DINAS BINA MARGA, DINAS PENGELOLAAN SUMBER DAYA AIR & PERTAMBANGAN
DAN DINAS CIPTA KARYA & TATA RUANG
KABUPATEN CIREBON
TAHUN ANGGARAN 2014
II. PASIR
1 Pasir beton m3 150,000.00
2 Pasir aspal m3 150,000.00
3 Pasir pasang m3 143,000.00
4 Pasir urug m3 110,000.00
5 Sirtu m3 110,000.00
6 Sirtu tersaring m3 115,000.00
7 Tanah urug pilhan m3 125,000.00
8 Tanah urug biasa m3 100,000.00
III. BESI / PIPA / KAWAT
1 Besi WF/Besi Profil kg 11,250.00
2 Besi strip kg 11,250.00
3 Besi beton kg 11,000.00
4 Besi stainless dia. 0,5" m' 38,000.00
5 Besi stainless dia. 1" m' 60,000.00
6 Besi stainless dia. 1,5" m' 75,000.00
7 Besi stainless dia. 2" m' 80,000.00
8 Besi stainless dia. 2,5" m' 125,000.00
9 Besi stainless dia. 3" m' 152,000.00
10 Besi galvanis dia. 0.5" m' 25,000.00
11 Besi galvanis dia. 1" m' 27,000.00
12 Besi galvanis dia. 1.5" m' 45,000.00
13 Besi galvanis dia. 2" m' 57,000.00
14 Besi galvanis dia. 2.5" m' 80,500.00
15 Besi galvanis dia. 3" m' 96,000.00
16 Besi biasa dia. 2" btg 250,000.00
17 Besi biasa dia. 3" btg 310,000.00
18 Dop besi Ø 3 " bh 60,000.00
19 Kawat beton / Kawat tali kg 18,000.00
20 Kawat bronjong dia. 4 mm kg 20,000.00
21 Kawat galvanis dia. 4 mm kg 20,000.00
22 Kawat galvanis dia. 6 mm kg 24,000.00
23 Kawat duri m' 20,000.00
24 Pipa besi galvanis 2" btg 324,000.00
25 Pipa besi galvanis 3" btg/6m' 600,000.00
26 Pipa PVC Ø 2" S-12,5 ( 8 - 10 bar ) m' 26,300.00
27 Pipa PVC Ø 3" S-12,5 ( 8 - 10 bar ) m' 53,600.00
28 Pipa PVC / paralon 2 inch btg 50,600.00
29 Pipa PVC / paralon 3 inch btg 75,000.00
30 Pipa Reducer PVC Ø 3"-4" bh 5,800.00
31 Pipa Knee/bend PVC Ø 3" bh 5,800.00
32 Plat baja tebal 5 mm - 20 mm kg 12,650.00
33 Ram kawat harmonika m2 23,200.00
34 Socket besi O 3 " bh 45,000.00
NO URAIAN BAHAN/MATERIAL SAT. HARGA KET
KESEPAKATAN
V. ASPAL
1 Aspal kemasan kg 10,785.00
2 Aspal curah kg 9,930.00
VI. MINYAK
1 Premium liter 4,500.00
2 Premium (non subsidi) liter 9,950.00
3 Solar liter 4,500.00
4 Solar (non subsidi) liter 8,500.00
5 Minyak tanah liter 9,000.00
6 Olie SAE 20, 40, 60, 80 dan 120 liter 35,000.00
7 Pelumas bekisting liter 10,000.00
8 Stempet kg 25,000.00
VII.CETAKAN
1 Bata merah bh 600.00
2 Bata berongga bh 2,250.00
3 Genteng glazuur turbo ex Jatiwangi bh 2,500.00
4 Genteng nok/bubung diglazuur ex Jatiwangi bh 3,500.00
5 Genteng nok/bubung press mesin ex Jatiwangi bh 2,200.00
6 Genteng nok/bubung press tangan ex Jatiwangi bh 2,000.00
7 Genteng nok/bubung morando diglazuur bh 4,500.00
8 Genteng nok/bubung morando bh 4,000.00
9 Genteng press diglazuur ex Jatiwangi bh 2,000.00
10 Genteng press mesin ex Jatiwangi bh 1,900.00
11 Genteng press tangan ex Jatiwangi bh 1,400.00
12 Genteng Type Viktoria bh 9,000.00
13 Genteng nok/bubung Type Viktoria bh 12,500.00
14 Genteng nok/bubung ujung Type Viktoria bh 20,000.00
15 Genteng nok/bubung ujung pertigaan Type Viktoria bh 25,000.00
16 Genteng beton bh 5,000.00
17 Genteng metal m2 75,000.00
18 Gorong-gorong buis beton dia. 100 cm bh/0,5 m' 120,000.00
19 Gorong-gorong buis beton dia. 80 cm bh/0,5 m' 100,000.00
20 Gorong-gorong buis beton dia. 60 cm bh/m' 70,000.00
21 Gorong-gorong buis beton dia. 40 cm bh/m' 60,000.00
22 Gorong-gorong buis beton dia. 30 cm bh/m' 50,000.00
23 Gorong-gorong buis beton dia. 20 cm bh/m' 40,000.00
24 Gravel dia. 60 cm bh 38,000.00
25 Gravel dia. 40 cm bh 35,000.00
26 Gravel dia. 20 cm bh 20,000.00
27 Nok steel gelombang 1050 x 5 mm m' 23,000.00
28 Nok steel gelombang 920 x 5 mm m' 22,500.00
29 Nok / bubung genteng beton bh 6,000.00
30 Paving Block K.175 Segi Enam bh 1,500.00
31 Paving Block K.175 Persegi bh 2,000.00
32 Paving Block K.125 Segi Enam bh 1,250.00
NO URAIAN BAHAN/MATERIAL SAT. HARGA KET
KESEPAKATAN
33 Paving Block K.125 Persegi bh 1,600.00
34 Digital printing m2 25,000.00
NO URAIAN BAHAN/MATERIAL SAT. HARGA KET
KESEPAKATAN
VIII. KAYU
1 Bambu Ø6 - Ø8 / 6 m btg 14,000.00
2 Kayu deplank 8/20 - 4 m (Jati Jateng) m3 8,000,000.00
3 Kayu deplank 8/20 - 4 m (Balau) m3 7,500,000.00
4 Kayu deplank 8/20 - 4 m (Borneo) m3 4,500,000.00
5 Kayu dolken O 8 - 10 /4 m btg 57,000.00
6 Kayu dolken O 12 - 15 /4 m btg 60,000.00
7 Kayu dolken O 5 /3 m btg 35,000.00
8 Kayu hutan/kayu perancah acuan m3 4,255,000.00
9 Kayu kamper m3 8,200,000.00
10 Kayu kaso 5/7 meranti m3 5,000,000.00
11 Kayu kaso 5/7 meranti btg 79,000.00
12 Kayu kruing m3 7,274,000.00
13 Kayu lanan m3 6,546,000.00
14 Kayu meranti m3 5,000,000.00
15 Kayu jati Jabar m3 7,500,000.00
16 Kayu Balau m3 7,500,000.00
17 Kayu Borneo m3 4,500,000.00
18 Kayu bakar m3 90,000.00
19 Reng kayu borneo ukuran 2/3 cm btg 54,000.00
20 Tali Ijuk kg 9,000.00
B. UPAH
1 Mandor /hari 70,000.00
2 Kepala tukang /hari 65,000.00
3 Tukang kayu / besi /hari 60,000.00
4 Tukang batu /hari 60,000.00
5 Pembantu tukang /hari 50,000.00
6 Operator terlatih /hari 60,000.00
7 Operator kurang terlatih /hari 55,000.00
8 Pembantu operator /hari 50,000.00
9 Supir truk /hari 55,000.00
10 Pembantu supir /hari 50,000.00
11 Buruh lapangan terlatih /hari 55,000.00
12 Buruh lapangan kurang terlatih /hari 50,000.00
13 Buruh lapangan tak terlatih / pekerja /hari 50,000.00
II. PASIR
1 Pasir beton m3 178,000.00
2 Pasir aspal m3 150,000.00
3 Pasir pasang m3 145,000.00
4 Pasir urug m3 140,000.00
5 Sirtu m3 140,000.00
6 Sirtu tersaring m3 145,000.00
7 Tanah urug pilhan m3 125,000.00
8 Tanah urug biasa m3 100,000.00
III. BESI / PIPA / KAWAT
1 Besi WF/Besi Profil kg 12,500.00
2 Besi strip kg 12,500.00
