Professional Documents
Culture Documents
A3-Shaping Issue at Press No.15 in PCR Curing
A3-Shaping Issue at Press No.15 in PCR Curing
A3 No. and Name Team members (name & role) Stakeholders (name & role) Department Organisation objective
Shaping issue at press no.15 1. Mr.Heshan, Mr.Asiri, Mr.Maduka, Continuous production with less BD & delays
Mr.Sandeepa 1. Mr.Thushara Engineering
2. Mr.Pasan 2. Mr. Technical
Team Leader (name & 'phone ext) 3. Mr. 3. Mr. Production Start date & planned duration
4. Mr. 4. Mr. Planning 13-02-2023, 1 Month
1. Clarify the problem 4. Analyse the Root Cause 7. Monitor Results & Process
Is: Shaping issue at press no.15
Is not: Other issues in press no.15 & all issues in other presses
Machine
Thread & sidewall low guage coat off or loose coat ply
Ply guage
Material
5. Develop Countermeasures
6. Implement Countermeasure
4
Machine
Ply guage
Material
age
n the bladder
e malfunction
ve bypassing
Uncontrolled shaping
Shaping delay
Missing cord
Ply guage
Material