Worksheet: [HospiTech_0.xlsx]Model
Report Created: 14-2-2023 16:06:44
Result: Solver found a solution. All Constraints and optimality conditions are satisfied.
Solver Engine
Engine: Simplex LP
Solution Time: 0,031 Seconds.
Iterations: 18 Subproblems: 0
Solver Options
Max Time Unlimited, Iterations Unlimited, Precision 0,000001, Use Automatic Scaling
Max Subproblems Unlimited, Max Integer Sols Unlimited, Integer Tolerance 1%, Assume NonNegative
Variable Cells
Cell Name Original Value Final Value Integer
$C$39 Task 1 Technician 1 0 0 Binary
$D$39 Task 1 Technician 2 0 0 Binary
$E$39 Task 1 Technician 3 1 1 Binary
$C$40 Task 2 Technician 1 0 0 Binary
$D$40 Task 2 Technician 2 1 1 Binary
$E$40 Task 2 Technician 3 0 0 Binary
$C$41 Task 3 Technician 1 1 1 Binary
$D$41 Task 3 Technician 2 0 0 Binary
$E$41 Task 3 Technician 3 0 0 Binary
$C$42 Task 4 Technician 1 0 0 Binary
$D$42 Task 4 Technician 2 1 1 Binary
$E$42 Task 4 Technician 3 0 0 Binary
$C$43 Task 5 Technician 1 1 1 Binary
$D$43 Task 5 Technician 2 0 0 Binary
$E$43 Task 5 Technician 3 0 0 Binary
$C$44 Task 6 Technician 1 0 0 Binary
$D$44 Task 6 Technician 2 0 0 Binary
$E$44 Task 6 Technician 3 1 1 Binary
$C$45 Task 7 Technician 1 0 0 Binary
$D$45 Task 7 Technician 2 0 0 Binary
$E$45 Task 7 Technician 3 1 1 Binary
$C$46 Task 8 Technician 1 0 0 Binary
$D$46 Task 8 Technician 2 0 0 Binary
$E$46 Task 8 Technician 3 1 1 Binary
$C$47 Task 9 Technician 1 0 0 Binary
$D$47 Task 9 Technician 2 0 0 Binary
$E$47 Task 9 Technician 3 1 1 Binary
$C$48 Task 10 Technician 1 0 0 Binary
$D$48 Task 10 Technician 2 0 0 Binary
$E$48 Task 10 Technician 3 1 1 Binary
Constraints
Cell Name Cell Value Formula Status Slack
$F$39 Task 1 Task done? 1 $F$39=1 Binding 0
$F$40 Task 2 Task done? 1 $F$40=1 Binding 0
$F$41 Task 3 Task done? 1 $F$41=1 Binding 0
$F$42 Task 4 Task done? 1 $F$42=1 Binding 0
$F$43 Task 5 Task done? 1 $F$43=1 Binding 0
$F$44 Task 6 Task done? 1 $F$44=1 Binding 0
$F$45 Task 7 Task done? 1 $F$45=1 Binding 0
$F$46 Task 8 Task done? 1 $F$46=1 Binding 0
$F$47 Task 9 Task done? 1 $F$47=1 Binding 0
$F$48 Task 10 Task done? 1 $F$48=1 Binding 0
$P$49 Total time used Technician 1 240 $P$49<=$P$50 Not Binding 600
$Q$49 Total time used Technician 2 140 $Q$49<=$Q$50 Not Binding 760
$R$49 Total time used Technician 3 625 $R$49<=$R$50 Not Binding 575
$C$39:$E$48=Binary
HospiTech
HospiTech is a company specialized in repairing hospital equipment.
The
Everycompany hires
week they freelancers
have to aperform
to prepare various
schedule repair
to decide tasksjobs
which on their
must clients equipment.
be carried out.
There are urgent jobs, which must be carried out on that week, and other jobs that can wait until next week (in case there is n
Repair revenues,
Each task must becosts, and to
assigned duration vary depending
a maximum on each task’s characteristics and depending on the level of experience o
of 1 technician
Below are the data related to this problem:
List of repair tasks, revenue per task, costs per task for each technician, and operating times by technicians:
Assignment Matrix
Job assignment
Objective function
€ 430.00
until next week (in case there is not enough capacity due to a lack of technicians).
by technicians:
Technician 2 Technician 3
(j=2) (j=3)
80 € 90 €
100 75
75 € 40 €
40 120
50 € 50 €
80 75
80 € 80 €
100 90
50 € 70 €
80 130
80 € 90 €
100 85
80 € 80 €
120 120
80 € 90 €
80 85
35 € 70 €
70 125
80 € 90 €
100 135
900 1200
Profit
Mandatory
tasks Technician 1 Technician 2 Technician 3
= 1 Task 1 50 € 40 € 30 €
= 1 Task 2 30 € 5€ 40 €
= 1 Task 3 50 € 90 € 90 €
= 1 Task 4 60 € 20 € 20 €
= 1 Task 5 25 € 45 € 25 €
>= 0 <= 1 Task 6 60 € 50 € 40 €
>= 0 <= 1 Task 7 75 € 60 € 60 €
>= 0 <= 1 Task 8 100 € 70 € 60 €
>= 0 <= 1 Task 9 30 € 65 € 30 €
>= 0 <= 1 Task 10 110 € 120 € 110 €
Minutes used