3 Besi beton kg 11,000.00
4 Besi stainless dia. 0,5" m' 38,000.00
5 Besi stainless dia. 1" m' 60,000.00
6 Besi stainless dia. 1,5" m' 75,000.00
7 Besi stainless dia. 2" m' 80,000.00
8 Besi stainless dia. 2,5" m' 125,000.00
9 Besi stainless dia. 3" m' 152,000.00
10 Besi galvanis dia. 0.5" m' 25,000.00
11 Besi galvanis dia. 1" m' 27,000.00
12 Besi galvanis dia. 1.5" m' 45,000.00
13 Besi galvanis dia. 2" m' 57,000.00
14 Besi galvanis dia. 2.5" m' 80,500.00
15 Besi galvanis dia. 3" m' 96,000.00
16 Besi biasa dia. 2" btg 250,000.00
17 Besi biasa dia. 3" btg 310,000.00
18 Dop besi Ø 3 " bh 60,000.00
19 Kawat beton / Kawat tali kg 18,000.00
20 Kawat bronjong dia. 4 mm kg 20,000.00
21 Kawat galvanis dia. 4 mm kg 20,000.00
22 Kawat galvanis dia. 6 mm kg 24,000.00
23 Kawat duri m' 14,000.00
24 Pipa besi galvanis 2" btg 324,000.00
25 Pipa besi galvanis 3" btg/6m' 500,000.00
26 Pipa PVC Ø 2" S-12,5 ( 8 - 10 bar ) m' 26,300.00
27 Pipa PVC Ø 3" S-12,5 ( 8 - 10 bar ) m' 53,600.00
28 Pipa PVC / paralon 2 inch btg 65,000.00
29 Pipa PVC / paralon 3 inch btg 90,000.00
30 Pipa Reducer PVC Ø 3"-4" bh 6,000.00
NO URAIAN BAHAN/MATERIAL SAT. HARGA KET
KESEPAKATAN
31 Pipa Knee/bend PVC Ø 3" bh 6,000.00
32 Plat baja tebal 5 mm - 20 mm kg 12,650.00
33 Ram kawat harmonika m2 23,000.00
34 Socket besi O 3 " bh 45,000.00
35 Toren Penguin 250 lt bh 525,000.00
36 Toren 500 lt bh 860,000.00
37 Toren 1000 lt bh 1,450,000.00
V. ASPAL
1 Aspal kemasan kg 11,300.00
2 Aspal curah kg 11,100.00
VI. MINYAK
1 Premium liter 6,500.00
2 Premium (non subsidi) liter 9,600.00
3 Solar liter 6,500.00
4 Solar (non subsidi) liter 10,400.00
5 Minyak tanah liter 10,300.00
6 Olie SAE 20, 40, 60, 80 dan 120 liter 35,000.00
7 Pelumas bekisting liter 10,000.00
8 Stempet kg 25,000.00
NO URAIAN BAHAN/MATERIAL SAT. HARGA KET
KESEPAKATAN
VII.CETAKAN
1 Bata merah bh 650.00
2 Bata berongga bh 2,400.00
3 Batako bh 3,200.00
4 Genteng glazuur turbo ex Jatiwangi bh 2,500.00
5 Genteng nok/bubung diglazuur ex Jatiwangi bh 3,500.00
6 Genteng nok/bubung press mesin ex Jatiwangi bh 2,200.00
7 Genteng nok/bubung press tangan ex Jatiwangi bh 2,000.00
8 Genteng nok/bubung morando diglazuur bh 4,500.00
9 Genteng morando bh 3,500.00
10 Genteng nok/bubung morando bh 4,000.00
11 Genteng press diglazuur ex Jatiwangi bh 2,500.00
12 Genteng press mesin ex Jatiwangi bh 1,900.00
13 Genteng press tangan ex Jatiwangi bh 1,400.00
14 Genteng Type Viktoria bh 9,000.00
15 Genteng nok/bubung Type Viktoria bh 12,500.00
16 Genteng nok/bubung ujung Type Viktoria bh 20,000.00
17 Genteng nok/bubung ujung pertigaan Type Viktoria bh 25,000.00
18 Genteng beton bh 5,000.00
19 Genteng metal 70 x 80 cm lbr 48,000.00
20 Gorong-gorong buis beton dia. 100 cm bh/0,5 m' 120,000.00
21 Gorong-gorong buis beton dia. 80 cm bh/0,5 m' 100,000.00
22 Gorong-gorong buis beton dia. 60 cm bh/m' 80,000.00
23 Gorong-gorong buis beton dia. 40 cm bh/m' 60,000.00
24 Gorong-gorong buis beton dia. 30 cm bh/m' 50,000.00
25 Gorong-gorong buis beton dia. 20 cm bh/m' 40,000.00
26 Gravel dia. 60 cm bh 40,000.00
27 Gravel dia. 40 cm bh 35,000.00
28 Gravel dia. 20 cm bh 25,000.00
29 Nok steel gelombang 1050 x 5 mm m' 29,000.00
30 Nok steel gelombang 920 x 5 mm m' 22,500.00
31 Nok / bubung genteng beton bh 6,000.00
32 Paving Block K.175 Segi Enam Netural tebal 8 cm m2 62,000.00
33 Paving Block K.175 Segi Enam motif tebal 8 cm m2 64,000.00
34 Paving Block K.175 Segi Enam warna tebal 8 cm m2 69,000.00
35 Paving Block K.175 Segi Enam Netural tebal 7 cm m2 55,000.00
36 Paving Block K.175 Segi Enam motif tebal 7 cm m2 58,000.00
37 Paving Block K.175 Segi Enam warna tebal 7 cm m2 64,000.00
38 Paving Block K.175 Segi Enam Netural tebal 6 cm m2 50,000.00
39 Paving Block K.175 Segi Enam motif tebal 6 cm m2 53,000.00
40 Paving Block K.175 Segi Enam warna tebal 6 cm m2 57,000.00
41 Paving Block K.125 Segi Enam Netural tebal 6 cm bh 43,000.00
42 Paving Block K.125 Segi Enam warna tebal 6 cm bh 47,000.00
43 Digital printing m2 25,000.00
VIII. KAYU
1 Bambu Ø6 - Ø8 / 6 m btg 17,000.00
2 Kayu deplank 8/20 - 4 m (Jati Jateng) m3 8,000,000.00
3 Kayu deplank 8/20 - 4 m (Balau) m3 9,500,000.00
4 Kayu deplank 8/20 - 4 m (Borneo) m3 5,000,000.00
5 Kayu dolken O 8 - 10 /4 m btg 60,000.00
6 Kayu dolken O 12 - 15 /4 m btg 68,000.00
7 Kayu dolken O 5 /3 m btg 12,500.00
8 Kayu hutan/kayu perancah acuan m3 4,255,000.00
9 Kayu kamper m3 8,200,000.00
10 Kayu kaso 5/7 meranti m3 6,000,000.00
11 Kayu kaso 5/7 meranti btg 79,000.00
12 Kayu kruing m3 7,274,000.00
13 Kayu lanan m3 6,546,000.00
14 Kayu meranti m3 6,000,000.00
15 Kayu jati Jabar m3 8,200,000.00
16 Kayu Balau m3 9,500,000.00
17 Kayu Borneo m3 5,000,000.00
18 Kayu bakar m3 90,000.00
19 Reng kayu borneo ukuran 2/3 cm btg 54,000.00
20 Tali Ijuk kg 9,000.00
NO URAIAN BAHAN/MATERIAL SAT. HARGA KET
KESEPAKATAN
B. UPAH
1 Mandor /hari 85,000.00
2 Kepala tukang /hari 75,000.00
3 Tukang kayu / besi /hari 70,000.00
4 Tukang batu /hari 70,000.00
5 Pembantu tukang /hari 55,000.00
6 Operator terlatih /hari 100,000.00
7 Operator kurang terlatih /hari 55,000.00
8 Pembantu operator /hari 50,000.00
9 Supir truk /hari 55,000.00
10 Pembantu supir /hari 50,000.00
11 Mekanik /hari 55,000.00
12 Pembantu mekanik /hari 50,000.00
13 Buruh lapangan terlatih /hari 55,000.00
14 Buruh lapangan kurang terlatih /hari 50,000.00
15 Buruh lapangan tak terlatih / pekerja /hari 55,000.00
