You are on page 1of 1

Fire Prevention Department

1 2 3 4 5 6 7 8 General Directorate of Civil Defense


Ministry of Interior, State of Qatar

+46.90 +46.90 +46.90 +46.90 +46.90


T.O.P T.O.P T.O.P T.O.P T.O.P
+46.40 +46.40
T.O.P T.O.P

0.85

1.00
+45.90 +45.90
S.S.L S.S.L
UPPER ROOF LEVEL
2.00

1.80
(QCD Officer's Signature)

4.45
+43.05 +43.05
T.O.P OPENING IN BLOCK WALL T.O.P

Application/PS No. Reviewing Engineer's Signature/Date


+41.45
F.F.L
ROOF FLOOR LEVEL
GROOVE IN PLASTER GROOVE IN PLASTER
Date :
N/2022/0003504

G.R.C CONSULTANT'S ENDORSEMENT

3.70
I, ENGR. ROMEO BENID PLASENCIA AN MECHANICAL ENGINEER WITH UPDA/QCD REGISTRATION NO. 1239,
+37.75 BEING THE CONSULTANT, HEREBY CERTIFY THAT THE FIRE SAFETY WORKS SHOWN ON THIS AIR CONDITIONING
G.R.C F.F.L
TENTH FLOOR LEVEL AND MECHANICAL VENTILATION (ACMV) ARE IN ACCORDANCE WITH THE QCD TECHNICAL REQUIREMENTS
GUIDE 2022.

FURTHER, I HEREBY CERTIFY THAT I AM FULLY AWARE ON THE APPROVAL OF FIRE SAFETY ENGINEERING
PLANS AND DO NOT RELIEVE MYSELF OF BEING THE CONSULTANT ON THE RESPONSIBILITY IN CONTINUED

3.70
COMPLIANCE TO THE QCD TECHNICAL REQUIREMENTS GUIDE 2022, APPLICABLE/ACCEPTABLE NFPA CODES,
STANDARDS, PROCEDURES AND PRACTICES IMPLEMENTED BY THE GDCD.
+34.05
F.F.L
NINTH FLOOR LEVEL
PLASTER & PAINT FINISH PLASTER & PAINT FINISH AFFIXED IS MY NAME AND COMPANY STAMP TO ATTEST WITH THE ABOVE UNDERTAKING.

GRC
(SIGNATURE OF CONSULTANT)

3.70
ENGR. ROMEO BENID PLASENCIA
P. O. BOX 2118 , DOHA QATAR.
TEL. 44443445 FAX. 44443224

+30.35
F.F.L
EIGHTS FLOOR LEVEL
UPDA Reg. No./Grade : 1239/A Qatar ID No : 26860805861

G.R.C
Validity : 09/03/2025 Validity : 23/07/2023

3.70
+26.65

PLASTER & PAINT FINISH PLASTER & PAINT FINISH


SEVENTH FLOOR LEVEL
F.F.L
DEVELOPMENTCONSULTINGENGINEERINGCO.
QATARIPRIVATESHAREHOLDINGCOMPANY
DESIGN-SUPERVISION-PROJECTMANAGEMENT

3.70
G.R.C

46.90
+22.95
F.F.L
SIXTH FLOOR LEVEL

3.70
+19.25
F.F.L
FIFTH FLOOR LEVEL
GRC (Head Offices Signature)

UPDA Reg. No./Grade : 285/A Qatar ID No : 25782802368

3.70
G.R.C

Validity : 15/05/2023 Validity : 19/08/2022


+15.55
F.F.L
FOURTH FLOOR LEVEL
PLASTER & PAINT FINISH PLASTER & PAINT FINISH
CLIENT/OWNER

3.70
G.R.C

+11.85
F.F.L
THIRD FLOOR LEVEL

MR IBRAHIM HASSAN AL-ASMAKH

3.70
+8.15
F.F.L
SECOND FLOOR LEVEL

3.70
G.R.C

+4.45
F.F.L
PLASTER & PAINT FINISH PLASTER & PAINT FINISH FIRST FLOOR LEVEL
PROJECT TITLE

4.00
-0.35 +0.45
S.S.L F.F.L
GROUND FLOOR LEVEL ±0.00
-0.10

0.45
S.S.L F.G.L
10% SLOPE

PROPOSED(3B+G+10) RESIDENTIAL
APARTMENT BUILDING

4.05
20% S
2.50

SUB STATION
3.65

LOPE

3.90
3.80

3.80

(MV ROOM)

BASEMENT-1
-3.70
-3.90 -3.90 S.S.L -3.90
S.S.L 10% SLOPE 10% SLOPE S.S.L S.S.L
FIRST BASEMENT FLOOR LEVEL
2.50

20% S

11.10
LOPE
3.80
3.60

3.60

3.60
BASEMENT-2

-7.50 -7.50 -7.50


Location : MUSHAIREB Pin No. : 13230013
S.S.L 10% SLOPE 10% SLOPE S.S.L S.S.L
SECOND BASEMENT FLOOR LEVEL
3.23

Total Area : Street : Plot No. :


DOMESTIC PUMP
20% S
LOPE
DRAWING TITLE/SHEET CONTENT
3.60

3.60
MAIN DOMESTIC WATER TANK
3.60

-11.10 -11.10 -11.10


S.S.L 10% SLOPE S.S.L S.S.L
THIRD BASEMENT FLOOR LEVEL
SECTION C-C

01 SECTION C-C 2.50 15.50 2.50


SCALE 1:150 20.50 Revision : 01 SHEET NO : 16/22 DRWG. NO.

Date : 28/08/2022 SCALE : 1:100 ACMV-16

You might also like