ISOLATION AND LOCKOUT/ TAGOUT (LOTO)

FOR DETAILED INFORMATION REFER TO SOP: SULB-


QHSE-P-09

LOTO stands for lockout/tagout. When done properly before equipment service or maintenance, lockout/tagout
procedures control hazardous energy and protect workers from harm.

DE-ENERGIZING OF ELECTRICAL, HYDRAULIC, PNEUMATIC, GASES, HIGH PRESSURE WATER, SYSTEM, CHEMICAL,
THERMAL OR ANY OTHER STORED ENERGY SOURCE.

WHEN MORE THAN ONE AGENCY APPLIED LOCKING DEVICES


TO MULTIPLE ENERGY SOURS POINTS, A MULTIPLE LOCKOUT
HASP AND/ OR GROUP LOCKOUT BOX WILL BE USED.

Multi Lock Adapter/ HASP


Group Lockout Box

ISOLATION LOCK

Mechanical Maintenance Electrical Maintenance


Operation LOCK Contractor LOCK
LOCK LOCK

Source Point Tag Equipment Tag


Do not Operate tags should Do not Operate tags
not be removed from the should not be removed
isolating devices until the from the isolating
job is completed and devices until the job is
permit is closed completed and permit
is closed