DINAS BINA MARGA DINAS CIPTA KARYA DAN TATA RUANG DINAS PENGELOLAAN SUMBER DAYA AIR
KABUPATEN CIREBON KABUPATEN CIREBON DAN PERTAMBANGAN KAB.CIREBON
Kepala Seksi Perencanaan Teknik
Kepala Seksi Desain Teknik Kepala Seksi Bangunan Gedung
Jalan dan Jembatan
Kepala Bidang Bina Teknik Kepala Bidang Bangunan Gedung, Perumahan dan Kepala Bidang Bina Teknik
Permukiman
Kepala Dinas Bina Marga Kepala Dinas Cipta Karya dan Tata Ruang Kepala Dinas Pengelolaan Sumber Daya Air
Kabupaten Cirebon Kabupaten Cirebon dan Pertambangan Kabupaten Cirebon
Ir. AVIP SUHERDIAN, MT Ir. H. ARIEF BUDI PRAYITNO DEDI NURUL SUDJUDI A
NIP. 19640827 199303 1 006 NIP. 19620428 199003 1 006 NIP. 19590721 198303 1 009
DAFTAR KESEPAKATAN HARGA SATUAN BAHAN / MATERIAL DAN UPAH
DINAS BINA MARGA, DINAS PENGELOLAAN SUMBER DAYA AIR & PERTAMBANGAN
DAN DINAS CIPTA KARYA & TATA RUANG
KABUPATEN CIREBON
HARGA TERTINGGI TAHUN ANGGARAN 2015
kesimpulan
NO URAIAN BAHAN/MATERIAL SAT. HARGA TERTINGGI 2015 HARGA TERTINGGI 2015 harga survay
HARGA DASAR + 10 % tertinggi
A. BAHAN :
I. BATU
1 Abu Batu m3 185,850.00 204,400.00
2 Atras ( tanah urug ) m3 125,000.00 137,500.00
3 Base course A m3
4 Base course B m3
5 Batu apung kg 4,300.00 4,700.00
6 Batu belah 10/15 cm m3 175,000.00 192,500.00
7 Batu belah 15/20 cm (Krakal) m3 175,000.00 192,500.00
8 Batu pecah mesin 0.5-1 cm m3 200,000.00 220,000.00
9 Batu pecah mesin 1-2 cm m3 200,000.00 220,000.00
10 Batu pecah mesin 2-3 cm m3 200,000.00 220,000.00
11 Batu pecah mesin 3-5 cm 182,000.00 200,200.00
12 Batu tempel Palimanan 10 X 20 bh 1,500.00 1,650.00
13 Batu tempel kapur tekstur tidak rata bh 2,000.00 2,200.00
14 Chipping m3 245,300.00 269,800.00
15 Filler kg 100.00 100.00
16 Kapur bakar m3 70,000.00 77,000.00
17 Kapur Sirih kg 2,000.00 2,200.00
18 Kerikil m3 65,000.00 71,500.00
II. PASIR
1 Pasir beton m3 179,000.00 196,900.00
2 Pasir aspal m3 175,000.00 192,500.00
3 Pasir pasang m3 162,000.00 178,200.00
4 Pasir urug m3 150,000.00 165,000.00
5 Sirtu m3 145,000.00 159,500.00
6 Sirtu tersaring m3 147,000.00 161,700.00
7 Tanah urug pilhan m3 125,000.00 137,500.00
8 Tanah urug biasa m3 100,000.00 110,000.00
Tanah merah m3 112,500.00 123,750.00
III. BESI / PIPA / KAWAT
1 Besi WF/Besi Profil kg 13,750.00 15,125.00
2 Besi strip kg 13,750.00 15,125.00
3 Besi beton kg 13,000.00 14,300.00
4 Besi stainless dia. 0,5" m' 38,000.00 41,800.00
5 Besi stainless dia. 1" m' 60,000.00 66,000.00
6 Besi stainless dia. 1,5" m' 75,000.00 82,500.00
7 Besi stainless dia. 2" m' 80,000.00 88,000.00
8 Besi stainless dia. 2,5" m' 125,000.00 137,500.00
9 Besi stainless dia. 3" m' 152,000.00 167,200.00
10 Besi galvanis dia. 0.5" m' 25,000.00 27,500.00
11 Besi galvanis dia. 1" m' 27,000.00 29,700.00
12 Besi galvanis dia. 1.5" m' 45,000.00 49,500.00
13 Besi galvanis dia. 2" m' 57,000.00 62,700.00
14 Besi galvanis dia. 2.5" m' 80,500.00 88,550.00
15 Besi galvanis dia. 3" m' 84,000.00 92,400.00
16 Besi biasa dia. 2" btg 250,000.00 275,000.00
17 Besi biasa dia. 3" btg 310,000.00 341,000.00
18 Dop besi Ø 3 " bh 60,000.00 66,000.00
19 Kawat beton / Kawat tali kg 18,000.00 19,800.00
20 Kawat bronjong pabrikan dia. 3 mm (uk 2x1x0.5) unit 388,080.00 426,888.00
21 Kawat bronjong dia. 4 mm kg 20,000.00 22,000.00
22 Kawat galvanis dia. 4 mm kg 20,000.00 22,000.00
23 Kawat galvanis dia. 6 mm kg 24,000.00 26,400.00
24 Kawat duri m' 14,000.00 15,400.00
25 Pipa besi galvanis 2" btg/6m' 324,000.00 356,400.00
26 Pipa besi galvanis 3" btg/6m' 500,000.00 550,000.00
27 Pipa PVC Ø 2" S-12,5 ( 8 - 10 bar ) m' 26,300.00 28,900.00
28 Pipa PVC Ø 3" S-12,5 ( 8 - 10 bar ) m' 53,600.00 58,900.00
29 Pipa PVC / paralon 2 inch btg 69,000.00 75,900.00
30 Pipa PVC / paralon 3 inch btg 90,000.00 99,000.00
31 Pipa Reducer PVC Ø 3"-4" bh 6,000.00 6,600.00
kesimpulan
NO URAIAN BAHAN/MATERIAL SAT. HARGA TERTINGGI 2015 HARGA TERTINGGI 2015 harga survay
HARGA DASAR + 10 % tertinggi
32 Pipa Knee/bend PVC Ø 3" bh 6,000.00 6,600.00
33 Plat baja tebal 5 mm - 20 mm kg 13,000.00 14,300.00
34 Ram kawat harmonika m2 25,000.00 27,500.00
35 Socket besi O 3 " bh 45,000.00 49,500.00
36 Toren Penguin 250 lt bh 525,000.00 577,500.00
37 Toren 500 lt bh 860,000.00 946,000.00
38 Toren 1000 lt bh 1,450,000.00 1,595,000.00
39 Sling Ø 32 mm m 300,000.00 330,000.00
40 Sling Ø 16 mm m 175,000.00 192,500.00
41 Klem sling Ø 32 mm set 250,000.00 275,000.00
42 Warfel / jarum keras Ø 32 mm bh 200,000.00 220,000.00
43 Causen sling Ø 32 mm bh 85,000.00 93,500.00
44 Klem kokat sling Ø 32 mm bh 210,000.00 231,000.00
45 Segel sling Ø 32 mm bh 250,000.00 275,000.00
46 Warfel sling Ø 16 mm bh 135,000.00 148,500.00
47 Segel sling Ø 16 mm bh 140,000.00 154,000.00
48 Klem kokat sling Ø 16 mm bh 35,000.00 38,500.00
49 Causen sling Ø 16 mm bh 50,000.00 55,000.00
50 Jarum keras Ø 16 mm bh 75,000.00 82,500.00
V. ASPAL
1 Aspal kemasan kg 12,100.00 12,100.00
2 Aspal curah kg 11,600.00 11,600.00
3 Aspal Emulsi ltr 10,500.00 10,500.00
VI. MINYAK
1 Premium liter 6,500.00 6,500.00
2 Premium (non subsidi) liter 11,400.00 11,400.00
3 Solar liter 5,500.00 5,500.00
4 Solar (non subsidi) liter 11,900.00 11,900.00
5 Minyak tanah liter 12,500.00 12,500.00
6 Olie SAE 20, 40, 60, 80 dan 120 liter 42,000.00 42,000.00
7 Pelumas bekisting liter 10,000.00 10,000.00
8 Stempet kg 25,000.00 25,000.00
kesimpulan
NO URAIAN BAHAN/MATERIAL SAT. HARGA TERTINGGI 2015 HARGA TERTINGGI 2015 harga survay
HARGA DASAR + 10 % tertinggi
VII.CETAKAN
