The purpose of the RCC Lock Out / Tag Out Procedures are to ensure that
where employees and others, are exposed to work situations that carry a
risk of
• Electrical shock
• Electrocution
• Electrical burns
• Fire
• Explosion
that the work situation is assessed and that suitable control measures' and
systems are implemented to ensure that electrical risks / hazards are
removed or reduced as far as reasonably practicable.
Authorized Engineer
Eng Safvan
Competent Persons
Authorized Project Manager
• Overviews company’s Lock Out / Tag Out requirements
• Appoints Project Authorizing Engineers
• Overall responsibility for the LOTO system
• Periodic audit of complete company/project LOTO procedures
COMPETENT PERSONS
• Acknowledge the Lock Out / Tag Out
• Understand the requirements of the system of work
• Implement and comply with the Lock Out / Tag Out
This is a formalized written procedure for the control of
high voltage systems or complex low voltage systems.
• On Issue Permits-To-Work
• Cancelled Permits-To-Work
ISOLATE THE SYSTEM AND CARRY OUT TESTS TO ENSURE CONDUCTORS AND
EQUIPMENT IS DEAD
A document issued by an
Authorised Person to a Competent
Person, under signature, defining a
safe system of work which includes
switching operations and other
measures that have been carried
out to ensure that the risks from the
systems are minimised.
Part 2 Receipt
Competent person signs to
confirm understanding of the
permit and its limitations.
Accepting responsibility for
carrying out the work on
Part 3 Clearance
On completion of work, the
competent person signs for
clearance and returns it to the
authorized person for close out.
Part 4 Cancellation
Cancellation is done by
authorized person.
Permit Issue
Complete part 1 of permit giving full details of precautions taken to
make equipment safe. Also write exact details of work to be carried out.
(LOTO AP)
Top white copy kept in the site permit book. (LOTO AP)
2nd copy issued to competent person. (LOTO AP)
The competent person shall retain the 2nd copy in his possession at all
times while the work is being carried out. (Competent Person)
Any change in scope of work will require cancellation of permit and the
issue a new permit detailing the revised work. (Competent Person)
Permit Cancellation
Where multiple permits have been issued ensure all permits have
been cancelled before main circuit earths are removed or power re-
established. (LOTO AP)
Third party must supply inspection/test sheets confirming
plant/equipment safe to energies. (RCC/AGCCIC 3rd Party
Subcontractors)
• Contacts for help (Contact Details are mentioned all over site)
• Means of communication
• Address and phone number of first aid
facility/hospital
LOTO Team
Authorized Engineers
• Muhammad El Shazli – Mobile 055-1492958
• Vinod Babu – Mobile 050-8350564
• Safvan _ Mobile 054-3670077
OPERATION ONLY BY
AUTHORIZED ENGINEER