Remove the T-Cut as shown in the below figure in red
arrow by removing the weld without damaging the
existing structural members.
Step 1
Duro Felguera Tata Engineering Tata QC
Name: Name: Name:
Date: Date: Date:
Page 1 of 13
Step 2:
Remove the existing top plate (290 mm X 300 mm X 10
mm thick) of the North and South stair column as shown
in red arrow.
Step 2
Duro Felguera Tata Engineering Tata QC
Name: Name: Name:
Date: Date: Date:
Page 2 of 13
Step 3:
Arrange the Temporary supporting beam as shown in the
below plan of top level.
Step 3
Duro Felguera Tata Engineering Tata QC
Name: Name: Name:
Date: Date: Date:
Page 3 of 13
Step 4:
Remove beam marked E213 by disconnecting the existing
bolts and cutting the welds as shown below.
Step 4
Duro Felguera Tata Engineering Tata QC
Name: Name: Name:
Date: Date: Date:
Page 4 of 13
Step 5:
The North Side column flanges shall be cut and shall be
re-built as shown in the below figure.
Detail 1 in Step 5
N
EIC
Container
Side
Step 5
Duro Felguera Tata Engineering Tata QC
Name: Name: Name:
Date: Date: Date:
Page 5 of 13
This side strengthening
Detail 1 be decided based on
actual space availability
at site
This plate
This plate
already
already
removed
removed
Existing
IPE 400
X X
Holes in plates could be
done at site or shop
depending upon the
TYP. suitability.
Step 5
Duro Felguera Tata Engineering Tata QC
Name: Name: Name:
Date: Date: Date:
Page 6 of 13
This plate already removed
Section X-X
Corroded Zone (to be determined at site) + 100 mm
118 mm 118 mm
Step 5
Duro Felguera Tata Engineering Tata QC
Name: Name: Name:
Date: Date: Date:
Page 7 of 13
Step 6:
The South Side column inside flanges shall be
repaired/strengthened as per step 5.
Step 6
Duro Felguera Tata Engineering Tata QC
Name: Name: Name:
Date: Date: Date:
Page 8 of 13
Step 7:
The outside flange of South side column shall be repaired
as per the figure shown below.
See Detail 2
Detail 2
Already
removed
To be determined at site
To be determined at site
TYP.
Step 7
Duro Felguera Tata Engineering Tata QC
Name: Name: Name:
Date: Date: Date:
Page 10 of 13
Step 8:
The Beam marked in the below figure E213 that was
disconnected in Step 4 shall be re-built with new beam
(IPE 400) and connected to the strengthened column by
new 12 nrs. M20, 8.8 bolts in each side.
Step 8
Duro Felguera Tata Engineering Tata QC
Name: Name: Name:
Date: Date: Date:
Page 11 of 13
Step 9:
The dismantled T-Cuts for new EIC Container supporting
platform beam connection shall be erected as per details
provided in drawing H69487 and so on (fabrication
drawing of EIC Container supporting structure).
Step 9
Duro Felguera Tata Engineering Tata QC
Name: Name: Name:
Date: Date: Date:
Page 12 of 13
N.B. - Please note that the new materials shall be of S355 J2 grade and there shall be
preferably no live load over top platform of south staircase while working.