1 Bata merah bh 800.00 900.00
2 Bata berongga bh 2,400.00 2,650.00
3 Batako bh 3,200.00 3,500.00
4 Genteng glazuur turbo ex Jatiwangi bh 3,500.00 3,850.00
5 Genteng nok/bubung diglazuur ex Jatiwangi bh 4,000.00 4,400.00
6 Genteng nok/bubung press mesin ex Jatiwangi bh 2,500.00 2,750.00
7 Genteng nok/bubung press tangan ex Jatiwangi bh 2,000.00 2,200.00
8 Genteng nok/bubung morando diglazuur bh 4,500.00 4,950.00
9 Genteng morando bh 3,500.00 3,850.00
10 Genteng nok/bubung morando bh 4,000.00 4,400.00
11 Genteng press diglazuur ex Jatiwangi bh 2,500.00 2,750.00
12 Genteng press mesin ex Jatiwangi bh 1,900.00 2,100.00
13 Genteng press tangan ex Jatiwangi bh 1,400.00 1,550.00
14 Genteng Type Viktoria bh 9,000.00 9,900.00
15 Genteng nok/bubung Type Viktoria bh 12,500.00 13,750.00
16 Genteng nok/bubung ujung Type Viktoria bh 20,000.00 22,000.00
17 Genteng nok/bubung ujung pertigaan Type Viktoria bh 25,000.00 27,500.00
18 Genteng beton bh 5,000.00 5,500.00
19 Genteng metal 70 x 80 cm lbr 48,000.00 52,800.00
20 Gorong-gorong buis beton dia. 100 cm bh/0,5 m' 150,000.00 165,000.00
21 Gorong-gorong buis beton dia. 80 cm bh/0,5 m' 130,000.00 143,000.00
22 Gorong-gorong buis beton dia. 60 cm bh/m' 140,000.00 154,000.00
23 Gorong-gorong buis beton dia. 40 cm bh/m' 100,000.00 110,000.00
24 Gorong-gorong buis beton dia. 30 cm bh/m' 80,000.00 88,000.00
25 Gorong-gorong buis beton dia. 20 cm bh/m' 60,000.00 66,000.00
26 Kansten Cetak 82,500.00 90,750.00
27 Gravel dia. 60 cm bh 75,000.00 82,500.00
28 Gravel dia. 40 cm bh 45,000.00 49,500.00
29 Gravel dia. 20 cm bh 35,000.00 38,500.00
30 Nok steel gelombang 1050 x 5 mm m' 29,000.00 31,900.00
31 Nok steel gelombang 920 x 5 mm m' 22,500.00 24,750.00
32 Nok / bubung genteng beton bh 6,000.00 6,600.00
33 Paving Block K.175 Segi Enam Netural tebal 8 cm m2 62,000.00 68,200.00
34 Paving Block K.175 Segi Enam motif tebal 8 cm m2 64,000.00 70,400.00
35 Paving Block K.175 Segi Enam warna tebal 8 cm m2 69,000.00 75,900.00
36 Paving Block K.175 Segi Enam Netural tebal 7 cm m2 55,000.00 60,500.00
37 Paving Block K.175 Segi Enam motif tebal 7 cm m2 58,000.00 63,800.00
38 Paving Block K.175 Segi Enam warna tebal 7 cm m2 64,000.00 70,400.00
39 Paving Block K.175 Segi Enam Netural tebal 6 cm m2 50,000.00 55,000.00
40 Paving Block K.175 Segi Enam motif tebal 6 cm m2 53,000.00 58,300.00
41 Paving Block K.175 Segi Enam warna tebal 6 cm m2 57,000.00 62,700.00
42 Paving Block K.125 Segi Enam Netural tebal 6 cm bh 43,000.00 47,300.00
43 Paving Block K.125 Segi Enam warna tebal 6 cm bh 47,000.00 51,700.00
44 Tiang pancang beton Pratekan m3 4,600,000.00 5,060,000.00
45 Digital printing m2 25,000.00 27,500.00
VIII. KAYU
1 Bambu Ø6 - Ø8 / 6 m btg 17,000.00 18,700.00
2 Kayu deplank 8/20 - 4 m (Jati Jateng) m3 9,800,000.00 10,780,000.00
3 Kayu deplank 8/20 - 4 m (Balau) m3 9,500,000.00 10,450,000.00
4 Kayu deplank 8/20 - 4 m (Borneo) m3 5,000,000.00 5,500,000.00
5 Kayu dolken O 8 - 10 /4 m btg 60,000.00 66,000.00
6 Kayu dolken O 12 - 15 /4 m btg 68,000.00 74,800.00
7 Kayu dolken O 5 /3 m btg 12,500.00 13,750.00
8 Kayu hutan/kayu perancah acuan m3 4,700,000.00 5,170,000.00
9 Kayu kamper m3 8,200,000.00 9,020,000.00
10 Kayu kaso 5/7 meranti m3 6,000,000.00 6,600,000.00
11 Kayu kaso 5/7 meranti btg 79,000.00 86,900.00
12 Kayu kruing m3 7,274,000.00 8,001,400.00
13 Kayu lanan m3 6,546,000.00 7,200,600.00
14 Kayu meranti m3 6,000,000.00 6,600,000.00
15 Kayu jati Jabar m3 8,200,000.00 9,020,000.00
16 Kayu Balau m3 9,500,000.00 10,450,000.00
17 Kayu Borneo m3 5,000,000.00 5,500,000.00
18 Kayu bakar m3 90,000.00 99,000.00
19 Reng kayu borneo ukuran 2/3 cm btg 54,000.00 59,400.00
20 Tali Ijuk kg 9,000.00 9,900.00
kesimpulan
NO URAIAN BAHAN/MATERIAL SAT. HARGA TERTINGGI 2015 HARGA TERTINGGI 2015 harga survay
HARGA DASAR + 10 % tertinggi
B. UPAH
1 Mandor /hari 85,000.00 85,000.00
2 Kepala tukang /hari 75,000.00 75,000.00
3 Tukang kayu / besi /hari 70,000.00 70,000.00
4 Tukang batu /hari 70,000.00 70,000.00
5 Pembantu tukang /hari 55,000.00 55,000.00
6 Operator terlatih /hari 100,000.00 100,000.00
7 Operator kurang terlatih /hari 55,000.00 55,000.00
8 Pembantu operator /hari 50,000.00 50,000.00
9 Supir truk /hari 55,000.00 55,000.00
10 Pembantu supir /hari 50,000.00 50,000.00
11 Mekanik /hari 55,000.00 55,000.00
12 Pembantu mekanik /hari 50,000.00 50,000.00
13 Buruh lapangan terlatih /hari 55,000.00 55,000.00
14 Buruh lapangan kurang terlatih /hari 50,000.00 50,000.00
15 Buruh lapangan tak terlatih / pekerja /hari 55,000.00 55,000.00
Kepala Bidang Bina Teknik Kepala Bidang Bangunan Gedung, Kepala Bidang Bina Teknik
Perumahan dan Permukiman
Ir. TETI MEIRAWATI Ir. FELLYANTO TAMZIL, MM AGUNG GUMILANG, SS., M.si
NIP. 19670502 199703 2 004 NIP. 19620428 199003 1 006 NIP. 19711224 199803 1 004
Kepala Dinas Bina Marga Kepala Dinas Cipta Karya dan Tata Kepala Dinas Pengelolaan Sumber Daya Air
Kabupaten Cirebon Ruang dan Pertambangan Kabupaten Cirebon
Kabupaten Cirebon
A. TENAGA
B. BAHAN
C. PERALATAN
IV - 19
Analisa EI-321.rob
A. TENAGA
B. BAHAN
C. PERALATAN
1. Excavator (E10) Jam 0.0101 #REF! #REF!
2. Dump Truck (E08) Jam 0.6103 #REF! #REF!
3. Motor Grader (E13) Jam 0.0037 0.00 0.00
4 Vibro Roller (E19) Jam 0.0042 #REF! #REF!
5. Water tank truck (E23) Jam 0.0070 #REF! #REF!
6 Alat Bantu Ls 1.0000 0.00 0.00
IV - 20
Analisa EI-322.rob
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) Jam 0.0085 #REF! #REF!
