You are on page 1of 2

TAX INVOICE

Inv. No: 22-23/028


Inv.Date: 02 September 2022
GSTIN: 36AULPN5239P1ZT
STATE Telangana State Code 36
Details of Receiver | Billed to:
Name of Receiver: M/s. Gaja Engineering Pvt.Ltd
Divisional Engineer (Stores), Telangana State Power Generation Corporation (TSGENCO), Yadadri Thermal
Power Station-5x800MW, Veerlapalem Village, Miryalguda Post, Damercherla Mandal, Nalgonda District,
Telangana State -508 207.
Address:
GSTIN: 36AAECG5235C1ZY STATE Telangana State Code 36

Project Name: BHEL-PT YADADRI PROJECT

Sr. HSN / SAC Area in Taxable CGST SGST IGST


Name of Product / Service Rate Total Tax
No. Code Sq.ft. Value Rate Amount Rate Amount Rate Amount
The Structural Engineering Services -
1 998332 Lumpsum 575000 9% 51750 9% 51750 0% 0 103500
Total amount
Total : 575000 51750 51750 0 103500
Total Invoice Amount in Words: Total Amount Before Tax : 5,75,000
Add : CGST : 51,750
Rupees: One Lakh Seventy Two thousand rupees only
Add : SGST : 51,750
Bank Details Add : IGST : -
Bank Name : YES BANK Tax Amount : GST : 1,03,500
Account Number :025061900001256 Total Amount After Tax : 6,78,500
Account Number : Infrastructure Designers Advance Received 5,06,500
Branch IFSC : YESB0000250
Branch : Banjara Hills Balance receivable 1,72,000
Certified that the particulars given above are true and correct

For Infrastructure Designers

Authorised Signatory
BHEL THERMAL PLANT - PT PLANT STATUS AS ON DATE 20-08-2021

Civil UNIT LIST Approval Status

1 HRSCC DM Plant Clarifier(2 Clarifiers) Approved


2 DM Plant Cascade Aerator Approved
HRSCC for Pre-Treatment Plant(system-1)(3
3 Approved
Clarifiers)
HRSCC for Pre-Treatment Plant (system-2) (2
4 Approved
Clarifiers)
5 Cascade Aerator(system-1) Approved
6 Cascade Aerator-(system-2) Approved
7 Thickener Approved
Inlet Complex for DM (Distribution Chamber,
8 Chamber, Parshall Flume, Stilling Chamber,inlet Approved
channel)
Inlet Complex for PT-1 (Distribution Chamber,
9 Chamber, Parshall Flume, Stilling Chamber,inlet Approved
channel)
Inlet Complex for PT-2 (Distribution Chamber,
10 Chamber, Parshall Flume, Stilling Chamber,inlet Approved
channel)
11 Overall Plant Clarified Water Channel. Approved
12 Thickened Sludge Sump Approved
13 Sludge Sump & pump Foundations Approved
14 Thickener Supernated Collection Sump Approved
15 Pump Foundations for Supernatant tank Approved
16 Pump Foundations for Thickend Sludge sump Approved
17 Pipe Pedestals & sleepers for overall layout Approved
18 Manholes & valve chambers Approved