ENGINEERING DEPARTMENT
5-2 5-1
6-2 6-1
Analyze of Causes 7 8
Results
Burr
Analyze of Causes
- This is matching point, some time have burr, and
burr standard is 0.1.
- No have chamfer burr in mold.
Matching point
have burr
Results
Testing OK
Khuôn không có insert để tỳ burr sau khi
cắt hình sản phẩm
SPACER- Cutting die come up when running
Some time cutting die come up when running. -Making key for holding cutting die
Analyze of Causes
Results
Testing OK
BRACKET 2950 – Backing die was Broken
-Backing die was broken -Making new Backing die with thickness changing from 25 to
35mm, adding a Block between backing die and Lower die set for
Hole of
Backing 1
Analyze of Causes
-Because space between backing die and die set big, and Hole of
thickness of backing die is 15mm so backing die was weak. Backing 2
Results
Hole of
Lower die
set
Waiting to test
This space big so
backing die is weak
TARGET DOWNTIME OF MOLD IN 2018
DOWNTIME
30.0
26.0 26.3
25.5 25.6 25.3
25.0 24.9 24.7 24.2
15.0
10.0
5.0
0.0
T1 T2 T3 T4 T5 T6 T7 T8 T9 T10 T11 T12
Detail
T9
60
50
40
30
Target
20%
max
20
10
0
TARGET OF NEW MOLD IN 2018
Target Mold follow Sale
8
Sale get 4 item of Kyowa and 3
Item of Keihin
7
0
1 2 3 4 5 6 7 8 9 10 11 12
Detail
Schedule Testing New Mold
1 Upper One
3 Lever A
4 Lever B
Same
5 Ankle Ratchet Base 20
27-8 Same
6 Toe Ratchet Base 20
27-8 Same
7 Staywire K560
30-9
Same
8 Lever Throttle K560-0100
30-9
testing
9 Shield Bracket of Astra Visteon
27-9
testing
10 Lever Throttle K560-0000
30-9
testing
11 Valve Throttle Blank K560
30-9
Testing
12 Bracket 2710