Refrigerant Calculation of Bir Hospital

Length(m)
liquid lines gas lines
diameter(mm) 6.4 9.5 12.7 15.9 12 15
EHP-1 0.0 58.1 0.0 0 0 18
EHP-2 0.0 79.2 0.0 0 0 17
EHP-3 37.5 60.4 0.0 0 38 0
EHP-4 18.8 34.8 71.0 0 0 0
EHP 5 75.8 11.4 11.0 36 76 0
EHP 6 41.9 33.1 68.9 0 42 34
EHP 7 0.0 76.7 0.0 0 76
EHP 8 0.0 68.1 0.0 0 0 68
EHP 9 0.0 63.0 0.0 0 0 63
EHP 10 0.0 36.1 51.4 0 0 37
EHP 11 0.0 122.8 0.0 0 0 57
OAC 0.0 72.9 0.0 0 0
ehp 12 34 0
174.0 716.6 236.3 36.1 156.0 370.0
Total

total
6 174.0
9 716.6
12 392.3
15 406.1
18 69
22 316.9
28 202.0

copper pipe ( quantity in meter)


s.no size (mm) Ground floor first floor second floor total consumed
1 6.00 71 136 207
2 9 145 107 190 712
3 12 105 124 45 389
4 15 55 107 140 445
5 19 25 0 0 63
6 22 62 50 268
7 28 35 34 45 264
gas lines
19 22 28 total indoor capacity(ton) Total outdoor capacity(ton)
0 41 0 0 16
63 0 5.1 4.8
61 0 12.2 12.8
0 0 12.8 12.8
67 12 47
0 69
0 0
0 0
0 0
0 52
67 0
73 6.8 6.4
0 34
67.0 316.9 202.0
Total Refrigerant(Kg)

BOQ estimated quantity


311
715
389
488
86
190
267
Connection Ratio A(Kg) Refrigerant amount (Kg)
0 1.5 4.8
107.1 1.2 5.7
95.1 1 5.3
100 1 11.2
100 1.5 11.2
100 1.5 11.9
100 1.5 5.9
100 1.5 5.4
100 1.5 5.1
100 1.5 9.2
100 1.5 8.5
106.696428571429 1.2 5.4

89.5
#REF!