 47 7,000.00 500.00 7,520.00 12,250.00 500.00 15,020.00 15,520.00 19,750.00
Engineering
Metals and
193 MEEMCG205 Machining NC 11 337 43 15,770.00 600.00 6,880.00 12.250.00 500.00 23,250.00 23.750.00 28,620.00
Engineering
Metals and
194 MEEMCG306 Machining NC III 342 43 18,137.00 500.00 6,880.00 12,250.00 500.00 25.517.00 26.017.00 30.8.87.00
Engineering
Metals and
195 MEEDFT108 Mechanical Drafting NC I 218 28 3,500.00 500.00 4,480.00 9,800.00 500.00 8.480.00 8,980.00 13,800.00
Engineering
Metals and
196 MEEPMM108 Plant Maintenance NC I 358 45 7,000.00 500.00 7,200.00 12,250.00 500.00 14,700.00 15,200.00 19,750.00
Engineering
Metals and
197 MEEPM0108 Press Machine Operation NC I 294 37 7,000.00 500.00 5,920.00 12,250.00 500.00 13,420.00 13,920.00 19,750 00
Engineering
Metals and Shielded Metal Arc Welding (SMAW)
198 MEEEAVV106 268 34 14,594.00 2,234.00 5,440.00 11,900.00 500.00 22,268.00 22,768.00 28,728.00
Engineering NC I
Metals and Shielded Metal Arc Welding (SMAVV)
199 MEEEAVV206 268 34 15,460.00 2,697.00 5,440.00 11,900.00 500.00 23,597.00 24,097.00 30.057.00
Engineering NC /I
Metals and Shielded Metal Arc Welding (SMAW)
200 MEEEAVV306 120 15 17.665.00 3,723.00 2,400.00 5,250.00 500.00 23.788.00 24,288.00 26,638.00
Engineering NC 111
Metals and Shielded Metal Arc Welding (SMAW)
201 MEEEAW406 168 21 36,212.00 5,129.00 3,360.00 7,350.00 500.00 44.701.00 45,201.00 48,691.00
Engineering NC IV
Metals and
202 MEESAW106 Submerged Arc Welding (SAW) NC / 124 16 10,000.00 500.00 2,560.00 5,600.00 500.00 13,060.00 13,560.00 16,100.00
Engineering
Metals and
203 MEESAW206 Submerged Arc Welding (SAM) NC 11 194 25 10,000.00 600.00 4.000.00 8150.00 500.00 14,600.00 15.100.00 19,350.00
Engineering
Metals and
204 MEETDM208 Tool and Die Making NC II 598 75 9,000.00 500.00 12,000.00 12,250.00 500.00 21,500.00 22,000 00 21,750.00
Engineering
Processed Food
205 PFBFPP207 Fish Products Packaging NC II 152 19 5,000.00 500.00 3,040.00 6,650.00 500.00 8.540.00 9,040.00 12.150.00
and Beverages
Processed Food
206 PFBFOP119 Food Processing NC I 197 25 5.719.00 1,506.00 4,000.00 8.750.00 500.00 11.225.00 11,725.00 15,975.00
and Beverages
Processed Food
207 PFBFOP215 Food Processing NC II 552 69 22,252.00 500.00 11,040.00 12,250.00 500.00 33,792.00 34,292.00 35.002.00
and Beverages
Processed Food
208 PFBFOP307 Food Processing NC III 900 113 34,090.00 500.00 18,080.00 12,250.00 500.00 52,670.00 53,170.00 46.840 00
and Beverages
Processed Food
209 PFBFOP407 Food Processing NC IV 576 72 21,810.00 500.00 11,520.00 12,250.00 500.00 33,830.00 34,330.00 34.56000
and Beverages
Processed Food Slaughtering Operations (Large Animal)
210 PFBSLL216 360 45 20,000.00 946.00 7,200.00 12,250.00 500.00 28,146.00 28,646.00 33,196.00
and Beverages NC 11
Processed Food
211 PFBSLS216 Slaughtering Operations (Swine) NC II 280 35 20,000.00 949.00 5,600.00 12,250.00 500.00 26,549.00 27,049.00 33.199.00
and Beverages
Social,
Community
212 SOCBRB220 Barbering NC II 285 36 11,217.00 938.00 5,760.00 12,250.00 500.00 17,915.00 18,415.00 24,405.00
Development and
Other Services
TESDA CIRCULAR Page 9 of 30 pages
Subject: Schedule of Costs of TESDA Scholarship Programs
Number coat series of 2023
Date Issued: Effectivity: Supersedes:
TESDA Circular No. 051 series of 2022
TESDA Circular No. 032. series of 2022
TESDA Circular No. 094. series of 2021
16 January 2023 Immediately TESDA Circular No. 13, 13-A. 13-B, 13-C, series of 2021
TESDA Circular No. 006-A, series of 2021
TESDA Circular No. 065-A, series of 2020
To meet the objectives of Training for Work Scholarship Program (TWSP), Private Education Student Financial Assistance (PESFA), Special Training Employment Program (STEP), Tulong Trabaho Scholarship
Program (TTSP), Rice Extension Service Program (RESP), Coconut Farmers Scholarship Program (CFSP), Barangay Kabuhayan Skills Training Program (BKSTP), and Tsuper Iskolar, the following schedule
of costs per qualification are hereby adopted. The following training costs relative to the implementation of TESDA Scholarship Programs are based on the following cost factors: Variable Costs (consumables,
utilities, facilties, equipment and tools maintenance, honoraria of trainers; and living allowance); and Fixed Costs (miscellaneous fees, national assessment fees, instructional materials, and other allowances ).
Training duration of scholarship programs with entrepreneurship are inclusive of 3-day entrepreneurship training. Further, implementation of supervised industry learning (SIL) is not covered under the
scholarship program.
Allowance (PhP)
Per Capita Cost (Php)
Training Support Fund (TSF)
No. of No. of National Book
Qualification Training TWSP, BKSTP, Tsuper Iskolar
Sector No. TVET Qualification Title Training Training Assessment Allowance
Code Cost (PhP) and PESFA (PhP 350.00/day for TWSP and Tsuper
Hours Days Fee (PhP) .For PESFA PESFA
(Ph13160.00Iday maximum of 35 BKSTP Iskolar
only
8 hours) days 8 Hours)
fre/ (8 hrs
a b c d e h I , k I=g+h+i rnr-g+h+i+k n=g+h+)
per day) g
Social,
Community
213 SOCBCN220 Beauty Care (Nail Care) Services NC ll 341 43 21,880.00 876.00 6,880.00 12,250.00 500.00 29,636.00 30,136.00 35,006.00
Development and
Other Services
Social.
Community
214 SOCBEC219 Beauty Care (Skin Care) Services NC II 277 35 7.743.00 1,410.00 5,600.00 12,250.00 500.00 14,753.00 15,253.00 21,403.00
Development and
Other Services
Social,
Community
215 SOCBKP307 Bookkeeping NC II/ 292 37 9,195.00 841.00 5,920.00 12,250.00 500.00 15,956.00 16,456.00 22,286.00
Development and
Other Services
Social,
Community
216 HHHCCT221 Contact Tracing NC II 120 15 5,000.00 2,400.00 5,250.00 500.00 7,400.00 7,900.00 10,250.00
Development and
Other Services
Social,
Community Cooperative Development and
217 885 111 13,032.88 17,760.00 12,250.00 500.00 30,792.88 31,292.88 25,282.88
Development and Management Level IV
Other Services
Social.
Community
218 SOCHDR320 Hairdressing NC Ill 244 31 24,280.00 1.019.00 4,960.00 10.850.00 500.00 30,259.00 30,759.00 36,149.00
Development and
Other Services
Social.
Community
219 SOCLGS215 Lifeguard Services NC II 980 123 11,232.36 1,029.00 19,680.00 12,250.00 500.00 31,941.36 32,441.36 24,511.36
Development and
Other Services
Social.
Community
220 SOCLGS315 Lifeguard Services NC III 1,520 190 20,341.53 1,058.00 30,400.00 12,250.00 500.00 51,799.53 52,299.53 33.649.53
Development and
Other Services
Social,
Community
221 SOCMIC210 Microfinance Technology NC II 403 51 9,910.00 500.00 8,160.00 12,250.00 500.00 18,570.00 19,070.00 22,660.00
Development and
Other Services
Human Health /
222 HHCOLS207 Ophthalmic Lens Services NC II 254 32 8.000.00 500.00 5,120.00 11,200.00 500.00 13,620.00 14,120.00 19,700.00
Health Care
Social.
Community
223 SOCSES105 Security Services NCI 170 22 6,314.00 200.00 3,520.00 7,700.00 500.00 10,034.00 10,534.00 14.214 00
Development and
Other Services
Social,
Community
224 SOCSES207 Security Services NC II 223 28 5,000.00 200.00 4,480.00 9,800.00 500.00 9,680.00 10,180.00 15.000.00
Development and
Other Services
Tourism (Hotel
225 TRSBRT213 Barista NC II 178 23 6,454.00 1,295.00 3,680.00 8,050.00 500.00 11,429.00 11,929.00 15,799.00
and Restaurant)
Tourism (Hotel
226 TRSBAR213 Bartending NC II 438 55 13,336.00 1,399.00 8,800.00 12,250.00 500.00 23,535.00 24,035.00 26,985.00
and Restaurant)
Tourism (Hotel
227 TRSBAR213 Bartending NC II (Without Electives) 326 41 10,153.00 1,399.00 6,560.00 12,250.00 500.00 18,112.00 18,612.00 23,802.00
and Restaurant)
Tourism (Hotel
228 TRSBPP209 Bread and Pastry Production NC II 141 18 16,968.00 400.00 2,880.00 6,300.00 500.00 20,248.00 20,748.00 23,668.00
and Restaurant)
Tourism (Hotel
229 TRSCOK214 Cookery NC II 316 40 20,315.00 1,300.00 6,400.00 12,250.00 500.00 28.015.00 28,515.00 33.865.00
and Restaurant)
Tourism (Hotel
230 TRSEVM307 Events Management Services NC III 108 14 14,776.00 905.00 2,240.00 4.900.00 500.00 17,921.00 18,421.00 20.581.00
and Restaurant)
Tourism (Hotel
231 TRSFBS213 Food and Beverage Services NC ii 356 45 15,710.00 882.00 7,200.00 12.250.00 500.00 23,792.00 24,292.00 28,842.00
and Restaurant)
TESDA CIRCULAR Page 10 of 30 pages
Subject: Schedule of Costs of TESDA Scholarship Programs
Number 004, series of 2023
Date Issued: Effectivity: Supersedes:
TESDA Circular No. 051, series of 2022
TESDA Circular No. 032, series of 2022
TESDA Circular No. 094, series of 2021
16 January 2023 Immediately TESDA Circular No. 13, 13-A, 13-B, 13-C, series of 2021
TESDA Circular No. 006-A, series of 2021
TESDA Circular No. 065-A, series of 2020
To meet the objectives of Training for Work Scholarship Program (TWSP), Private Education Student Financial Assistance (PESFA), Special Training Employment Program (STEP), Tulong Trabaho Scholarship
Program (TTSP), Rice Extension Service Program (RESP), Coconut Farmers Scholarship Program (CFSP), Barangay Kabuhayan Skills Training Program (BKSTP), and Tsuper Iskolar, the following schedule
of costs per qualification are hereby adopted. The following training costs relative to the implementation of TESDA Scholarship Programs are based on the following cost factors: Variable Costs (consumables,
utilities, facilties, equipment and tools maintenance; honoraria of trainers; and living allowance), and Fixed Costs (miscellaneous fees, national assessment fees, instructional materials, and other allowances )
Training duration of scholarship programs with entrepreneurship are inclusive of 3-day entrepreneurship training. Further, implementation of supervised industry learning (SIL) is not covered under the
scholarship program.
Allowance (Php)
Training Support Fund (TSF) Per Capita Cost (Php)
No. of No. of National Book
Qualification Training TWSP, BKSTP, Tsuper Iskolar
Sector No. TVET Qualification Title Training Training Assessment Allowance
Code Cost (PhP) and PESFA (PhP 350.00/day for „ TWSP and Tsuper
Hours Days Fee (PhP) For PESFA PESFA
(PtiP160.00/day maximum of 35 BKSTP Iskolar
only
8 hours) days 8 Hours)
To meet the objectives of Training for Work Scholarship Program (TWSP), Private Education Student Financial Assistance (PESFA), Special Training Employment Program (STEP), Tulong
Trabaho Scholarship Program (TTSP), Rice Extension Service Program (RESP). Coconut Farmers Scholarship Program (CFSP), Barangay Kabuhayan Skills Training Program (BKSTP), and
Tsuper Iskolar, the following schedule of costs per qualification are hereby adopted. The following training costs relative to the implementation of TESDA Scholarship Programs are based on
the following cost factors: Variable Costs (consumables, utilities, facilties, equipment and tools maintenance; honoraria of trainers; and living allowance); and Fixed Costs (miscellaneous fees,
national assessment fees. instructional materials, and other allowances.). Training duration of scholarship programs with entrepreneurship are inclusive of 3-day entrepreneurship training.
Further, implementation of supervised industry learning (SIL) is not covered under the scholarship program.
To meet the objectives of Training for Work Scholarship Program (TWSP). Private Education Student Financial Assistance (PESFA), Special Training Employment Program (STEP), Tulong
Trabaho Scholarship Program (TTSP), Rice Extension Service Program (RESP), Coconut Farmers Scholarship Program (CFSP), Barangay Kabuhayan Skills Training Program (BKSTP), and
Tsuper Iskolar. the following schedule of costs per qualification are hereby adopted. The following training costs relative to the implementation of TESDA Scholarship Programs are based on
the following cost factors: Variable Costs (consumables, utilities, facilties, equipment and tools maintenance; honoraria of trainers: and living allowance); and Fixed Costs (miscellaneous fees,
national assessment fees, instructional materials, and other allowances.). Training duration of scholarship programs with entrepreneurship are inclusive of 3-day entrepreneurship training.
Further, implementation of supervised industry learning (SIL) is not covered under the scholarship program.
To meet the objectives of Training for Work Scholarship Program (TWSP), Private Education Student Financial Assistance (PESFA), Special Training Employment Program (STEP), Tulong
Trabaho Scholarship Program (TTSP), Rice Extension Service Program (RESP), Coconut Farmers Scholarship Program (CFSP), Barangay Kabuhayan Skills Training Program (BKSTP). and
Tsuper Iskolar, the following schedule of costs per qualification are hereby adopted. The following training costs relative to the implementation of TESDA Scholarship Programs are based on
the following cost factors: Variable Costs (consumables, utilities, facilties, equipment and tools maintenance; honoraria of trainers; and living allowance); and Fixed Costs (miscellaneous fees,
national assessment fees, instructional materials, and other allowances.). Training duration of scholarship programs with entrepreneurship are inclusive of 3-day entrepreneurship training.
Further, implementation of supervised industry learning (SIL) is not covered under the scholarship program.
To meet the objectives of Training for Work Scholarship Program (TWSP), Private Education Student Financial Assistance (PESFA), Special Training Employment Program (STEP), Tulong
Trabaho Scholarship Program (TTSP), Rice Extension Service Program (RESP). Coconut Farmers Scholarship Program (CFSP), Barangay Kabuhayan Skills Training Program (BKSTP), and
Tsuper Iskolar, the following schedule of costs per qualification are hereby adopted. The following training costs relative to the implementation of TESDA Scholarship Programs are based on
the following cost factors: Variable Costs (consumables, utilities, facilfies, equipment and tools maintenance; honoraria of trainers; and living allowance); and Fixed Costs (miscellaneous fees,
national assessment fees, instructional materials. and other allowances.). Training duration of scholarship programs with entrepreneurship are inclusive of 3-day entrepreneurship training.
Further, implementation of supervised industry learning (SIL) is not covered under the scholarship program.
To meet the objectives of Training for Work Scholarship Program (TWSP), Private Education Student Financial Assistance (PESFA), Special Training Employment Program (STEP), Tulong
Trabaho Scholarship Program (TTSP), Rice Extension Service Program (RESP), Coconut Farmers Scholarship Program (CFSP), Barangay Kabuhayan Skills Training Program (BKSTP), and
Tsuper lskolar, the following schedule of costs per qualification are hereby adopted. The following training costs relative to the implementation of TESDA Scholarship Programs are based on
the following cost factors: Variable Costs (consumables, utilities, facilties, equipment and tools maintenance; honoraria of trainers; and living allowance); and Fixed Costs (miscellaneous fees,
national assessment fees. instructional materials, and other allowances.). Training duration of scholarship programs with entrepreneurship are inclusive of 3-day entrepreneurship training.
Further. implementation of supervised industry learning (SIL) is not covered under the scholarship program.
Construction 119 CONHEM206 Heavy Equipment Servicing (Mechanical) NC 112 362 46 13,196.00 1,943.00 7,360.00 22,499.00
Heavy Equipment Operation (Articulated Off-
Construction 120 CONART207 122 16 15,000.00 760.00 2,560.00 18,320.00
Highway Dump Truck) NC 111
Heavy Equipment Operation (Articulated Off
121 CONART207 122 16 15,000.00 4,710.00 2,560.00 22,270.00
Highway Dump Truck) NC 112
Heavy Equipment Operation (Backhoe Loader)
Construction 122 CONBL0207 122 16 15,000.00 760.00 2,560.00 18,320.00
NC 111
Heavy Equipment Operation (Backhoe Loader)
Construction 123 CONBL0207 122 16 15,000.00 2,537,00 2,560.00 20,097.00
NCI!'
