Professional Documents
Culture Documents
Laporan FIG.F1318 Politeknik Negeri Semarang
Laporan FIG.F1318 Politeknik Negeri Semarang
Working Temp °C Working Press 6Bar Mpa(kgf/cm²) Project Politeknik Negeri Semarang
Usage AC PL
• FF Company
ETC PIC
Contact
CLAIM REPORT
There is a leak in the Bonnet
Date 21 December 2022
OBSERVATION RESULT
There is a leak in the Bonnet Pressure Reducing Valve, the documentary evidence is attached
Rejection :
We are willing to help regarding the complaints we have received. The inspection procedure will determine whether the product is suitable for
replacement or we can simply repair it which can be done in the field. However, we reserve the right not to change the product if: