CAPAZ-PA-PO-018-22

14-Nov-22

STRUCTURAL WORKS
ITEM NO. ITEM UNIT QTY UNIT COST AMOUNT REMARKS PAYMENT
1 Cement Bags 100 ₱ 220.00 ₱ 22,000.00

2 Gravel, G1 Cu.m. 22 ₱ 1,300.00 ₱ 28,600.00

3 Gravel, 3/4" Cu.m. 22 ₱ 1,300.00 ₱ 28,600.00

4 White Sand Truck load 1 ₱ 6,500.00 ₱ 6,500.00


ABIJUN
PDC
CONSTRUCTION
5 Common Wire Nail, 1-1/2" Kgs. 10 ₱ 120.00 ₱ 1,200.00

6 Common Wire Nail, 2" Kgs. 10 ₱ 120.00 ₱ 1,200.00

7 Cutting Disc, 4" Pcs 10 ₱ 20.00 ₱ 200.00

8 Cutting Disc, 14" Pcs 10 ₱ 200.00 ₱ 2,000.00


TOTAL ₱ 90,300.00

Prepared by: Approved by:

Justine De Castro
Project Engineer