Company: PT Hilti Nusantara Page: 1/1
Specifier: PT Wiratman Infrastructure Project: HVS
Address: The Garden Centre Lv.3 No. 3-11B, Kawasan Komersial Cilandak Fastening point: Existing beam
Phone | Fax: +62811 1914 9078 Date: November 19, 2022
E-mail: mahayekti.bagaskara@hilti.com
Specifiers comments:
This is the propose design for chemical post-installed rebar based on the provided information. Please check this proposal with the responsible engineer for
approval.
Design Sketch
Top view: Section: Remarks:
c = min(cx, cy)
cx s
linst Section
cy
Design Input:
Bar size Φ 16 [mm]
Drill bit size D 20 [mm]
Bar yield strength fyk 400 [N/mm2]
Partial safety factor for steel gs 1
Bar yield strength design fyd 400 [N/mm2]
Concrete cube compressive strength fck 33.20 [N/mm2]
Bar spacing s 72 [mm] 5Φ, ETA
Designed load in bar Fbar 36.70 [kN] Design for defined load
Design anchorage length lbd = max[(Φ / 4) * (σsd / fbd); lb,min] 250 [mm]