Construction 124 CONBUL207 Heavy Equipment Operation (Bulldozer) NC II' 156 20 15.000.00 760.00 3,200.00 18,960.00
Construction 125 CONBUL207 Heavy Equipment Operation (Bulldozer) NC 112 156 20 15,000.00 3,779.00 3,200.00 21,979.00
TESDA CIRCULAR
Page 16 of 30 pages
Subject: Schedule of Costs of TESDA Scholarship Programs
Number 004, series of 2023
Date Issued: Effectivity: Supersedes:
TESDA Circular No. 051, series of 2022
TESDA Circular No. 032, series of 2022
TESDA Circular No. 094, series of 2021
16 January 2023 Immediately TESDA Circular No. 13, 13-A, 13-B, 13-C, series of 2021
TESDA Circular No. 006-A, series of 2021
TESDA Circular No. 065-A, series of 2020
To meet the objectives of Training for Work Scholarship Program (TWSP), Private Education Student Financial Assistance (PESFA), Special Training Employment Program (STEP), Tulong
Trabaho Scholarship Program (TTSP), Rice Extension Service Program (RESP), Coconut Farmers Scholarship Program (CFSP), Barangay Kabuhayan Skills Training Program (BKSTP), and
Tsuper Iskolar, the following schedule of costs per qualification are hereby adopted. The following training costs relative to the implementation of TESDA Scholarship Programs are based on
the following cost factors: Variable Costs (consumables, utilities, facilties, equipment and tools maintenance; honoraria of trainers; and living allowance); and Fixed Costs (miscellaneous fees,
national assessment fees, instructional materials, and other allowances.). Training duration of scholarship programs with entrepreneurship are inclusive of 3-day entrepreneurship training.
Further, implementation of supervised industry learning (SIL) is not covered under the scholarship program.
Construction 133 CONMG0207 Heavy Equipment Operation (Motor Grader) NC 112 156 20 15,000.00 3,227.00 3,200.00 21,427.00
Construction 134 CONPAV207 Heavy Equipment Operation (Paver) NC IP 122 16 10,000.00 760.00 2,560.00 13,320.00
Construction 135 CONPAV207 Heavy Equipment Operation (Paver) NC 112 122 16 10,000.00 2,204.00 2,560.00 14,764.00
Heavy Equipment Operation (Rigid Off-Highway
Construction 136 CONRIG207 162 21 15,000.00 760.00 3,360.00 19,120.00
Dump Truck) NC 111
Heavy Equipment Operation (Rigid Off Highway
Construction 137 CONRIG207 162 21 15,000.00 6,645.00 3,360.00 25,005.00
Dump Truck) NC 112
Heavy Equipment Operation (Rigid On-Highway
Construction 138 CONROH2O7 122 16 10,000.00 500.00 2,560.00 13,060.00
Dump Truck) NC 11 (Superseded)5
Construction 139 CONRR0207 Heavy Equipment Operation (Road Roller) NC Ill 162 21 15,941.00 760.00 3,360.00 20,061.00
Construction 140 CONRR0207 Heavy Equipment Operation (Road Roller) NC IP 162 21 15,941.00 3,154.00 3,360.00 22,455.00
Construction 141 CONSCR107 Heavy Equipment Operation (Screed) NC l' 100 13 10,000.00 760.00 2,080.00 12,840.00
Construction 142 CONSCR107 Heavy Equipment Operation (Screed) NC I2 100 13 10,000.00 2,204.00 2,080.00 14,284.00
Construction 143 CONTM0207 Heavy Equipment Operation (Transit Mixer) NC 111 122 16 15,000.00 760.00 2,560.00 18,320.00
Construction 144 CONTM0207 Heavy Equipment Operation (Transit Mixer) NC 112 122 16 15,000.00 2,576.00 2,560.00 20,136.00
Heavy Equipment Operation (Wheel Loader) NC
Construction 145 CONWL0207 156 20 15,000.00 760.00 3.200.00 18,960.00
Heavy Equipment Operation (Wheel Loader) NC
Construction 146 CONWL0207 156 20 15,000.00 3,511.00 3,200.00 21,711.00
Ill
Construction 147 CONMAS118 Masonry NCI 123 16 8,174.00 1,153.00 2,560.00 11,887.00
Construction 148 CONMAS218 Masonry NC 11 181 23 10,585.00 1,535.00 3,680.00 15,800.00
Plaster Concrete / Masonry Surface (Leading to
Construction 149 136 17 2,500.00 500.00 2,720.00 5,720.00
Masonry NCI!)
Construction 150 CONMAS318 Masonry NC III 144 18 8,000.00 1,410,00 2,880.00 12,290.00
Construction 151 CONPIP218 Pipefitting (Metallic) NC II 221 28 11,610.00 1,427.00 4.480.00 17,517.00
Construction 152 CONPIP208 Pipefitting NC II (Superseded)5 202 26 10,660.00 500.00 4,160.00 15,320.00
Construction 153 CONPLM114 Plumbing NC I 168 21 19,629.00 1,609.00 3,360.00 24,598.00
Construction 154 CONPLM214 Plumbing NC II 202 26 13,576.00 1,888.00 4,160.00 19,624.00
Construction 155 CONPLM314 Plumbing NC III 248 31 19,982.00 2,051.00 4,960.00 26,993.00
Construction 156 CONPVD308 PV System Design NC III 148 19 7,000.00 500.00 3,040.00 10,540.00
Construction 157 CONPVI208 PV Systems Installation NC II 284 36 7,468.00 500.00 5,760.00 13,728.00
Construction 158 CONPVS308 PV Systems Servicing NC 111 158 20 9,000.00 500.00 3,200.00 12,700.00
Construction 159 CONRSW213 Reinforcing Steel Works NC II 162 21 9,000.00 1,006.00 3,360.00 13,366.00
Construction 160 CONRGG107 Rigging NCI 116 15 15,000.00 2,144.00 2,400.00 19,544.00
Scaffolding Works NC II (Supported Type
Construction 161 CONSCA218 181 23 6,520.00 1,276.00 3,680.00 11,476.00
Scaffold)
TESDA CIRCULAR
Page
Number
17 of 30 pages
Subject: Schedule of Costs of TESDA Scholarship Programs
0041series of 2023
Date Issued: Effectivity: Supersedes:
TESDA Circular No. 051, series of 2022
TESDA Circular No. 032. series of 2022
TESDA Circular No. 094, series of 2021
16 January 2023 Immediately TESDA Circular No. 13, 13-A, 13-B, 13-C. series of 2021
TESDA Circular No. 006-A, series of 2021
TESDA Circular No. 065-A, series of 2020
To meet the objectives of Training for Work Scholarship Program (TWSP), Private Education Student Financial Assistance (PESFA), Special Training Employment Program (STEP), Tulong
Trabaho Scholarship Program (TTSP). Rice Extension Service Program (RESP). Coconut Farmers Scholarship Program (CFSP). Barangay Kabuhayan Skills Training Program (BKSTP), and
Tsuper Iskolar. the following schedule of costs per qualification are hereby adopted. The following training costs relative to the implementation of TESDA Scholarship Programs are based on
the following cost factors: Variable Costs (consumables, utilities, facilties, equipment and tools maintenance; honoraria of trainers; and living allowance); and Fixed Costs (miscellaneous fees,
national assessment fees. instructional materials, and other allowances.). Training duration of scholarship programs with entrepreneurship are inclusive of 3-day entrepreneurship training.
Further, implementation of supervised industry learning (SIL) is not covered under the scholarship program.
To meet the objectives of Training for Work Scholarship Program (TWSP), Private Education Student Financial Assistance (PESFA), Special Training Employment Program (STEP), Tulong
Trabaho Scholarship Program (TTSP), Rice Extension Service Program (RESP). Coconut Farmers Scholarship Program (CFSP). Barangay Kabuhayan Skills Training Program (BKSTP). and
Tsuper Iskolar, the following schedule of costs per qualification are hereby adopted. The following training costs relative to the implementation of TESDA Scholarship Programs are based on
the following cost factors: Variable Costs (consumables, utilities, facilties, equipment and tools maintenance; honoraria of trainers; and living allowance); and Fixed Costs (miscellaneous fees,
national assessment fees. instructional materials, and other allowances.). Training duration of scholarship programs with entrepreneurship are inclusive of 3-day entrepreneurship training.
Further, implementation of supervised industry learning (SIL) is not covered under the scholarship program.
