No. Item Description Quantity Unit Unit Price, Php Amount, Php
SINGLE ATTACHED
i. CONCRETING/MASONRY WORKS/REINFORCEMENTS
RC Footings (3000 PSI) 1.4 m³
• Cement 11 bgs 220.00 2,420.00
• Sand 1 m³ 500.00 500.00
• Gravel 3/4" 11 m³ 1,200.00 13,200.00
• 16 mmø deformed bar (6 meter length) 10 pcs 380.00 3,800.00
• 10 mmø deformed bar (6 meter length) 10 pcs 250.00 2,500.00
• GI Tie Wire # 16 3 kgs 85.00 255.00
End Flashing
• Pre-painted Gutter, GA 24(0.701mm) x 2.44m,l6m 4 pcs 840.00 3,360.00
• blind rivet 2 box 200.00 400.00
• touch-up paint 2 cans 250.00 500.00
• paint brush 2 pcs 25.00 50.00
Touch-up Painting
• touch-up paint 2 cans 250.00 500.00
• paint brush 2 pcs 25.00 50.00
Sub Total = 19,910.00
v. FINISHING WORKS
Total Ceiling Area 24.75 sqm
Ceiling Board
• hardiflex, 4.5mm thick 8 pcs 680 5440.00
• double metal furring pcs/6 m 276.00
13 3,588.00
• carrying channel pcs/3m 138.00
2 276.00
• blind revit 3 box 200.00 600.00
• wall angle pcs/3m 138.00
14 1,932.00
Sub Total = 11836.00
x. PLUMBING WORKS
Fixtures
• Water closet with fittings and complete accessories 1 sets 7500.00 7500.00
• Floor Drain 4x4", brass 1 pcs 350.00 350.00
Sub Total = 7850.00
Masonry Works
• 4" thick CHB 400 pcs 13.00 5200.00
• Portland cement 6 bags 230.00 1380.00
• fine sand 1 cu m 650.00 650.00
• crushed gravel 1 cu m 750.00 750.00
• 10mm Φ RSB deformed bar x 6m 32 pcs 110.00 3520.00
Sub Total = 11500.00
Plastering Works
• Portland cement 4 bags 230.00 920.00
• fine sand 1 cu m 650.00 650.00
• sahara waterproofing compound 4 packs 30.00 120.00
Sub Total = 1690.00
xi. ELECTRICAL WORKS
Power Layout
• panel board 1 set 12,500.00 12,500.00
• 14mm^2 THHN electrical wire 25 mts 250.00 6,250.00
Sub Total = 18,750.00
Lighting Outlet
• Philip LED Bulb 24 watts 8 set 850.00 6800.00
Sub Total = 6800.00
Convenience Outlet
• CO assembly, Duplex Receptacle 8 sets 350.00 2,800.00
• CO assembly, GCFI 10 sets 550.00 5,500.00
Sub Total = 8,300.00
Switches
• switch assembly, 1gang 5 sets 175.00 875.00
• switch assembly, 2gang 2 sets 200.00 400.00
• three-way switch assembly 1 sets 450.00 450.00
• four-way switch assembly 1 sets 600.00 600.00
Sub Total = 1725.00
Distribution Wires
• THHN electrical wire, 2.00mm² 1 boxes 2,200.00 2200.00
• THHN electrical wire, 3.50mm² 2 boxes 3,200.00 6400.00
Sub Total = 8600.00
Electrical Hardwares
• 20ØmmPVC 12 pcs 60.00 720.00
• electrical tape, big 10 pcs 30.00 300.00
• solvent cement, 400cc 1 cans 180.00 180.00
Sub Total = 1200.00
ii. FORMWORKS
• Plywood 4.00 pcs 1,200.00 4,800.00
• Consumables (assorted nails, etc.) 3.50 kgs 9,000.00 31,500.00
• Lumber for formworks ( 2"x 3" and 2"x 2") 95.00 bdft 65.00 6,175.00