2. Dump Truck (E08) Jam 0.6073 #REF! #REF!
3. Motor Grader (E13) Jam 0.0040 0.00 0.00
3. Tandem (E17) Jam 0.0161 #REF! #REF!
4. Water Tanker (E23) Jam 0.0070 #REF! #REF!
5. Alat Bantu Ls 1.0000 0.00 0.00
IV - 21
Analisa EI-331.rob
A. TENAGA
B. BAHAN
C. PERALATAN
1. Motor Grader (E13) jam 0.0006 0.00 0.00
2. Vibro Roller (E19) jam 0.0005 #REF! #REF!
3 Alat Bantu Ls 1.0000 0.00 0.00
IV - 22
Analisa EI-611a
A. TENAGA
B. BAHAN
C. PERALATAN
IV - 23
Analisa EI-612a
A. TENAGA
B. BAHAN
C. PERALATAN
IV - 24
Analisa EI-621
A. TENAGA
B. BAHAN
C. PERALATAN
IV - 25
Analisa EI-631.rob
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.0096 #REF! #REF!
2. AMP E01 Jam 0.0201 #REF! #REF!
3. Genset E12 Jam 0.0201 #REF! #REF!
4. Dump Truck (3,5 ton) E08 Jam 0.0122 #REF! #REF!
5. Asphalt Finisher E02 Jam 0.0386 - 0.00
6. Tandem Roller E17 Jam 0.0317 #REF! #REF!
7 P. Tyre Roller E18 Jam 0.0109 - 0.00
8 Alat Bantu Ls 1.0000 0.00 0.00
IV - 26
Analisa EI-632.rob
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.0096 #REF! #REF!
2. AMP E01 Jam 0.0201 #REF! #REF!
3. Genset E12 Jam 0.0201 #REF! #REF!
4. Dump Truck E08 Jam 0.0163 #REF! #REF!
5. Asphalt Finisher E02 Jam 0.0290 - 0.00
6. Tandem Roller E17 Jam 0.0238 #REF! #REF!
7 P. Tyre Roller E18 Jam 0.0082 - 0.00
8 Alat Bantu Ls 1.0000 0.00 0.00
IV - 27
Analisa EI-661
A. TENAGA
B. BAHAN
C. PERALATAN
IV - 28
Analisa EI-662
A. TENAGA
B. BAHAN
C. PERALATAN
IV - 29
Analisa EI-814
A. TENAGA
B. BAHAN
C. PERALATAN
IV - 30
Analisa EI-817
A. TENAGA
B. BAHAN
C. PERALATAN
Sumber, 2020
IV - 31
DAFTAR SATUAN ANALISA
DINAS PERUMAHAN KAWASAN PERMUKIMAN DAN PERTANAHAN
KABUPATEN CIREBON
TAHUN ANGGARAN 2017
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
Sumber, 2017
HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME Sat.