To meet the objectives of Training for Work Scholarship Program (TWSP), Private Education Student Financial Assistance (PESFA), Special Training Employment Program (STEP), Tulong
Trabaho Scholarship Program (TTSP), Rice Extension Service Program (RESP), Coconut Farmers Scholarship Program (CFSP), Barangay Kabuhayan Skills Training Program (BKSTP), and
Tsuper Iskolar. the following schedule of costs per qualification are hereby adopted. The following training costs relative to the implementation of TESDA Scholarship Programs are based on
the following cost factors: Variable Costs (consumables, utilities, facilties, equipment and tools maintenance: honoraria of trainers; and living allowance): and Fixed Costs (miscellaneous fees,
national assessment fees. instructional materials, and other allowances.). Training duration of scholarship programs with entrepreneurship are inclusive of 3-day entrepreneurship training.
Further, implementation of supervised industry learning (SIL) is not covered under the scholarship program.
Language and Culture 226 English Language and other English NTRs 100 13 7,314.00 2,080.00 9,394.00
Language and Culture 227 German Language and Culture 100 13 1,500.00 - 2,080.00 3,580.00
Language and Culture 228 Italian Language and Culture 100 13 1,500.00 2,080.00 3,580.00
Language and Culture 229 Japanese Language and Culture (150 hours) 150 19 7,525.00 - 3,040.00 10,565.00
Language and Culture 230 Japanese Language And Culture (300 hours) 300 38 14,920.00 6,080.00 21,000.00
Language and Culture 231 Korean Language and Culture 100 13 4,250.00 - 2,080.00 6.330.00
Language and Culture 232 Mandarin Chinese Language and Culture 100 13 1,500.00 - 2,080.00 3,580.00
TESDA CIRCULAR
Page 20 of 30 pages
Subject: Schedule of Costs of TESDA Scholarship Programs
Number 0011, series of 2023
Date Issued: Effectivity: Supersedes:
TESDA Circular No. 051, series of 2022
TESDA Circular No. 032. series of 2022
TESDA Circular No. 094, series of 2021
16 January 2023 Immediately TESDA Circular No. 13, 13-A, 13-B, 13-C, series of 2021
TESDA Circular No. 006-A, series of 2021
TESDA Circular No. 065-A, series of 2020
To meet the objectives of Training for Work Scholarship Program (TWSP), Private Education Student Financial Assistance (PESFA), Special Training Employment Program (STEP), Tulong
Trabaho Scholarship Program (TTSP), Rice Extension Service Program (RESP). Coconut Farmers Scholarship Program (CFSP). Barangay Kabuhayan Skills Training Program (BKSTP), and
Tsuper Iskolar. the following schedule of costs per qualification are hereby adopted. The following training costs relative to the implementation of TESDA Scholarship Programs are based on
the following cost factors: Variable Costs (consumables, utilities, facilties, equipment and tools maintenance: honoraria of trainers; and living allowance); and Fixed Costs (miscellaneous fees,
national assessment fees. instructional materials, and other allowances.). Training duration of scholarship programs with entrepreneurship are inclusive of 3-day entrepreneurship training.
Further, implementation of supervised industry learning (SIL) is not covered under the scholarship program.
Metals and Engineering 237 MEECL0209 CNC Lathe Machine Operation NC /I 236 30 26,497.00 500.00 4,800.00 31,797.00
Metals and Engineering 238 MEECL0309 CNC Lathe Machine Operation NC III 234 30 32,886.00 500.00 4,800.00 38,186.00
Metals and Engineering 239 MEECM0209 CNC Milling Machine Operation NC II 236 30 27,862.00 500 00 4,800.00 33,162.00
Metals and Engineering 240 MEECM0309 CNC Milling Machine Operation NC III 234 30 29,060.00 500.00 4,800.00 34,360.00
Metals and Engineering 241 MEEFCW106 Flux Cored Arc Welding (FCAW) NC I 156 20 10,000.00 500.00 3,200.00 13,700.00
Metals and Engineering 242 MEEFCW206 Flux Cored Arc Welding (FCAW) NC II 268 34 10,000.00 3,353.00 5,440.00 18,793.00
Metals and Engineering 243 MEEFCW306 Flux Cored Arc Welding (FCAW) NC III 148 19 15,000.00 500.00 3,040.00 18,540.00
Metals and Engineering 244 MEEMIG106 Gas Metal Arc Welding (GMAW) NC I 268 34 14,110.00 500.00 5,440.00 20,050.00
Metals and Engineering 245 MEEMIG206 Gas Metal Arc Welding (GMAW) NC II 268 34 26,688.00 3,361.00 5,440.00 35,489.00
Metals and Engineenng 246 MEEMIG306 Gas Metal Arc Welding (GMAW) NC III 148 19 15,000.00 500.00 3,040.00 18,540.00
Metals and Engineenng 247 MEETIG206 Gas Tungsten Arc Welding (GTAW) NC II 268 34 22,872.00 2.126.00 5,440.00 30,438.00
Metals and Engineering 248 MEETIG406 Gas Tungsten Arc Welding (GTAW) NC /V 294 37 10,000.00 500.00 5,920.00 16,420.00
Metals and Engineering 249 MEEGSW106 Gas Welding NC / 156 20 10,385.00 500.00 3,200.00 14,085.00
Metals and Engineering 250 MEEGSW206 Gas Welding NC II 312 39 12,227.00 600.00 6,240.00 19,067.00
Metals and Engineering 251 MEEMCG119 Machining NC 1 1.590 199 7,000.00 2,252.00 31,840.00 41,092.00
Metals and Engineering 252 MEEMCG106 1 374 47 7,000.00 500.00 7.520.00 15,020.00
Metals and Engineering 253 MEEMCG205 Machining NC 11 337 43 15,770.00 600.00 6,880.00 23.250.00
Metals and Engineering 254 MEEMCG306 Machining NC III 342 43 18,137.00 500.00 6,880.00 25,517.00
Metals and Engineering 255 MEEDFT108 Mechanical Drafting NC 1 218 28 3,500.00 500.00 4,480.00 8,480.00
Metals and Engineering 256 MEEPMM108 Plant Maintenance NCI 358 45 7,000.00 500.00 7,200.00 14,700.00
Metals and Engineering 257 MEEPM0108 Press Machine Operation NC I 294 37 7,000.00 500.00 5,920.00 13,420.00
Metals and Engineering 258 MEEEAW106 Shielded Metal Arc Welding (SMAW) NC I 268 34 14,594.00 2,234.00 5,440.00 22,268.00
Metals and Engineering 259 MEEEAW206 Shielded Metal Arc Welding (SMAW) NC II 268 34 15,460.00 2,697.00 5,440.00 23,597.00
TESDA CIRCULAR
Page 21 of 30 pages
Subject: Schedule of Costs of TESDA Scholarship Programs
Number 00' series of 2023
Date Issued: Effectivity: Supersedes:
TESDA Circular No. 051, series of 2022
TESDA Circular No. 032. series of 2022
TESDA Circular No. 094, series of 2021
16 January 2023 Immediately TESDA Circular No. 13, 13-A, 13-B, 13-C, series of 2021
TESDA Circular No. 006-A, series of 2021
TESDA Circular No. 065-A, series of 2020
To meet the objectives of Training for Work Scholarship Program (TWSP), Private Education Student Financial Assistance (PESFA), Special Training Employment Program (STEP), Tulong
Trabaho Scholarship Program (TTSP), Rice Extension Service Program (RESP), Coconut Farmers Scholarship Program (CFSP), Barangay Kabuhayan Skills Training Program (BKSTP), and
Tsuper Iskolar. the following schedule of costs per qualification are hereby adopted. The following training costs relative to the implementation of TESDA Scholarship Programs are based on
the following cost factors: Variable Costs (consumables, utilities, facilties, equipment and tools maintenance: honoraria of trainers; and living allowance); and Fixed Costs (miscellaneous fees.
national assessment fees. instructional materials, and other allowances.). Training duration of scholarship programs with entrepreneurship are inclusive of 3-day entrepreneurship training.
Further, implementation of supervised industry learning (SIL) is not covered under the scholarship program.
To meet the objectives of Training for Work Scholarship Program (TWSP). Private Education Student Financial Assistance (PESFA), Special Training Employment Program (STEP), Tulong
Trabaho Scholarship Program (TTSP), Rice Extension Service Program (RESP), Coconut Farmers Scholarship Program (CFSP), Barangay Kabuhayan Skills Training Program (BKSTP), and
Tsuper Iskolar, the following schedule of costs per qualification are hereby adopted. The following training costs relative to the implementation of TESDA Scholarship Programs are based on
the following cost factors: Variable Costs (consumables, utilities, facilties, equipment and tools maintenance; honoraria of trainers; and living allowance); and Fixed Costs (miscellaneous fees,
national assessment fees, instructional materials, and other allowances.). Training duration of scholarship programs with entrepreneurship are inclusive of 3-day entrepreneurship training.
