The document contains information about 37 presses including their type, size, and availability status. It also provides details on planned production, remarks, planned activities, and assignment of technicians for ongoing maintenance work. The presses include both hydraulic and mechanical types ranging in size from 42 to 55. The majority are mechanical presses, with availability varying across the presses. Various maintenance and repair activities are planned or ongoing to address issues and prepare presses for production.
The document contains information about 37 presses including their type, size, and availability status. It also provides details on planned production, remarks, planned activities, and assignment of technicians for ongoing maintenance work. The presses include both hydraulic and mechanical types ranging in size from 42 to 55. The majority are mechanical presses, with availability varying across the presses. Various maintenance and repair activities are planned or ongoing to address issues and prepare presses for production.
The document contains information about 37 presses including their type, size, and availability status. It also provides details on planned production, remarks, planned activities, and assignment of technicians for ongoing maintenance work. The presses include both hydraulic and mechanical types ranging in size from 42 to 55. The majority are mechanical presses, with availability varying across the presses. Various maintenance and repair activities are planned or ongoing to address issues and prepare presses for production.
1 Hydraulic 52 Available 2 Hydraulic 52 Available 3 Mechanical 55 Available 4 Mechanical 55 Available 5 Mechanical 42 Not Available 6 Mechanical 42 Available 7 Mechanical 42 Not Available 8 Mechanical 42 Not Available 9 Mechanical 42 Not Available 10 Mechanical 42 Available 11 Mechanical 42 Available 12 Mechanical 42 Not Available 13 Mechanical 42 Available 14 Mechanical 42 Available 15 Mechanical 42 Available 16 Mechanical 42 Available 17 Mechanical 42 Available 18 Mechanical 42 Available 19 Mechanical 42 Not Available 20 Mechanical 42 Available 21 Mechanical 55 Not Available 22 Mechanical 55 Not Available 23 Hydraulic 48 Available 24 Hydraulic 48 Available 25 Hydraulic 48 Available 26 Hydraulic 48 Not Available 27 Hydraulic 48 Available 28 Hydraulic 48 Available 29 Hydraulic 48 Available 30 Hydraulic 48 Available 31 Mechanical 42 Not Available 32 Mechanical 42 Not Available 33 Mechanical 42 Not Available 34 Mechanical 42 Not Available 35 Mechanical 42 Not Available 36 Mechanical 42 Available 37 Mechanical 42 Available Production Remark Planned Planned Planned Only one side Planned Only one side Not Planned Ongoing Overhaul Planned Not Planned Final Checking Ongoing Not Planned Closing Force Issue Not Planned Mould to be fixed Planned Planned Not Planned Mould to be fixed Planned Planned Planned Planned Planned Planned Not Planned Mould to be fixed Planned Not Planned Overhaul to be Planned Not Planned Overhaul to be Planned Planned Planned Planned Not Planned Hydraulic Cylinder Leakage Planned Planned Only one side Planned Planned Only one side Not Planned Overhaul to be Planned Not Planned Overhaul to be Planned Not Planned Overhaul to be Planned Not Planned Overhaul to be Planned Not Planned Safety valve pending Planned Planned PRESS NO P5 P5 P5 P5 P7 P8 PLANNED ACTIVITY Valve module modification Cable laying with new valve module Main electrical panel fixing Final checking for production Final checking for production Press closing force variation checking TYPE OF JOB START DATE EXPECTED END DATE REVISED END DATE STATUS Mech. 23/01/2023 21/2/2023 ONGOING Elec. 10/2/2023 10/2/2023 NOT STARTED Elec. 11/2/2023 13/2/2023 2/17/2023 ONGOING Elec.+Mech. 14/2/2023 16/2/2023 2/22/2023 NOT STARTED Elec.+Mech. 31/01/2023 8/2/2023 ONGOING Elec.+Mech. 2/9/2023 2/22/2023 ONGOING ASSIGN TECHNICIAN RESPONSIBLE ENG. Kasun + Rasika Heshan+CSCL Chamara Maduka R. Eranda Maduka R. Jayakody Maduka R.+Heshan+CSCL Eranda+Madhawa Maduka R.+Heshan+CSCL Kasun E.+Malinda Maduka R.+Heshan+CSCL REMARK Finished the all line connectting process to main return lines. Only Have to finish upper part welding/ Copper tube c After valve modification is done Motor overload checking ongoing Need to complete all other parts Press closing abnormalities being checked Need to check guide bush clearence/ Reassembling ongoing/ Electrical Checking Ongoing t welding/ Copper tube connecting ongoing