SMPL Inspection Test Plan

Part Name:-SNAP HEAD RIVET Customer:- KSSL Lot Size:- 15 Nos. Sample Size:- 15 Nos.

Part No.: - PIR Rev: - Die No.: - Date:- 16.09.2023

Drawing No:- 823-104-18-065-0 Drg. Rev:- ITP No. : Confidential


Part No. Part No. Part No. Part No. Part No. Part No.
Part No. 1 Part No. 2 Part No. 3 Part No. 4 Part No. 5 Part No. 6 Part No. 7 Part No. 8 Part No. 9
Nominal 10 11 12 13 14 15
Sr. No. Balloon No. Zone
Dimension
Lower Limit Upper Limit Inspection Method Remarks
obs. obs. obs. obs. obs. obs. obs. obs. obs. obs. obs. obs. obs. obs. obs.

1 1 2B 12.0 + 0.50 12.00 12.50 Profile Projector Match To Profile Template OK

2 2 2B Ø2.90 Ø3.05 Micrometer 2.97 3.01 2.98 2.98 2.99 2.98 3.01 3.01 3.00 3.01 2.98 3.01 2.98 3.00 2.99 OK

3 3 2B Ø6.0±0.3 Ø5.70 Ø6.30 Profile Projector Match To Profile Template OK

Visual Inspection :- Found Satisfactory

Note:- Critical, Major & Minor characteristics are not mentioned on the drawing

Total Accepted Qty : - 15 Nos

Examiner Supervisor (D.G.M. - QC)