Further. implementation of supervised industry learning (SIL) is not covered under the scholarship program.
To meet the objectives of Training for Work Scholarship Program (TWSP), Private Education Student Financial Assistance (PESFA), Special Training Employment Program (STEP), Tulong
Trabaho Scholarship Program (TTSP), Rice Extension Service Program (RESP). Coconut Farmers Scholarship Program (CFSP). Barangay Kabuhayan Skills Training Program (BKSTP). and
Tsuper Iskolar, the following schedule of costs per qualification are hereby adopted. The following training costs relative to the implementation of TESDA Scholarship Programs are based on
the following cost factors: Variable Costs (consumables, utilities, facilties, equipment and tools maintenance; honoraria of trainers; and living allowance); and Fixed Costs (miscellaneous fees,
national assessment fees. instructional materials, and other allowances.). Training duration of scholarship programs with entrepreneurship are inclusive of 3-day entrepreneurship training.
Further, implementation of supervised industry learning (SIL) is not covered under the scholarship program.
To meet the objectives of Training for Work Scholarship Program (TWSP), Private Education Student Financial Assistance (PESFA), Special Training Employment Program (STEP), Tulong Trabaho
Scholarship Program (TTSP), Rice Extension Service Program (RESP), Coconut Farmers Scholarship Program (CFSP), Barangay Kabuhayan Skills Training Program (BKSTP), and Tsuper lskolar, the
following schedule of costs per qualification are hereby adopted. The following training costs relative to the implementation of TESDA Scholarship Programs are based on the following cost factors: Variable
Costs (consumables, utilities, facilties, equipment and tools maintenance: honoraria of trainers: and living allowance): and Fixed Costs (miscellaneous fees, national assessment fees, instructional materials,
and other allowances.). Training duration of scholarship programs with entrepreneurship are inclusive of 3-day entrepreneurship training. Further, implementation cf supervised industry learning (SIL) is not
covered under the scholarship program.
No. of No. of Training
Qualification Training Assessment Entrepreneurship Per Capita Cost
Sector No. TVET Qualification Title Training Training Support Fund
Code Cost (PhP) Fee (PhP) Fee (PhP) (PhP)
Hours Days (PhP)
, f=e48 hrs per i=r(Php160.00
a b d e 9 h k=g+trfi+j
day) per day)
PAFSE
Agriculture, Forestry,
1 AFFACP105 Agricultural Crops Production NC I 326 41 12,690.00 300.00 6,560.00 800.00 20,350.00
and Fishery
Agriculture, Forestry, 2 AFFACP213 Agricultural Crops Production NC II 360 45 15,390.00 995.00 7,200.00 800.00 24,385.00
and Fishery
Agriculture, Forestry,
3 AFFACP306 Agricultural Crops Production NC III 469 59 18,670.00 400.00 9,440.00 800.00 29,310.00
and Fishery
Agriculture, Forestry, Animal Production (Poultry-Chicken) NC II (Without
4 AFFAPP213 250 32 11,424.00 897.00 5,120.00 800.00 18,241.00
and Fishery Elective)
Agriculture, Forestry,
5 AFFAPR213 Animal Production (Ruminants) NC II 330 42 20,634.00 1,629.00 6,720.00 800.00 29,783.00
and Fishery
Agriculture, Forestry, 6 AFFAPS213 Animal Production (Swine) NC II 330 42 14,003.00 2,015.00 6,720.00 800.00 23,538.00
and Fishery
Agriculture, Forestry,
7 AFFAQC204 Aquaculture NC II (superseded)' 1300 163 10,000.00 350.00 26,080.00 800.00 37,230.00
and Fishery
Agriculture, Forestry, 8
Coffee Production Level II 200 25 6,900.00 4,000 00 800.00 11,700.00
and Fishery
Agriculture, Forestry, 9
AFFFGR307 Fishing Gear Repair and Maintenance NC III 176 22 10,000.00 500.00 3,520.00 800.00 14,820.00
and Fishery
Agriculture, Forestry,
10 AFFFSC105 Fish Capture NCI 376 47 9,757.00 400.00 7,520.00 800.00 18,477.00
and Fishery
Agriculture, Forestry,
11 AFFFSC206 Fish Capture NC II 342 43 9,000.00 400.00 6,880.00 800.00 17,080.00
and Fishery
Agriculture, Forestry,
12 AFFFW0107 Fishport/Wharf Operation NCI 120 15 3,500.00 500.00 2,400.00 800.00 7,200.00
and Fishery
Agriculture, Forestry,
13 AFFHTC306 Horticulture NC III 469 59 8,000.00 300.00 9,440.00 800.00 18,540.00
and Fishery
Agriculture, Forestry, Landscape Installation and Maintenance
14 AFFLIM208 236 30 21,590.00 500.00 4,800.00 800.00 27,690.00
and Fishery (Softscape) NC II
Agriculture, Forestry,
15 AFFOAP212 Organic Agriculture Production NC II 256 32 23,391.00 979.00 5,120.00 800.00 30,290.00
and Fishery
Agriculture, Forestry, Organic Agriculture Production NC!! (Without
16 AFFOAP212 202 26 13,355.00 979.00 4,160.00 800.00 19,294.00
and Fishery Electives)
Agriculture, Forestry,
17 AFFPMV207 Pest Management (Vegetables) NC 11 336 42 13,746.00 500.00 6,720.00 800.00 21,766.00
and Fishery
Agriculture, Forestry,
18 AFFRM0207 Rice Machinery Operations NC II 256 32 22,339.00 1,323.00 5,120.00 800.00 29,582.00
and Fishery
Agriculture, Forestry, -,
19 AFFRPC212 Rubber Processing NC /I 186 24 19,797.00 500.00 3,840.00 800.00 24,937.00
and Fishery
Agriculture, Forestry,
20 AFFRPT212 Rubber Production NC II (superseded)' 346 44 10,000.00 500.00 7,040.00 800.00 18.340.00
and Fishery
Agriculture, Forestry,
21 AFFRPT221 Rubber Production NC II 345 44 10,000.00 500.00 7,040.00 800.00 18,340.00
and Fishery
Agriculture, Forestry, Raise Organic Chicken (Leading to Organic
22 AGR612301 96 12 3,601.00 808.00 1,920.00 800.00 7,129.00
and Fishery Agriculture Production NC II)
Agriculture, Forestry, Produce Organic Vegetables (Leading to Organic
23 AGR611306 88 11 6,604.00 814.00 1,760.00 800.00 9,978.00
and Fishery Agriculture Production NC II)
Agriculture, Forestry, Brood and Grow Chicks (Leading to Animal
24 AFF622102 260 33 10,400.00 796.00 5,280.00 800.00 17,276.00
and Fishery Production (Poultry-Chicken) NC II)
Agriculture, Forestry, Handle Breeders (Leading to Animal Production
25 AFF621216 260 33 7,700.00 805.00 5,280.00 800.00 14,585.00
and Fishery (Swine) NC II)
Agriculture, Forestry, Maintain Poultry house (Leading to Animal
26 AFF622101 94 12 2,970.00 778.00 1,920.00 800.00 6,468.00
and Fishery Production (Poultry-Chicken) NC II)
Agriculture, Forestry, Perform Breeding of Ruminants (Leading to Animal
27 AFF621903 86 11 5,739.00 790.00 1,760.00 800.00 9,089.00
and Fishery Production (Ruminants) NC II)
Agriculture, Forestry, Perform pre-lay and lay activities (Leading to
28 AFF622103 94 12 3,058.00 777.00 1,920.00 800.00 6,555.00
and Fishery Animal Production (Poultry-Chicken) NC II)
Agriculture, Forestry, Provide Forage (Leading to Animal Production
29 AFF621902 76 10 3,526.00 785.00 1,600.00 800.00 6,711.00
and Fishery (Ruminants) NC II)
Agriculture, Forestry, Raise Dairy Animals (Leading to Animal Production
30 AFF621904 260 33 8,271.00 822.00 5,280.00 800.00 15,173.00
and Fishery (Ruminants) NC II
TESDA CIRCULAR Page 25 of 30 pages
Subject: Schedule of Cost of TESDA Scholarship Programs
Number q_N, Series of 2023
Date Issued: Effectivity: Supersedes:
TESDA Circular No, 051, series of 2022
TESDA Circular No. 032, series of 2022
TESDA Circular No. 094, series of 2021
16 January 2023 Immediately TESDA Circular No. 13, 13-A, 13-B, 13-C, series of 2021
TESDA Circular No. 006-A, series of 2021
TESDA Circular No. 065-A, series of 2020
To meet the objectives of Training for Work Scholarship Program (TWSP), Private Education Student Financial Assistance (PESFA), Special Training Employment Program (STEP), Tulong Trabaho
Scholarship Program (TTSP), Rice Extension Service Program (RESP), Coconut Farmers Scholarship Program (CFSP), Barangay Kabuhayan Skills Training Program (BKSTP), and Tsuper Iskolar, the
following schedule of costs per qualification are hereby adopted. The following training costs relative to the implementation of TESDA Scholarship Programs are based on the following cost factors: Variable
Costs (consumables; utilities, facilties, equipment and tools maintenance; honoraria of trainers; and living allowance); and Fixed Costs (miscellaneous fees, national assessment fees, instructional materials,
and other allowances.). Training duration of scholarship programs with entrepreneurship are inclusive of 3-day entrepreneurship training. Further, implementation of supervised industry learning (SIL) is not
covered under the scholarship program.
