LENGTH
SI.NO. MANOLE REF M.H. DEPTH PIPE DIA 160 MM 250 MM
TOTAL 178.00
BREAKDOWN ITEMS FOR SEWERAGE WATER PIPE
rate Amount
SI no. DESCRIPTION Qty unit
(AED) (AED)
Supply and lay 250mm diameter
1 GRP pipe including future 178.00 m 156 27,768.00
connection
TOTAL
270,217.33
AMOUNT
250mm diameter pipe SMH58 to SMH63 see attached drawing for reference
H D Y W A h1 h2 Sectional Area 1 ( m2 ) Sectional Area 2 ( m2 ) Length Total Vol.
as per drawing as per drawing ( m3)
Excavation & LENGTH ex depth (m) difference average depth D>350mm;
1 MH NO. LEVAL
Cartaway (L) =(L / 250) (m) (m) Y=150mm / (W x h1) ((A+W)/2) x h2)
Trench Total Depth = D<350mm; Trench Width = Extra Trench Width Trench Depth 1 = Trench Depth 2 =
(Ave. depth +D+ Y) pipe diameter Y=200mm ((Dx1.5m)+500mm) = (W + h2) (300mm+D+Y) (H-h1) (X) (Y) (Z) (( X )+( Y ))x( Z )
SMH-58 3.70 29 0.116 3.70
SMH-59 3.816 34 0.136 4.052 4.327 0.25 0.15 0.875 4.502 0.7 3.627 0.6125 9.7511895 178 1844.74
SMH-60 3.952 33 0.132
SMH-61 4.084 45 0.18
SMH-62 4.264 35 0.14
SMH-63 4.404 0 4.404
250mm diameter pipe SMH58 to SMH63 see attached drawing for reference
H D Y W A h1 h2 Sectional Area 1 ( m2 ) Sectional Area 2 ( m2 ) Length Total Vol.
as per drawing as per drawing ( m3)
LENGTH ex depth (m) difference average depth D>350mm;
1 Back filling MH NO. LEVAL
(L) =(L / 250) (m) (m) Y=150mm / (W x h1) ((A+W)/2) x h2)
Trench Total Depth = D<350mm; Trench Width = Extra Trench Width Trench Depth 1 = Trench Depth 2 =
(Ave. depth + Y) pipe diameter Y=200mm ((Dx1.5m)+500mm) = (W + h2) (300mm+D+Y) (H-h1) (X) (Y) (Z) ( Y )x( Z )
SMH-58 3.70 29 0.116 3.70
SMH-59 3.816 34 0.136 4.052 4.327 0.25 0.15 0.875 4.502 0.7 3.627 0.6125 9.7511895 178 1735.71
SMH-60 3.952 33 0.132
SMH-61 4.084 45 0.18
SMH-62 4.264 35 0.14
SMH-63 4.404 0 4.404
250mm diameter pipe SMH58 to SMH63 see attached drawing for reference
H D Y W A h1 h2 Sectional Area 1 ( m2 ) Length Total Vol.
as per drawing ( m3)
LENGTH ex depth (m) difference average depth D>350mm;
1 Natural Gravel MH NO. LEVAL
(L) =(L / 250) (m) (m) Y=150mm / (W x h1)
Trench Total Depth = D<350mm; Trench Width = Extra Trench Width Trench Depth 1 = Trench Depth 2 =
(Ave. depth + Y) pipe diameter Y=200mm ((Dx1.5m)+500mm) = (W + h2) (300mm+D+Y) (H-h1) (X) (Z) ( X )x( Z )
SMH-58 3.70 29 0.116 3.70
SMH-59 3.816 34 0.136 4.052 4.327 0.25 0.15 0.875 4.502 0.7 3.627 0.6125 178 109.03
SMH-60 3.952 33 0.132
SMH-61 4.084 45 0.18
SMH-62 4.264 35 0.14
SMH-63 4.404 0 4.404
250mm diameter pipe SMH58 to SMH63 see attached drawing for reference