Press No.

Type Size Condition


1 Hydraulic 52 Available
2 Hydraulic 52 Available
3 Mechanical 55 Available
4 Mechanical 55 Available
5 Mechanical 42 Not Available
6 Mechanical 42 Available
7 Mechanical 42 Not Available
8 Mechanical 42 Not Available
9 Mechanical 42 Not Available
10 Mechanical 42 Available
11 Mechanical 42 Available
12 Mechanical 42 Not Available
13 Mechanical 42 Available
14 Mechanical 42 Available
15 Mechanical 42 Available
16 Mechanical 42 Available
17 Mechanical 42 Available
18 Mechanical 42 Available
19 Mechanical 42 Not Available
20 Mechanical 42 Available
21 Mechanical 55 Not Available
22 Mechanical 55 Not Available
23 Hydraulic 48 Available
24 Hydraulic 48 Available
25 Hydraulic 48 Available
26 Hydraulic 48 Not Available
27 Hydraulic 48 Available
28 Hydraulic 48 Available
29 Hydraulic 48 Available
30 Hydraulic 48 Available
31 Mechanical 42 Not Available
32 Mechanical 42 Not Available
33 Mechanical 42 Not Available
34 Mechanical 42 Not Available
35 Mechanical 42 Not Available
36 Mechanical 42 Available
37 Mechanical 42 Available
Production Remark
Planned
Planned
Planned Only one side
Planned Only one side
Not Planned Ongoing Overhaul
Planned
Not Planned Final Checking Ongoing
Not Planned Closing Force Issue
Not Planned Mould to be fixed
Planned
Planned
Not Planned Mould to be fixed
Planned
Planned
Planned
Planned
Planned
Planned
Not Planned Mould to be fixed
Planned
Not Planned Overhaul to be Planned
Not Planned Overhaul to be Planned
Planned
Planned
Planned
Not Planned Hydraulic Cylinder Leakage
Planned
Planned Only one side
Planned
Planned Only one side
Not Planned Overhaul to be Planned
Not Planned Overhaul to be Planned
Not Planned Overhaul to be Planned
Not Planned Overhaul to be Planned
Not Planned Safety valve pending
Planned
Planned
PRESS NO
P5
P5
P5
P5
P7
P8
PLANNED ACTIVITY
Valve module modification
Cable laying with new valve module
Main electrical panel fixing
Final checking for production
Final checking for production
Press closing force variation checking
TYPE OF JOB START DATE EXPECTED END DATE REVISED END DATE STATUS
Mech. 23/01/2023 21/2/2023 ONGOING
Elec. 10/2/2023 10/2/2023 NOT STARTED
Elec. 11/2/2023 13/2/2023 2/17/2023 ONGOING
Elec.+Mech. 14/2/2023 16/2/2023 2/22/2023 NOT STARTED
Elec.+Mech. 31/01/2023 8/2/2023 ONGOING
Elec.+Mech. 2/9/2023 2/22/2023 ONGOING
ASSIGN TECHNICIAN RESPONSIBLE ENG.
Kasun + Rasika Heshan+CSCL
Chamara Maduka R.
Eranda Maduka R.
Jayakody Maduka R.+Heshan+CSCL
Eranda+Madhawa Maduka R.+Heshan+CSCL
Kasun E.+Malinda Maduka R.+Heshan+CSCL
REMARK
Finished the all line connectting process to main return lines. Only Have to finish upper part welding/ Copper tube c
After valve modification is done
Motor overload checking ongoing
Need to complete all other parts
Press closing abnormalities being checked
Need to check guide bush clearence/ Reassembling ongoing/ Electrical Checking Ongoing
t welding/ Copper tube connecting ongoing