No. of No. of Training
Qualification Training Assessment Entrepreneurship Per Capita Cost
Sector No. TVET Qualification Title Training Training Support Fund
Code Cost (PhP) Fee (PhP) Fee (PhP) (PhP)
Hours Days (PhP)
fre/(8 his per i=r(Php160.00
a b c d e g h I k=g+h+t+i
day) per day)
Agriculture, Forestry, Raise Meat Type Animals (Leading to Animal
31 AFF621905 66 9 3,625.00 829.00 1,440.00 800.00 6,694.00
and Fishery Production (Ruminants) NC II)
Agriculture, Forestry, Raise Organic Hogs (Leading to Organic
32 AGR612302 104 13 5,688.00 815.00 2,080.00 800.00 9,383.00
and Fishery Agriculture Production NC II)
Agriculture, Forestry, Raise Organic Small Ruminants (Leading to
33 AGR612303 88 11 4,854.00 803.00 1,760.00 800.00 8,217.00
and Fishery Organic Agriculture Production NC II)
Agriculture, Forestry, Produce Organic Concoctions and Extracts
34 AGR611302 88 11 3,400.00 816.00 1,760.00 800.00 6,776.00
and Fishery (Leading to Organic Agriculture Production NC II)
Agriculture, Forestry, Apply Bio-Control Measures (Leading to Pest
35 AGR321321 76 10 1,300.00 1,600.00 800.00 3,700.00
and Fishery Management (Vegetables) NC II)
Agriculture, Forestry, Apply Cultural Management Strategies (Leading to
36 AGR321322 88 11 1,600.00 1,760.00 800.00 4,160.00
and Fishery Pest Management (Vegetables) NC II)
Agriculture, Forestry, Apply Physical Control Measures (Leading to Pest
37 AGR321323 76 10 1,300.00 - 1,600.00 800.00 3,700.00
and Fishery Management (Vegetables) NC II)
Agriculture, Forestry, Conduct Field Assessment (Leading to Pest
38 AGR321320 64 8 1,000.00 - 1,280.00 800.00 3,080.00
and Fishery Management (Vegetables) NC II)
Agriculture, Forestry, Control Weeds (Leading to Agricultural Crops
39 AGR611313 68 9 2,100.00 - 1,440.00 800.00 4,340.00
and Fishery Production NC III)
Agriculture, Forestry, Coordinate Horticultural Crop Harvesting (Leading
40 AGR611317 94 12 1,300.00 - 1,920,00 800.00 4,020.00
and Fishery to Horticulture NC Ill)
Agriculture, Forestry, Coordinate Horticultural Maintenance Program _
41 AGR611316 94 12 1,300.00 1,920.00 800.00 4,020.00
and Fishery (Leading to Horticulture NC III)
Agriculture, Forestry,
42 Corn Production 112 14 2,600.00 - 2,240.00 800.00 5,640.00
and Fishery
Agriculture, Forestry, 43
Edible Landscapping with Farm Branding 72 9 1,800.00 - 1,440.00 800.00 4,040.00
and Fishery
Agriculture, Forestry, Establish Agronomics Crops (Leading to
44 AGR611320 76 10 900.00 - 1,600.00 800.00 3,300.00
and Fishery Agricultural Crops Production NC III)
Agriculture, Forestry, Establish Horticultural Maintenance Program
45 AGR611315 60 8 600.00 - 1,280,00 800.00 2,680.00
and Fishery (Leading to Horticulture NC Ill)
Agriculture, Forestry, Implement Plant Nutrition Program (Leading to
46 AGR611312 68 9 2,100.00 - 1,440.00 800.00 4,340.00
and Fishery Agricultural Crops Production NC III)
Agriculture, Forestry, Implement Post-Harvest Program (Leading to
47 AGR611311 68 9 800.00 - 1,440.00 800.00 3,040.00
and Fishery Agricultural Crops Production NC III)
Agriculture, Forestry, Keep Records for Farm Business (Leading to
48 AGR611331 60 8 600.00 - 1,280.00 800.00 2,680.00
and Fishery Agricultural Crops Production NC III)
Agriculture, Forestry, Maintain and Monitor Environment Work Practices
49 AGR611330 94 12 1,300.00 - 1,920.00 800.00 4,020.00
and Fishery (Leading to Horticulture NC III)
Maintain housing, farm implements and
Agriculture, Forestry,
50 AFFAPR213 surrounding area (Leading to Animal Production 66 9 1,400.00 835.00 1,440.00 800.00 4,475.00
and Fishery
(Ruminants) NC II)
Monitor results of Pest Management Activities and
Agriculture, Forestry,
51 AGR321325 Provide Feedback (Leading to Pest Management 76 10 1,300.00 1,600.00 800.00 3,700.00
and Fishery
(Vegetables) NC II)
Agriculture, Forestry, 52
Oil Palm Production 152 19 3,800.00 - 3,040.00 800.00 7,640.00
and Fishery
Agriculture, Forestry, 53
Organic Arabica Coffee Production 256 32 6,900.00 - 5,120.00 800.00 12,820.00
and Fishery
Agriculture, Forestry, 54
Organic Rice Production 120 15 2,900.00 - 2,400.00 800.00 6,100.00
and Fishery
Agriculture, Forestry, 55
Oyster Mushroom Production with Farm Branding 72 9 1,400.00 - 1,440.00 800.00 3,640.00
and Fishery
Agriculture, Forestry, Plant crops (Leading to Agricultural Crops
56 AFF 610302 76 10 2,100.00 844.00 1,600.00 800.00 5,344.00
and Fishery Production NC II)
Agriculture, Forestry, Prepare Land for Agricultural Crop Production
57 AGR611310 76 10 900.00 - 1,600.00 800.00 3,300.00
and Fishery (Leading to Agricultural Crop Production NC Ill)
Agriculture, Forestry, Produce Organic Fertilizer (Leading to Organic
58 AGR611301 88 11 800.00 810.00 1,760.00 800.00 4,170.00
and Fishery Agriculture Production NC II)
Agriculture, Forestry, Support Agronomic Crop Work (Leading to
59 AGR611308 96 12 1,900.00 - 1,920.00 800.00 4,620.00
and Fishery Agricultural Crop Production NC I)
TESDA CIRCULAR Page 26 of 30 pages
Subject: Schedule of Cost of TESDA Scholarship Programs
Number f, Series of 2023
Date Issued: Effectivity: Supersedes:
TESDA Circular No. 051, series of 2022
TESDA Circular No. 032, series of 2022
TESDA Circular No. 094. series of 2021
16 January 2023 Immediately TESDA Circular No. 13, 13-A, 13-B, 13-C, series of 2021
TESDA Circular No. 006-A, series of 2021
TESDA Circular No. 065-A, series of 2020
To meet the objectives of Training for Work Scholarship Program (TWSP), Private Education Student Financial Assistance (PESFA), Special Training Employment Program (STEP), Tulong Trabaho
Scholarship Program (TTSP), Rice Extension Service Program (RESP), Coconut Farmers Scholarship Program (CFSP). Barangay Kabuhayan Skills Training Program (BKSTP), and Tsuper Iskolar, the
following schedule of costs per qualification are hereby adopted. The following training costs relative to the implementation of TESDA Scholarship Programs are based on the following cost factors: Variable
Costs (consumables, utilities, facilties, equipment and tools maintenance; honoraria of trainers; and living allowance); and Fixed Costs (miscellaneous fees, national assessment fees, instructional materials,
and other allowances.). Training duration of scholarship programs with entrepreneurship are inclusive of 3-day entrepreneurship training. Further, implementation of supervised industry learning (SIL) is not
covered under the scholarship program.
