You are on page 1of 2

Opening

The honorable IEC commander, OEI team leader and the team.
All IEC officers. Good morning/afternoon/evening everyone
Thank you for giving me the chance to greet you all. Before I start the
presentation, I would like to introduce myself. I’m Major Dicky Pane as
COO and So Eng, nice to finally see you in Bumi Nusantara Camp.

Slide 1
I would like to introduce the Indonesia engineering company.
Slide 2
These are the scope of IEC (dibaca poin yg ada)
Slide 3
IEC mission task are written on SOP No.488 MONUSCO/DCOS OPS SP
Slide 4
Next is IEC organization
Slide 5
The placement of IEC engineering section now are in mavivi, rumangabo,
eringeti, and in Indonesia for annual leave
Slide 6, 7, 8, 9
The activities that G1 IEC maintains are EOD training, camp security drill,
fire fighting, casevac, medevac, welfare and religion activities.
Slide 10
Next are G2 staff activities. There are monitoring about the latest news and
situation in AOR such as in killia, mutwanga, rumangabo, and Madiba.
Slide 11, 12, 13, 14, 15
Now G3 staff activities. They manage to organize the tasks that IEC should
do, dealing with engineering section like key task, major task, and minor
task.
Slide 16
We also have the future task such as …..
Slide 17, 18
Lets move on the G4 staff activities, they manage the heavy equipment and
COE inspections readiness.
Slide 19
We have medical section routine in this camp such as health service and
health support.
Slide 20
the challenges that IEC faces are …
slide 21
the effort of IEC to deal with the challenges are ….
Slide 22
That’s all for the presentation, thank you very much for your attention.

You might also like