SATUAN HARGA
A PEKERJAAN PERSIAPAN
1 Papan Proyek 1.00 Unit 858,063.00 858,063
2 Pek. Laporan & Dokumentasi 1.00 Ls 4,500,000.00 4,500,000
-
B PEKERJAAN TANAH DAN PONDASI -
1 Pek. Galian Tanah Pondasi 83.22 M3 86,130.00 7,167,739
2 Pek. Urugan Tanah Kembali 27.74 M3 205,260.00 5,693,912
3 Pek. Urugan Tanah Peninggian Peil Lantai (t = 10cm) 16.83 M3 512,831.00 8,630,946
-
- Bawah Pondasi 5.93 M3 -
- Bawah Lantai 22.76 M3 -
5 Pek. Pondasi Tapak P1 (100x100x20) -
- Beton K-225 3.20 M3 -
- Pembesian 500.68 Kg -
- Bekisting 19.20 M2 -
6 Pek. Pondasi Batu Belah P2 28.23 M3 -
7 Pek. Sloof Beton (15x30) -
- Beton K-225 3.44 M3 -
- Pembesian 745.23 Kg -
- Bekisting 45.93 M2 -
-
C PEKERJAAN STRUKTUR -
C.1 STRUKTUR BETON -
1 Pek. Kolom Beton K1 (30x30) -
- Beton K-225 8.21 M3 -
- Pembesian 1,185.02 Kg -
- Bekisting 109.44 M2 -
2 Pek. Kolom Praktis KP (15x15) -
- Beton K-175 0.55 M3 -
- Pembesian 105.76 Kg -
- Bekisting 14.70 M2 -
3 Pek. Balok Beton B1, B2 (20X30) -
- Beton K-225 3.42 M3 -
- Pembesian 580.24 Kg -
- Bekisting 45.60 M2 -
4 Pek. Balok Lintel BL (15x15), dan RB (15X15) -
- Beton K-175 1.37 M3 -
- Pembesian 477.72 Kg -
- Bekisting 27.45 M2 -
5 Pek. Lantai Beton T=15cm -
- Beton K-225 23.69 M3 -
- Pembesian Wiremesh M-8 1 Lapis 157.90 Kg -
- Bekisting 7.80 M2 -
6 Pek. Ramp Beton T=10cm -
- Beton K-175 0.35 M3 -
- Pembesian 42.24 Kg -
- Bekisting 0.69 M2 -
7 Pek. Kolom Sopi-sopi (30X30) -
- Beton K-225 1.98 M3 -
- Pembesian 73.37 Kg -
- Bekisting 26.46 M2 -
8 Pek. Balok B4 dan Sopi-sopi (15x20) -
- Beton K-175 1.58 M3 -
- Pembesian 244.92 Kg -
- Bekisting 28.93 M2 -
9 Pek. Plat Beton Topi-topi T=10cm -
- Beton K-225 1.21 M3 -
- Pembesian 200.13 Kg -
- Bekisting 14.14 M2 -
-
C.2 PEKERJAAN ATAP -
Rangka Atap -
1 L 40.40.4 366.65 Kg -
2 2 x L 50.50.5 946.30 Kg -
3 Kuda-kuda 2x C 100.50.20.2,3 32.50 Kg -
4 Gording C 125.50.20.2,3 902.00 Kg -
5 L 50.50,5 dudukan gording 49.80 Kg -
6 Trekstang Ø12 49.65 Kg -
7 Ikatan Angin Ø16 166.60 Kg -
8 Pelat Sambung T=10mm 377.10 Kg -
9 Angkur Ø16x300mm 64.00 Bh -
10 Baut M12 x 30 mm 608.00 Bh -
11 Cat Sincromat Rangka Baja 150.00 M2 -
Penutup Atap -
1 Atap Spandek t=0.35 mm 256.23 M2 -
2 Pasang Alumunium Foil, Glaswool, Roofmesh 160.00 M2 -
3 Lisplank GRC 76.60 M' -
4 Plashing/Ban-banan Atap ( Plester, Aci, Waterprofing) 6.00 M' -
-
D PEKERJAAN PLAFOND -
1 Plafond Gypsum 9 mm + Rangka Hollow 4x4; t=0.35 20.00 M2 #REF! #REF!
2 Plafond Calsiboard 4,5 mm + Rangka 76.00 M2 #REF! #REF!
3 Lis Gypsum 5 cm 52.00 M' #REF! #REF!
-
E PEKERJAAN PASANGAN -
1 Pasangan Dinding Bata 226.39 M2 #REF! #REF!
2 Plester + Acian 452.78 M3 #REF! #REF!
3 Pasangan Rolag Bata 19.80 M' -
4 Pekerjaan Rabat Beton t=5 cm Keliling bang. L=100cm 2.60 M3 #REF! #REF!
5 Pekerjaan Meja Beton Wastafel t=8 cm 0.12 M3 -
6 Pasangan Keramik Lantai 40x40 Polished 21.40 M2 #REF! #REF!
7 Pasangan Keramik Lantai 30x30 Unpolished (rabat) 55.60 M2 #REF! #REF!
8 Pasangan Keramik Lantai 20x20 Unpolished (KM) 3.04 M2 -
9 Pasangan Plint Keramik Lantai 10x40 Polished 21.20 M' -
10 Acian Lantai 168.70 M2 -
11 Pengecatan Lantai (Cat Minyak) 168.70 M2 -
12 Pengecatan Jalur Lantai 28.20 M' -
13 Pasangan Keramik Bak & Meja Washtafel 20x20 Polished 1.77 M2 -
14 Pasangan Keramik Dinding 30x60 Polished 5.49 M2 -
15 Pasangan Keramik Dinding 40x40 Kolom Entrance 5.12 M2 -
16 Pek. Logo & Tulisan 1.00 Ls -
17 Tali Air 27.50 M' -
18 List Profilan Dinding 29.55 M' -
19 Opening Dinding Exhaust Fan Dia. 16" (40,64cm) 5.10 M' -
-
F PEKERJAAN KUSEN PINTU & JENDELA -
1 Kusen/Pintu type P1 1.00 Unit -
2 Kusen/Pintu type P2 2.00 Unit -
3 Kusen/Pintu type P3 (spandrel) 1.00 Unit -
4 Kusen/Jendela type J1 2.00 Unit -
5 Kusen/Jendela type J2 9.00 Unit -
6 Kusen/Jendela type J3 1.00 Unit -
7 Kusen/Jendela type BV 1.00 Unit -
8 Kusen/Jendela type PJ1 1.00 Unit -
9 Tralis Jendela (besi begel) 34.10 M2 -
-
G PEKERJAAN PENGECATAN -
1 Pek. Pengecatan Dinding Interior 226.39 M2 #REF! #REF!
2 Pek. Pengecatan Dinding Exterior 226.39 M2 #REF! #REF!
3 Pek. Pengecatan Plafond 96.00 M2 -
4 Pek. Pengecatan Listplank 22.98 M2 -
-
H PEKERJAAN PLUMBING & SANITAIR -
1 Instalasi Pipa PVC AW 4" 16.00 M' 179,650.00 2,874,400
2 Instalasi Pipa PVC AW 2" 12.00 M' 55,650.00 667,800
3 Instalasi Pipa PVC AW 3/4" 20.00 M' 24,010.00 480,200
4 Instalasi Pipa PVC AW 1/2" 15.00 M' 20,390.00 305,850
5 Septictank dan Rembesan 1.00 Unit -
6 Pemasangan Kloset Jongkok 1.00 Bh 125,000.00 125,000
7 Pemasangan Kran Air 2.00 Bh 25,400.00 50,800
8 Pemasangan Wastafel + Kran 2.00 Bh 85,000.00 170,000
9 Pemasangan Cermin Wastafel 100x200 cm 1.00 Unit 65,000.00 65,000
-
I PEKERJAAN LISTRIK -
1 Penyambungan Daya Listrik 11.000 VA 1,245,000.00 13,695,000
2 Perijinan Sertifikat Layak Operasi (SLO) 11.000 VA 275,000.00 3,025,000
3 Panel Listrik (Panel Terbuat dari Plat Besi dan Isi 11 MCB) 1.00 Unit 2,950,000.00 2,950,000
4 Pek. Instalasi Kabel Feeder NYY 4x10 mm2 2.00 M' 104,729.11 209,458
5 Pek. Instalasi Penerangan & Kabel NYM 3x2,5 mm2 + Conduit 28.00 Ttk 360,106.67 10,082,987
6 Pek. Instalasi Power Kipas, Exhaustfan 14.00 Ttk 365,000.00 5,110,000
7 Pemasangan Lampu TKI 2x36W 17.00 Bh 1,600,309.03 27,205,253
8 Pemasangan Lampu Baret Kotak 18/22W 8.00 Bh 685,000.00 5,480,000
9 Pemasangan Lampu E27ESS 8 watt + Downlight 4" 3.00 Bh 965,520.83 2,896,563
10 Pemasangan Saklar Single 3.00 Bh 73,961.67 221,885
11 Pemasangan Saklar Double 4.00 Bh 80,261.67 321,047
12 Pemasangan Stop Kontak Single 13.00 Bh 82,151.67 1,067,972
13 Pemasangan Exhaustfan Dinding 4.00 Unit 178,685.76 714,743
14 Pemasangan Kipas Angin Gantung 7.00 Unit 185,000.00 1,295,000
15 Pemasangan Stop Kontak Exhaustfan 4.00 Bh 82,151.67 328,607
16 Grounding (max 2 Ohm) 1.00 Lot 12,750,000 12,750,000
-
J Lain-lain -
1 IMB 1.00 Pkt -
DAFTAR HARGA UPAH
1 Pekerja Rp.
16 Mandor Rp.
Kode
O.10
O.11
O.12
O.13
O.14
O.15
O.16
O.17
O.18
O.19
O.20
O.21
O.22
O.26
O.29
O.30
O.31
O.32
O.33
O.34
O.35
O.36
O.37
O.38
O.39
O.40
O.41
O.42
O.43
O.44
O.45
O.46
O.47
O.48
O.60
O.61
O.62
O.63
O.64
O.65
O.66
O.67
O.68
O.69
O.70
O.71
O.72
O.73
O.74
O.75
O.76
O.77
O.78
O.79
O.80
O.81
O.82
O.83
O.84
O.85
O.86
O.87
O.88
O.89
O.90
O.91
O.92
O.93
O.94
O.96
O.97
O.98
O.99
O.100
O.101
O.102
O.103
O.104
O.105
O.106
O.107
O.108
O.109
O.110
O.111
O.115
O.116
O.117
O.118
O.119
O.120
O.121
O.123
O.124
O.125
O.126
O.127
O.128
O.129
O.130
O.131
O.132
O.133
O.134
O.135
O.136
O.137
O.138
O.139
O.140
O.141
O.142
O.143
O.144
O.145
O.146
O.147
O.148
O.149
O.150
O.151
O.152
O.153
O.154
O.155
O.156
O.157
O.158
