Professional Documents
Culture Documents
1. An object is moving along a straight line path from P to Q under the action of a force
F (4iˆ 3jˆ 2k)
ˆ N. If the co-ordinate of P & Q in metres are (3, 2, 1) & (2, 1, 4)
respectively. Then the work done by the force is :
(A) - 15 J (B) + 15 J (C) 1015 J (D) (4iˆ 3jˆ 2k)
ˆ
2. A bucket tied to a string is lowered at a constant acceleration of g/4. If the mass of the
bucket is M and is lowered by a distance d, the work done by the string will be
(assume the string to be massless)
(A) 1/4 Mg d (B) -3/4 Mgd (C) - 4/3Mgd (D) 4/3 Mgd
3. Starting at rest, a 5 kg object is acted upon by only one force as indicated
in figure. Find the total work done by the force.
(a) Find the work done by frictional force on upper block and on the lower block in
t = 2sec.
(b) Is the magnitude of work done by frictional force on upper and lower block same?
Head Office : Plot No. 46, In front of Skyline Apartments, Corner Building, Rajeev Gandhi Nagar, Kota (Raj.) Pin Code : 324005
WEP Physics
JEE Main and Advance
(c) Is the work done by frictional force on upper block converted to heat or
mechanical energy or both?
Head Office : Plot No. 46, In front of Skyline Apartments, Corner Building, Rajeev Gandhi Nagar, Kota (Raj.) Pin Code : 324005