• Scaffoldings or Rental 1.00 lot 75,000.00 75,000.00
Sub Total = 42,475.00
iii. ROOFING SYSTEM
Area of Roof Structure 45.5 sqm
Truss Assembly
• 50mm X100mm x 7.9mm tubolar L= 6m 6 pcs 300.00 1800.00
• 100mm x 50mm x 12.7mm c-purlins L= 6m 16 pcs 410.00 6560.00
• 250x250x16mm MS plate 5 pcs 285.00 1425.00
• welding rod 1 box 200.00 200.00
Sub Total = 9985.00
End Flashing
• Pre-painted Gutter, GA 24(0.701mm) x 2.44m,l6m 4 pcs 840.00 3,360.00
• blind rivet 2 box 200.00 400.00
• touch-up paint 2 cans 250.00 500.00
• paint brush 2 pcs 25.00 50.00
Touch-up Painting
• touch-up paint 2 cans 250.00 500.00
• paint brush 2 pc 25.00 50.00
Sub Total = 19,910.00
v. FINISHING WORKS
Total Ceiling Area 27.5 sqm
Ceiling Board
• hardiflex, 4.5mm thick 10 pcs 680 6800.00
• double metal furring 15 pcs/6 m 276.00 4,140.00
• carrying channel 4 pcs/3m 138.00 552.00
• blind revit 5 box 200.00 1,000.00
• wall angle 16 pcs/3m 138.00 2,208.00
Sub Total = 14700.00
x. PLUMBING WORKS
Fixtures
• Water closet with fittings and complete accessories 1 sets 7500.00 7500.00
• Floor Drain 4x4", brass 1 pcs 350.00 350.00
Sub Total = 7850.00
Plastering Works
• Portland cement 4 bags 230.00 920.00
• fine sand 1 cu m 650.00 650.00
• sahara waterproofing compound 4 packs 30.00 120.00
Sub Total = 1690.00
Lighting Outlet
• Philip LED Bulb 24 watts 8 set 850.00 6800.00
Sub Total = 6800.00
Convenience Outlet
• CO assembly, Duplex Receptacle 8 sets 350.00 2,800.00
• CO assembly, GCFI 10 sets 550.00 5,500.00
Sub Total = 8,300.00
Switches
• switch assembly, 1gang 5 sets 175.00 875.00
• switch assembly, 2gang 2 sets 200.00 400.00
• three-way switch assembly 1 sets 450.00 450.00
• four-way switch assembly 1 sets 600.00 600.00
Sub Total = 1725.00
Distribution Wires
• THHN electrical wire, 2.00mm² 1 boxes 2,200.00 2200.00
• THHN electrical wire, 3.50mm² 2 boxes 3,200.00 6400.00
Sub Total = 8600.00
Electrical Hardwares
• 20ØmmPVC 12 pcs 60.00 720.00
• electrical tape, big 10 pcs 30.00 300.00
• solvent cement, 400cc 1 cans 180.00 180.00
Sub Total = 1200.00
End Flashing
• Pre-painted Gutter, GA 24(0.701mm) x 2.44m,l6m 2 pcs 840.00 1680.00
• blind rivet 1 box 200.00 200.00
• Pre-painted Gutter, GA 24(0.701mm) x 2.44m,l6m 2 pcs 840.00 1680.00
• blind rivet 1 box 200.00 200.00
Touch-up Painting
• touch-up paint 2 cans 250.00 500.00
• paint brush 2 pc 25.00 50.00
Sub Total = 19,360.00
v. FINISHING WORKS
Total Ceiling Area 30.60 sqm
Ceiling Board
• hardiflex, 4.5mm thick 12 pcs 680 8160.00
• double metal furring pcs/6 m 276.00
17 4,692.00
• carrying channel 6 pcs/3m 138.00 828.00
• blind revit 7 box 200.00 1,400.00
• wall angle 18 pcs/3m 138.00 2,484.00
Sub Total = 17564.00