O.159
O.160
O.161
O.162
O.163
O.165
O.166
O.167
O.168
O.169
O.170
O.171
O.172
O.173
O.174
O.175
O.176
O.177
O.178
O.179
O.180
O.181
O.182
O.183
O.184
O.185
O.186
O.187
O.188
O.189
O.190
O.191
O.192
O.193
O.194
O.195
O.196
O.197
O.198
O.199
O.200
O.201
O.202
O.203
O.204
O.205
O.206
O.207
O.208
O.209
O.210
O.211
O.212
O.213
O.214
O.215
O.216
O.217
O.218
O.219
O.220
O.221
O.222
O.223
O.224
O.225
O.226
O.227
O.228
O.229
O.230
O.231
O.232
O.233
O.234
O.235
O.236
O.237
O.238
O.239
O.240
O.241
O.242
O.243
O.244
O.245
O.246
O.247
O.248
O.249
O.250
O.251
O.252
O.252a
O.253
O.254
O.254a
O.255
O.256
O.257
O.258
O.259
O.260
O.261
O.262
O.263
O.264
O.265
O.266
O.267
O.268
O.269
O.270
O.272
O.276
O.277
O.279
O.280
O.281
O.282
O.283
O.284
O.285
O.286
O.287
O.288
O.289
O.290
O.291
O.292
O.293
O.294
O.295
O.296
O.297
O.298
O.299
O.300
O.301
O.302
O.303
O.304
O.305
O.306
O.307
O.308
O.309
O.310
O.311
O.312
O.313
O.314
O.315
DAFTAR HARGA SATUAN PEKERJAAN
Uraian
-
22,610.00 22,610.00
26,240.00 26,240.00
31,010.00 31,010.00
46,450.00 46,450.00
50,380.00 50,380.00
58,990.00 58,990.00
86,760.00 86,760.00
110,120.00 110,120.00
184,650.00 184,650.00
275,330.00 275,330.00
374,230.00 374,230.00
132,940.00 132,940.00
49,100.00 49,100.00
73,120.00 73,120.00
68,300.00 68,300.00
86,650.00 86,650.00
99,580.00 99,580.00
132,960.00 132,960.00
197,540.00 197,540.00
256,380.00 256,380.00
369,970.00 369,970.00
483,590.00 483,590.00
713,390.00 713,390.00
36,430.00 36,430.00
48,390.00 48,390.00
77,490.00 77,490.00
116,740.00 116,740.00
178,000.00 178,000.00
279,460.00 279,460.00
324,410.00 324,410.00
629,010.00 629,010.00
964,900.00 964,900.00
1,626,300.00 1,626,300.00
2,685,050.00 2,685,050.00
207,210.00 207,210.00
2,757,010.00 2,757,010.00
3,293,700.00 3,293,700.00
4,421,090.00 4,421,090.00
1,998,010.00 1,998,010.00
3,323,810.00 3,323,810.00
3,519,940.00 3,519,940.00
6,247,280.00 6,247,280.00
367,550.00 367,550.00
588,060.00 588,060.00
955,570.00 955,570.00
1,323,080.00 1,323,080.00
1,543,580.00 1,543,580.00
1,690,590.00 1,690,590.00
831,820.00 831,820.00
1,222,540.00 1,222,540.00
2,394,700.00 2,394,700.00
2,745,900.00 2,745,900.00
5,050,710.00 5,050,710.00
6,203,120.00 6,203,120.00
3,168,000.00 3,168,000.00
3,440,690.00 3,440,690.00
6,440,280.00 6,440,280.00
3,364,590.00 3,364,590.00
6,288,080.00 6,288,080.00
7,749,830.00 7,749,830.00
1,560,030.00 1,560,030.00
4,036,200.00 4,036,200.00
5,258,000.00 5,258,000.00
7,111,280.00 7,111,280.00
15,817,120.00 15,817,120.00
18,528,400.00 18,528,400.00
3,519,940.00 3,519,940.00
340,450.00 340,450.00
422,950.00 422,950.00
386,650.00 386,650.00
233,510.00 233,510.00
263,200.00 263,200.00
1,882,860.00 1,882,860.00
6,242,610.00 6,242,610.00
2,696,980.00 2,696,980.00
956,140.00 956,140.00
468,790.00 468,790.00
781,790.00 781,790.00
9,544,760.00 9,544,760.00
805,940.00 805,940.00
930,480.00 930,480.00
583,760.00 583,760.00
945,330.00 945,330.00
491,140.00 491,140.00
468,700.00 468,700.00
585,740.00 585,740.00
545,260.00 545,260.00
679,460.00 679,460.00
738,860.00 738,860.00
423,830.00 423,830.00
53,480.00 53,480.00
59,420.00 59,420.00
86,700.00 86,700.00
314,570.00 314,570.00
390,910.00 390,910.00
739,830.00 739,830.00
58,372,250.00 58,372,250.00
1,944,660.00 1,944,660.00
216,470.00 216,470.00
263,660.00 263,660.00
137,820.00 137,820.00
295,450.00 295,450.00
381,330.00 381,330.00
882,030.00 882,030.00
554,250.00 554,250.00
3,460,710.00 3,460,710.00
438,750.00 438,750.00
381,550.00 381,550.00
329,790.00 329,790.00
212,180.00 212,180.00
229,690.00 229,690.00
191,280.00 191,280.00
255,170.00 255,170.00
343,260.00 343,260.00
307,010.00 307,010.00
127,210,490.00 127,210,490.00
91,586,020.00 91,586,020.00
150,985,890.00 150,985,890.00
16,658,370.00 16,658,370.00
9,485,450.00 9,485,450.00
10,085,390.00 10,085,390.00
4,770,710.00 4,770,710.00
4,770,710.00 4,770,710.00
5,115,800.00 5,115,800.00
4,560,170.00 4,560,170.00
4,770,710.00 4,770,710.00
3,139,510.00 3,139,510.00
4,531,610.00 4,531,610.00
4,465,540.00 4,465,540.00
4,336,800.00 4,336,800.00
4,035,270.00 4,035,270.00
3,906,520.00 3,906,520.00
14,014,380.00 14,014,380.00
3,392,030.00 3,392,030.00
3,263,290.00 3,263,290.00
6,801,330.00 6,801,330.00
2,962,830.00 2,962,830.00
2,846,670.00 2,846,670.00
56,510.00 56,510.00
62,890.00 62,890.00
65,200.00 65,200.00
73,340.00 73,340.00
86,540.00 86,540.00
140,660.00 140,660.00
114,120.00 114,120.00
128,420.00 128,420.00
169,560.00 169,560.00
226,650.00 226,650.00
303,290.00 303,290.00
950,200.00 950,200.00
422,530.00 422,530.00
575,320.00 575,320.00
719,310.00 719,310.00
880,900.00 880,900.00
3,400,780.00 3,400,780.00
1,145,780.00 1,145,780.00
5,677,340.00 5,677,340.00
2,740,780.00 2,740,780.00
4,102,140.00 4,102,140.00
5,465,100.00 5,465,100.00
8,187,820.00 8,187,820.00
324,300.00 324,300.00
70,700.00 70,700.00
231,290.00 231,290.00
266,380.00 266,380.00
295,090.00 295,090.00
348,770.00 348,770.00
410,040.00 410,040.00
491,660.00 491,660.00
956,030.00 956,030.00
1,265,180.00 1,265,180.00
1,089,590.00 1,089,590.00
2,165,120.00 2,165,120.00
34,618,610.00 34,618,610.00
1,327,150.00 1,327,150.00
413,380.00 413,380.00
260,525,360.00 260,525,360.00
41,119,100.00 41,119,100.00
126,919,100.00 126,919,100.00
1,333,420.00 1,333,420.00
603,490.00 603,490.00
111,630.00 111,630.00
1,049,560.00 1,049,560.00
451,050.00 451,050.00
35,740.00 35,740.00
51,690.00 51,690.00
64,450.00 64,450.00
78,810.00 78,810.00
93,220.00 93,220.00
141,610.00 141,610.00
13,080.00 13,080.00
15,610.00 15,610.00
18,690.00 18,690.00
26,500.00 26,500.00
8,790.00 8,790.00
10,130.00 10,130.00
29,930.00 29,930.00
42,690.00 42,690.00
247,260.00 247,260.00
500,510.00 500,510.00
401,510.00 401,510.00
110,450.00 110,450.00
401,290.00 401,290.00
433,520.00 433,520.00
11,282,700.00 11,282,700.00
8,431,390.00 8,431,390.00
740,570.00 740,570.00
358,850.00 358,850.00
186,590.00 186,590.00
186,790.00 186,790.00
740,570.00 740,570.00
652,900.00 652,900.00
652,900.00 652,900.00
512,430.00 512,430.00
2,102,710.00 2,102,710.00
4,424,160.00 4,424,160.00
3,849,850.00 3,849,850.00
5,295,250.00 5,295,250.00
162,250.00 162,250.00
341,440.00 341,440.00
169,840.00 169,840.00
1,092,810.00 1,092,810.00
1,044,960.00 1,044,960.00
1,970,390.00 1,970,390.00
5,162,850.00 5,162,850.00
1,972,850.00 1,972,850.00
15,397,580.00 15,397,580.00
2,522,850.00 2,522,850.00
2,609,860.00 2,609,860.00
2,822,600.00 2,822,600.00
40,129,020.00 40,129,020.00
3,596,280.00 3,596,280.00
1,807,250.00 1,807,250.00
1,045,710.00 1,045,710.00
