CAPAZ-PA-PO-019-22

23-Nov-22

STRUCTURAL WORKS
ITEM NO. ITEM UNIT QTY UNIT COST AMOUNT REMARKS PAYMENT
1 Cement Bags 100 ₱ 220.00 ₱ 22,000.00

2 White Sand Truck load 1 ₱ 7,500.00 ₱ 7,500.00

3 Common Wire Nail, 1-1/2" Kgs. 10 ₱ 120.00 ₱ 1,200.00

4 Concrete Nail, 2" Kgs. 5 ₱ 120.00 ₱ 600.00


ABIJUN
5 Cutting Disc, 4" Pcs 10 ₱ 20.00 ₱ 200.00 PDC
CONSTRUCTION
6 Cutting Disc, 14" Pcs 10 ₱ 200.00 ₱ 2,000.00

7 Drill Bits (For Stone), 12mm Pcs 4 ₱ 200.00 ₱ 800.00

8 Butane Pcs 10 ₱ 150.00 ₱ 1,500.00

9 PVC 3/4 Pcs 50 ₱ 140.00 ₱ 7,000.00


TOTAL ₱ 42,800.00

Prepared by: Approved by:

Justine De Castro
Project Engineer