x. PLUMBING WORKS
Fixtures
• Water closet with fittings and complete accessories 1 sets 7,500.00 7,500.00
• Floor Drain 4x4", brass 1 pcs 350.00 350
Sub Total = 7850.00
Masonry Works
• 4" thick CHB 400 pcs 13.00 5200.00
• Portland cement 6 bags 230.00 1380.00
• fine sand 1 cu m 650.00 650.00
• crushed gravel 1 cu m 750.00 750.00
• 10mm Φ RSB deformed bar x 6m 32 pcs 110.00 3520.00
Sub Total = 11500.00
Plastering Works
• Portland cement 4 bags 230.00 920.00
• fine sand 1 cu m 650.00 650.00
• sahara waterproofing compound 4 packs 30.00 120.00
Sub Total = 1690.00
Lighting Outlet
• Philip LED Bulb 24 watts 8 set 850.00 6800.00
Sub Total = 6800.00
Convenience Outlet
• CO assembly, Duplex Receptacle 8 sets 350.00 2,800.00
• CO assembly, GCFI 10 sets 550.00 5,500.00
Sub Total = 8,300.00
Switches
• switch assembly, 1gang 5 sets 175.00 875.00
• switch assembly, 2gang 2 sets 200.00 400.00
• three-way switch assembly 1 sets 450.00 450.00
• four-way switch assembly 1 sets 600.00 600.00
Sub Total = 1725.00
Distribution Wires
• THHN electrical wire, 2.00mm² 1 boxes 2,200.00 2200.00
• THHN electrical wire, 3.50mm² 2 boxes 3,200.00 6400.00
Sub Total = 8600.00
Electrical Hardwares
• 20ØmmPVC 12 pcs 60.00 720.00
• electrical tape, big 10 pcs 30.00 300.00
• solvent cement, 400cc 1 cans 180.00 180.00
Sub Total = 1200.00
x. PLUMBING WORKS
Fixtures
• Water closet with fittings and complete accessories 1 sets 7500.00 7500.00
• Floor Drain 4x4", brass 1 pcs 350.00 350.00
Sub Total = 7850.00
Masonry Works
• 4" thick CHB 400 pcs 13.00 5200.00
• Portland cement 6 bags 230.00 1380.00
• fine sand 1 cu m 650.00 650.00
• crushed gravel 1 cu m 750.00 750.00
• 10mm Φ RSB deformed bar x 6m 32 pcs 110.00 3520.00
Sub Total = 11500.00
Plastering Works
• Portland cement 4 bags 230.00 920.00
• fine sand 1 cu m 650.00 650.00
• sahara waterproofing compound 4 packs 30.00 120.00
Sub Total = 1690.00
Lighting Outlet
• Philip LED Bulb 24 watts 9 set 850.00 7650.00
Sub Total = 7650.00
Convenience Outlet
• CO assembly, Duplex Receptacle 8 sets 350.00 2,800.00
• CO assembly, GCFI 10 sets 550.00 5,500.00
Sub Total = 8,300.00
Switches
• switch assembly, 1gang 6 sets 175.00 1050.00
• switch assembly, 2gang 2 sets 400.00 400.00
• three-way switch assembly 1 sets 450.00 450.00
• four-way switch assembly 1 sets 600.00 600.00
Sub Total = 1900.00
Distribution Wires
• THHN electrical wire, 2.00mm² 1 boxes 2,200.00 2200.00
• THHN electrical wire, 3.50mm² 2 boxes 3,200.00 6400.00
Sub Total = 8600.00
Electrical Hardwares
• 20ØmmPVC 12 pcs 60.00 720.00
• electrical tape, big 10 pcs 30.00 300.00
• solvent cement, 400cc 1 cans 180.00 180.00
Sub Total = 1200.00