No. of No. of Training
Qualification Training Assessment Entrepreneurship Per Capita Cost
Sector No. TVET Qualification Title Training Training Support Fund
Code Cost (PhP) Fee (PhP) Fee (PhP) (PhP)
Hours Days (PhP)
fre/(8 his per ir f*(Php160.00
a b c d e g h ) k=g+h+i+)
day) - per day)
Agriculture, Forestry, Support Horticultural Crop Work (Leading to
60 AGR611306 96 12 1,900.00 - 1,920.00 800.00 4,620.00
and Fishery Agricultural Crops Production NCI)
Agriculture, Forestry, Support Nursery Work (Leading to Agricultural Crop 78
61 AGR611307 10 1,400.00 - 1,600.00 800.00 3,800.00
and Fishery Production NC I)
Agriculture, Forestry, Undertake Agronomic Crop Harvesting Activities
62 AGR611322 60 8 600.00 - 1,280.00 800,00 2,680.00
and Fishery (Leading to Agricultural Crops Production NC Ill)
To meet the objectives of Training for Work Scholarship Program (TWSP), Private Education Student Financial Assistance (PESFA), Special Training Employment Program (STEP), Tulong Trabaho
Scholarship Program (TTSP), Rice Extension Service Program (RESP), Coconut Farmers Scholarship Program (CFSP), Barangay Kabuhayan Skills Training Program (BKSTP), and Tsuper Iskolar, the
following schedule of costs per qualification are hereby adopted. The following training costs relative to the implementation of TESDA Scholarship Programs are based on the following cost factors: Vanable
Costs (consumables, utilities, facilties, equipment and tools maintenance; honoraria of trainers; and living allowance); and Fixed Costs (miscellaneous fees, national assessment fees, instructional materials,
and other allowances.). Training duration of scholarship programs with entrepreneurship are inclusive of 3-day entrepreneurship training. Further, implementation of supervised industry learning (SIL) is not
covered under the scholarship program.
No. of No. of Training
Qualification Training Assessment Entrepreneurship Per Capita Cost
Sector No. TVET Qualification Title Training Training Support Fund
Code Cost (PhP) Fee (PhP) Fee (PhP) (PhP)
Hours Days (PhP)
freI(8 hrs per i=frhp160.00
a b c d e 9 j k=g+h+i+j
day) per day)
STEP
Agriculture, Forestry,
17f AFFAGE417 Agroentrepreneurship NC IV 739 93 8,218.80 853.00 14,880.00 800.00 24,751.80
and Fishery
Agriculture, Forestry, Animal Production (Poultry-Chicken) NC II (Without
1 AFFAPP213 250 32 11,424.00 897.00 5,120.00 800.00 18,241.00
and Fishery Elective)
Agriculture, Forestry, 2
AFFAPS213 Animal Production (Swine) NC II 330 42 14,003.00 2,015.00 6,720.00 800.00 23,538.00
and Fishery
Agriculture, Forestry, 3
AFFAPR213 Animal Production (Ruminants) NC /I 330 42 20,634.00 1,629.00 6,720.00 800,00 29,783.00
and Fishery
Agriculture, Forestry, Perform Breeding of Ruminants (Leading to Animal 86
4 AFF621903 11 5,739.00 790.00 1,760.00 800.00 9,089.00
and Fishery Production (Ruminants) NC II)
Agriculture, Forestry, Perform pre-lay and lay activities (Leading to
5 AFF622103 94 12 3,058.00 777.00 1,920.00 800.00 6,555.00
and Fishery Animal Production (Poultry-Chicken) NC II)
Agriculture, Forestry, Plant crops (Leading to Agricultural Crops
6 AFF 610302 76 10 2,100.00 844.00 1,600.00 800.00 5,344.00
and Fishery Production NC II)
Agriculture, Forestry, Prepare Land for Agricultural Crop Production
7 AGR611310 76 10 900.00 - 1,600.00 800.00 3,300.00
and Fishery (Leading to Agricultural Crop Production NC III)
Agriculture, Forestry, Produce Organic Concoctions and Extracts
8 AGR611302 88 11 1,000.00 816,00 1,760,00 800,00 4,376.00
and Fishery (Leading to Organic Agriculture Production NC II)
Agriculture, Forestry, Produce Organic Fertilizer (Leading to Organic
9 AGR611301 88 11 800.00 810.00 1,760.00 800.00 4,170.00
and Fishery Agriculture Production NC II)
Agriculture, Forestry, Raise Dairy Animals (Leading to Animal Production
10 AFF621904 260 33 8,271.00 822.00 5,280.00 800.00 15,173.00
and Fishery (Ruminants) NC II
Agriculture, Forestry, Raise Meat Type Animals (Leading to Animal
11 AFF621905 66 9 3,625.00 829.00 1,440.00 800.00 6,694.00
and Fishery Production (Ruminants) NC II)
Agriculture, Forestry, Raise Organic Hogs (Leading to Organic
12 AGR612302 104 13 5,688.00 815.00 2,080,00 800.00 9,383.00
and Fishery Agriculture Production NC II)
Agriculture, Forestry, Raise Organic Small Ruminants (Leading to
13 AGR612303 88 11 4,854.00 803.00 1,760.00 800.00 8,217.00
and Fishery Organic Agriculture Production NC II)
Agriculture, Forestry, Support Agronomic Crop Work (Leading to
14 AGR611308 96 12 1,900.00 1,920.00 800.00 4,620.00
and Fishery Agricultural Crop Production NC I)
Agriculture, Forestry, Support Horticultural Crop Work (Leading to
15 AGR611306 96 12 1,900.00 1,920.00 800.00 4,620.00
and Fishery Agricultural Crops Production NC I)
Agriculture, Forestry, Support Nursery Work (Leading to Agricultural Crop 78
16 AGR611307 10 1,400.00 1,600.00 800.00 3,800.00
and Fishery Production NC I)
Agriculture, Forestry, Undertake Agronomic Crop Harvesting Activities
17 AGR611322 60 8 600.00 1,280.00 800.00 2,680.00
and Fishery (Leading to Agricultural Crops Production NC Ill)
To meet the objectives of Training for Work Scholarship Program (TWSP), Private Education Student Financial Assistance (PESFA), Special Training Employment Program (STEP), Tulong Trabaho
Scholarship Program (TTSP), Rice Extension Service Program (RESP), Coconut Farmers Scholarship Program (CFSP), Barangay Kabuhayan Skills Training Program (BKSTP), and Tsuper Iskolar, the
following schedule of costs per qualification are hereby adopted. The following training costs relative to the implementation of TESDA Scholarship Programs are based on the following cost factors: Variable
Costs (consumables, utilities, facilties, equipment and tools maintenance; honoraria of trainers; and living allowance); and Fixed Costs (miscellaneous fees, national assessment fees, instructional materials,
and other allowances.). Training duration of scholarship programs with entrepreneurship are inclusive of 3-day entrepreneurship training. Further, implementation of supervised industry learning (SIL) is not
covered under the scholarship program.
No. of No. of Training
Qualification Training Assessment Entrepreneurship Per Capita Cost
Sector No. TVET Qualification Title Training Training Support Fund
Code Cost (PhP) Fee (PhP) Fee (PhP) (PhP)
Hours Days (PhP)
fre./(8 hrs per ir f*(Php160.00
a b c d e h j k=g+h+i+j
day) g per day)
Construction 31 CONPLM114 Plumbing NCI 192 24 19,629.00 + 1,609.00 3,840.00 800.00 25,878.00
Construction 32 CONTIL218 Tile Setting NCI! 141 18 10,605.00 1,415.00 2,880.00 800.00 15,700.00
Construction 33 HVCWAC211 RAC Servicing (DomRAC) NC !1 (Superseded)' 504 63 14,272.00 500.00 10,080.00 800.00 25,652.00
Construction 34 CONPVI208 PV Systems Installation NC II 284 36 7,468.00 500.00 5,760.00 800.00 14,528.00
Electrical and
35 Assembly of Solar Nightlight and Post Lamp 64 8 5,000.00 470.00 1,280.00 800.00 7,550.00
Electronics
Electrical and
36 ELCEIM215 Electrical Installation and Maintenance NC II 220 28 6,215.00 1,849.00 4,480.00 800.00 13,344.00
Electronics
Electrical and Assemble Electronic Products (Leading to EPAS
37 ELC724335 104 13 2,000.00 917.00 2,080.00 800.00 5,797.00
Electronics NC II)
Electrical and Service Consumer Electronic Products and
38 ELC724336 120 15 3,000.00 881.00 2,400.00 800.00 7,081.00
Electronics Systems (Leading to EPAS NC II)
Garments and Textiles 39 GRMDRM205 Dressmaking NC!! 299 38 6,295.00 1,348.00 6,080.00 800.00 14,523.00
Garments and Textiles 40 GRMTLR205 Tailoring NC II 299 38 14,071.00 1,684.00 6,080.00 800.00 22,635.00
Metals and Engineering 41 MEEEAW106 Shielded Metal Arc Welding (SMAI4) NC I 292 37 14,594.00 2,234.00 5,920.00 800.00 23,548.00
Metals and Engineering 42 MEEEAW206 Shielded Metal Arc Welding (SMAW) NC II 292 37 15,460.00 2,697.00 5,920 00 800.00 24,877.00
Processed Food and
43 PFBFOP119 Food Processing NCI 221 28 5,719.00 1,506.00 4,480.00 800.00 12,505.00
Beverages
Processed Food and Process Food by Fermentation and Pickling
44 PFB751331 220 28 5,000.00 1,250.00 4,480.00 800.00 11,530.00
Beverages (Leading to Food Processing NC II)
Processed Food and Process Food by Salting, Curing and Smoking
45 PFB751330 104 13 2,000.00 485.00 2,080.00 800.00 5,365.00
Beverages (Leading to Food Processing NC II)
Processed Food and Process Food by Sugar Concentration (Leading to
46 PFB751332 120 15 3,000.00 470.00 2,400.00 800.00 6,670.00
Beverages Food Processing NCI!)
