Demand per day 100

Working Hour per day 8


Number of Analyst 8
Number of QC 5
Demand Per Analyst 12.5
Demand Per QC 20
Lambda Analyst 1.5625
Lambda QC 2.5
muA 1.712
muQ 3

n(Number of entities
waiting)-For probability 2
calculation

c 8 c 5
M/M/1 M/M/8(Investigation) M/M/5(QC)
Analyst QC
rho 0.912675 0.833333 7.30140186915888
P0 0.087325 0.166667 0.0011925
Pn 0.832976 0.694444
Ls 10.45151 5
Lq 9.53883 4.166667
Ws 6.688963 2
Wq 6.104851 1.666667
System Utilization
0.912675 0.833333
Rate(Saturation)
Analyst K Sum QC K Sum
c 8 200.3224 821.087 c 5 172.9219 218.2471
7 219.4892 4 118.4169
6 210.4287 3 64.87353
5 172.9219 2 26.65523
4 118.4169 1 7.301402
3 64.87353 0 1
2 26.65523
1 7.301402
0 1

M/M/5(QC)
0.0003210191