It is submitted that the consumer against above subjected account number approached
to this office with written application regarding wrong billing. The meter inspector of this office checked
the record and reported that the batch number of the consumer’s reference number has been opened
wrong as 11, whereas the account number 0572106 falls in batch number 12. So the meter reader could
not locate the meter and he did not charged any unit to the consumer from 07/2022 to 10/2022.
Thereafter in billing month 11/2022 he found the meter and charged accumulative units to the
consumer i.e. 380 units, this is wrong.

It is therefore requested please segregate 380 units into 5 months, from 07/2022 to
11/2022 as well as issue revised bill to the consumer to settle the complaint.