Tourism (Hotel and
47 TRSBPP209 Bread and Pastry Production NC II 165 21 16,968.00 400.00 3,360.00 800.00 21,528.00
Restaurant)
Tourism (Hotel and
48 TRSCOK214 Cookery NC II 340 43 20,315.00 1,300.00 6,880.00 800.00 29,295.00
Restaurant)
Tourism (Hotel and 49 Prepare and Cook Hot Meals (Leading to Cookery
224 28 4,600.00 500.00 4,480.00 800.00 10,380.00
Restaurant) NC II)
Tourism (Hotel and 50
Prepare Cold Meals (Leading to Cookery NC 10 128 16 3,400.00 500.00 2,560.00 800.00 7,260.00
Restaurant)
IT-BPM (ICT) 51 ICTVGD318 Visual Graphic Design NC ill 525 66 17,497.00 932.00 10,560.00 800.00 29,789.00
'Vehicle and/or equipment used during assessment are provided by the Assessment Centers for Driving and Heavy Equipment Operations qualifications.
'Vehicle and/or equipment used during assessment are not provided by the Assessment Centers for Driving and Heavy Equipment Operations qualifications.
'Corn is being used during assessment.
'Rice is being used during assessment.
With promulgated training regulations. however. can still be implemented within the migration period and/or without Regional Lead Assessors yet
*Duration of Production of Hich-Quality Inbred Rice. Seed Certification, and Farm Mechanization shall follow the training hours of the 14 sessions as issued by the Department of Agriculture
TESDA CIRCULAR Page 29 of 30 pages
Subject: Schedule of Cost of TESDA Scholarship Programs
Number 004 Series of 2023
Date Issued: Effectivity: Supersedes:
TESDA Circular No. 051, series of 2022
TESDA Circular No. 032, series of 2022
TESDA Circular No. 094, series of 2021
16 January 2023 Immediately TESDA Circular No. 13, 13-A, 13-B, 13-C, series of 2021
TESDA Circular No. 006-A, series of 2021
TESDA Circular No. 065-A, series of 2020
To meet the objectives of Training for Work Scholarship Program (TWSP), Private Education Student Financial Assistance (PESFA), Special Training Employment Program (STEP), Tulong Trabaho Scholarship Program
(TTSP), Rice Extension Service Program (RESP), Coconut Farmers Scholarship Program (CFSP), Barangay Kabuhayan Skills Training Program (BKSTP); and Tsuper Iskolar, the following schedule of costs per qualification
are hereby adopted. The following training costs relative to the implementation of TESDA Scholarship Programs are based on the following cost factors: Variable Costs (consumables, utilities, facilties, equipment and tools
maintenance; honoraria of trainers; and living allowance); and Fixed Costs (miscellaneous fees, national assessment fees, instructional materials, and other allowances.). Training duration of scholarship programs with
entrepreneurship are inclusive of 3-day entrepreneurship training. Further, implementation of supervised industry learning (S L) is not covered under the scholarship program.
CFSP
Agriculture, Forestry,
1 AFFAGE217 Agroentrepreneurship NC II 263 33 10,085.00 854.00 100.80 5,280.00 1,000.00 800.00 18.119.80
and Fishery
Agriculture, Forestry, 326 41
2 AFFACP105 Agricultural Crops Production NCI 12,690.00 300.00 100.80 6,560.00 1,000.00 800.00 21,450.80
and Fishery
Agriculture, Forestry,
3 AFFACP213 Agricultural Crops Production NC II 360 45 15,390.00 995.00 100.80 7,200.00 1,000.00 800.00 25,485.80
and Fishery
Agriculture, Forestry,
4 AFFACP306 Agricultural Crops Production NC Ill 469 59 18,670.00 400.00 100.80 9,440.00 1,000.00 800.00 30.410.80
and Fishery
Agriculture, Forestry, Animal Production (Poultry-Chicken) NC It
5 AFFAPP213 250 32 11,424.00 897.00 100.80 5,120.00 1,000.00 800.00 19,341.80
and Fishery (Without Elective)
Agriculture, Forestry,
6 AFFAPR213 Animal Production (Ruminants) NC II 330 42 20,634.00 1,629.00 100.80 6,720.00 1,000.00 800.00 30,883.80
and Fishery
Agriculture, Forestry, 7
Coffee Production Level II 200 25 6,900.00 100.80 4,000.00 1,000.00 800.00 12,800.80
and Fishery
Agriculture, Forestry,
8 AFFOAP212 Organic Agriculture Production NC II 256 32 23,391.00 979.00 100.80 5,120.00 1,000.00 800 00 31,390.80
and Fishery
Agriculture, Forestry, Organic Agriculture Production NC II
9 AFFOAP212 202 26 13,355.00 979.00 100.80 4,160.00 1,000.00 800.00 20,394.80
and Fishery (Without Electives)
Agriculture, Forestry, Raise Organic Chicken (Leading to Organic 96
10 AGR612301 12 3,601.00 808.00 100.80 1,920.00 1,000.00 800.00 8,229.80
and Fishery Agriculture Production NC II)
Agriculture, Forestry, Produce Organic Vegetables (Leading to
11 AGR611306 88 11 6,604.00 814.00 100.80 1,760.00 1,000.00 800.00 11,078.80
and Fishery Organic Agriculture Production NC II)
To meet the objectives of Training for Work Scholarship Program (TWSP). Private Education Student Financial Assistance (PESFA), Special Training Employment Program (STEP), Tulong Trabaho Scholarship Program
(TTSP), Rice Extension Service Program (RESP), Coconut Farmers Scholarship Program (CFSP), Barangay Kabuhayan Skills Training Program (BKSTP), and Tsuper lskolar, the following schedule of costs per qualification
are hereby adopted. The following training costs relative to the implementation of TESDA Scholarship Programs are based on the following cost factors: Variable Costs (consumables, utilities, facilties, equipment and tools
maintenance; honoraria of trainers; and living allowance); and Fixed Costs (miscellaneous fees, national assessment fees, instructional materials, and other allowances.). Training duration of scholarship programs with
entrepreneurship are inclusive of 3-day entrepreneurship training. Further, implementation of supervised industry learning (S L) is not covered under the scholarship program.
No. of No. of Training New Normal
Qualification Training Assessment Insurance Entrepreneurship Per Capita Cost
Sector No. TVET Qualification Title Training Training Support Fund Assistance
Code Cost (PhP) Fee (PhP) Fee (PhP) Fee (PhP) (PhP)
Hours f.e4D8abyrss per (PhP) (Php)
j=t-(Php160.00
a b c d e h i k 1 m=g+h-vi4j4+1
day) g per day)
Agriculture, Forestry, Plant crops (Leading to Agricultural Crops
28 AFF 610302 76 10 2,100.00 844.00 100.80 1,600.00 1,000.00 800.00 6,444.80
and Fishery Production NC II)
Prepare Land for Agricultural Crop
Agriculture, Forestry,
29 AGR611310 Production (Leading to Agricultural Crop 76 10 900.00 100.80 1,600.00 1,000.00 800.00 4,400.80
and Fishery
Production NC Ill)
Agriculture, Forestry, Produce Organic Fertilizer (Leading to
30 AGR611301 88 11 800.00 810.00 100.80 1,760.00 1,000.00 800.00 5,270.80
and Fishery Organic Agriculture Production NC II)
Agriculture, Forestry, Support Agronomic Crop Work (Leading to
31 AGR611308 96 12 1,900.00 100.80 1,920.00 1,000.00 800.00 5,720.80
and Fishery Agricultural Crop Production NC I)
New TESDA issuances on chanaes of assessment fees shall prevail and shall likewise be adopted
This Circular applies to FY 2023 funds and takes effect immediately upon posting in the TESDA website.
DANILO P. CRUZ.
Director General /1