1,035,420.00 1,035,420.00
3,422,410.00 3,422,410.00
334,490.00 334,490.00
200,070.00 200,070.00
17,375,600.00 17,375,600.00
202,491,030.00 202,491,030.00
1,850,210.00 1,850,210.00
1,850,210.00 1,850,210.00
1,850,210.00 1,850,210.00
403,710.00 403,710.00
2,060,860.00 2,060,860.00
2,610,860.00 2,610,860.00
105,710.00 105,710.00
205,530.00 205,530.00
72,570.00 72,570.00
277,970.00 277,970.00
14,152,860.00 14,152,860.00
107,023,840.00 107,023,840.00
993,460.00 993,460.00
10,423,600.00 10,423,600.00
27,974,920.00 27,974,920.00
18,340,300.00 18,340,300.00
155,475,980.00 155,475,980.00
442,641,100.00 442,641,100.00
254,706,100.00 254,706,100.00
55,716,100.00 55,716,100.00
5,007,140.00 5,007,140.00
1,635,150.00 1,635,150.00
84,470.00 84,470.00
447,285,090.00 447,285,090.00
787,799,530.00 787,799,530.00
45,463,760.00 45,463,760.00
15,489,430.00 15,489,430.00
11,757,930.00 11,757,930.00
123,380.00 123,380.00
79,100.00 79,100.00
11,232,060.00 11,232,060.00
11,662,280.00 11,662,280.00
12,345,060.00 12,345,060.00
13,439,840.00 13,439,840.00
14,368,640.00 14,368,640.00
15,501,860.00 15,501,860.00
20,612,460.00 20,612,460.00
21,796,340.00 21,796,340.00
23,167,760.00 23,167,760.00
24,795,590.00 24,795,590.00
29,905,970.00 29,905,970.00
102,011,200.00 102,011,200.00
225,371,980.00 225,371,980.00
281,021,970.00 281,021,970.00
296,430,430.00 296,430,430.00
298,845,740.00 298,845,740.00
318,650,430.00 318,650,430.00
333,461,170.00 333,461,170.00
8,190,600.00 8,190,600.00
2,755,920.00 2,755,920.00
379,600.00 379,600.00
DAFTAR HARGA BAHAN & UPAH
H. Pekerjaan Telepon
1 Peralatan Utama
- PABX 200 Pairs
- Billing Sistem
- Rectifier
- Battery
- Surge Arester
- MDF
- Monitor
2 Pesawat Telephone Single Line
3 CTB 200 Pairs
4 Socket Telephone RJ-11
5 Terminal Box 10 Pairs
6 Terminal Box 20 Pairs
7 Terminal Box 30 Pairs
8 Kabel ITC 10x2x2x0,6 mm2
9 Kabel ITC 20x2x2x0,6 mm2
10 Kabel ITC 30x2x2x0,6 mm2
11 Kabel ITC 200x2x2x0,6 mm2
12 Kabel Coaxial RG8 ( 0,6 mm2 )
I. SOUND SISTEM
1 240 W/300W Power Amplifier
2 Autorserve Cassete
3 CD Playaer
4 Equalizer Card ( VX-200 )
5 Mixer Frame w/ Module (V-1000B )
6 Pagging Microphone PM 660D/1 ( w/ RU-2001 )
7 Radio Tunner AM/FM ( V-1034B )
8 Speaker Selector ( SS-021B )
9 Ceiling Speaker ( ZS-646R )
10 Coulumn speaker 20 watt
11 Horn Speaker
12 Attenuator
13 Kabel NYMHY 2x1,5 mm2
14 Kabel NYMHY 3x1,5 mm2
15 Kabel NYMHY 3( 3 x2,5 mm2 )
16 Terminal Box / TB
17 MDF / CTB
18 Cabinet Rack
19 Volume Control
J. CCTV
1 NVR Samsung SRN-1670D
2 VIEWSONIC Multi-touch Monitor LED 24"
3 Switch D-LINK DGS-1210-20 16 port
4 Switch Hub Managed TPLink 8 Port TL SG3210
5 D-LINK Switch Unmanaged [DGS-1005A] 5 port
6 PC Computer + Printer
7 Fixed Dome Camera
8 Camera With Rotation
9 Rack CCTV
K. DATA
1 HP ProLiant DL320eG8-421
2 Path Panel 2x48 port
3 Monitor
4 Printer
5 Socket Data ( RG-45 )
6 Kabel UTP- Cat 5e - 0,6 mm2
L. Material dan alat bantu
1 Inbown dus
2 Fisher s6
3 Ballast electronik 28 Watt
4 Pipa Conduit 20 mm²
5 Pipa Conduit 25 mm²
6 Klem pipa conduit 20 mm²
7 Klem pipa conduit 25 mm²
8 T dus
9 Isolasi
10 Kabel ties
11 Kawat bendrat
12 LAMPU
13 Tiang Penangkal Petir Radius 100 m Lengkap
14 Grounding Rod Elektronik Dia. 20 mmx12 m Maximum 1 Ohm
15 Grounding Rod Elektrikal Dia. 20 mmx12 m Maximum 2 Ohm
16 Grounding Cooper Plat 1000x1000x10 mm
17 Bak Kontrol 40x40x40 cm+EGB Maximum 2 Ohm
18 EGB 300x100x5 mm
19 Kabel Grounding Panel
20 Spliter 2 Way
21 Spliter 4 Way
22 Outlet MATV
DAFTAR HARGA BAHAN & UPAH
Rp 80,000.00 /Hari
Rp 100,000.00 /Hari
Rp 120,000.00 /Hari
Rp 125,000.00 /Hari
Rp 2,640.00 /meter
Rp 15,600.00 /meter
Rp 31,200.00 /meter
Rp 64,800.00 /meter
Rp 199,200.00 /meter
Rp 248,400.00 /meter
Rp 18,000.00 /meter
Rp 27,600.00 /meter
Rp 36,000.00 /meter
Rp 50,400.00 /meter
Rp 80,400.00 /meter
Rp 94,800.00 /meter
Rp 201,600.00 /meter
Rp 268,800.00 /meter
Rp 382,800.00 /meter
Rp 526,800.00 /meter
Rp 663,600.00 /meter
Rp 16,800.00 /meter
Rp 720,000.00 /meter
Rp 1,020,000.00 /meter
Rp 600,000.00 /meter
Rp 177,600.00 /meter
Rp 270,000.00 /meter
Rp 366,000.00 /meter
Rp 1,451,160.00 /meter
Rp 253,560.00 /meter
Rp 760,680.00 /meter
Rp 1,320,000.00 /buah
Rp 1,020,000.00 /buah
Rp 2,400,000.00 /buah
Rp 1,500,000.00 /buah
Rp 1,560,000.00 /set
Rp 1,380,000.00 /buah
Tiang 7 meter (lengkap Baterai) Rp 57,600,000.00 /Set
Rp 900,000.00 /buah
Rp 42,000.00 /buah
Rp 48,000.00 /buah
Rp 54,000.00 /buah
Rp 75,600.00 /buah
Rp 96,000.00 /buah
Rp 900,000.00 /Set
K,200 Lumen 28 Watt Rp 3,000,000.00 /Set
Rp 50,400.00 buah
Rp 390,000.00 buah
Rp 390,000.00 buah
Rp 266,400.00 meter
Rp 302,400.00 meter
Rp 370,080.00 meter
Rp 388,800.00 meter
Rp 141,120.00 meter
Rp 201,600.00 meter
Rp 220,320.00 meter
Rp 384,480.00 meter
Rp 139,680.00 meter
Rp 159,840.00 meter
Rp 200,160.00 meter
Rp 357,120.00 meter
Rp 403,200,000.00 unit
Rp 143,640,000.00 unit
Rp 143,640,000.00 unit
Rp 143,640,000.00 unit
Rp 480,000,000.00 unit
Rp 900,000,000.00 unit
Rp 96,000,000.00 unit
Rp 4,200,000.00 unit
Rp 2,040,000.00 buah
Rp 864,000.00 buah
Rp 600,000.00 buah
Rp 240,000.00 buah
Rp 432,000.00 buah
Rp 276,000.00 buah
NYM 2 x 2,5 mm2 Rp 37,200.00 buah
Rp 240,000.00 buah
Rp 102,000,000.00 Unit
Rp 588,000.00 buah
Rp 4,200,000.00 buah
Rp 105,840.00 buah
Rp 546,000.00 buah
Rp 823,200.00 buah
Rp 924,000.00 buah
Rp 31,920.00 meter
Rp 63,840.00 meter
Rp 95,760.00 meter
Rp 638,400.00 meter
Rp 9,600.00 meter
Rp 9,943,080.00 unit
Rp 5,187,000.00 unit
Rp 5,346,600.00 unit
Rp 2,741,280.00 unit
Rp 12,394,320.00 unit
D/1 ( w/ RU-2001 ) Rp 3,943,200.00
Rp 6,064,800.00 unit
Rp 8,527,200.00 buah
Rp 117,600.00 buah
Rp 618,000.00 buah
Rp 432,000.00 buah
Rp 277,200.00 buah
Rp 15,120.00 meter
Rp 18,720.00 meter
Rp 58,800.00 meter
Rp 504,000.00 buah
Rp 756,000.00 unit
Rp 6,720,000.00 unit
Rp 300,000.00 buah
Rp 66,000,000.00 unit
nitor LED 24" Rp 5,640,000.00 unit
Rp 2,640,000.00 unit
8 Port TL SG3210 Rp 960,000.00 unit
DGS-1005A] 5 port Rp 300,000.00 unit
Rp 6,000,000.00 unit
Rp 9,600,000.00 buah
Rp 9,600,000.00 buah
Rp 4,800,000.00 unit
Rp 19,200,000.00 unit
Rp 8,400,000.00 unit
Rp 4,704,000.00 unit
Rp 1,428,000.00 unit
Rp 65,000.00 buah
Rp 15,600.00 meter
Rp 7,200.00 /buah
Rp 600.00 /buah
Rp 84,000.00 /buah
Rp 4,800.00 meter
Rp 6,000.00 meter
Rp 1,800.00 buah
Rp 2,400.00 buah
Rp 7,200.00 buah
Rp 7,200.00 roll
Rp 600.00 buah
Rp 2,400.00 buah
a b c d
O.10 1 M1 PEMASANGAN PIPA PVC AW DIAMETER 1/2"
A BAHAN
1 Pipa PVC 1.2000 m1
2 Perlengkapan 1.0000 ls
B TENAGA
1 Pekerja 0.0360 Oh
2 Tukang Pipa 0.0600 Oh
3 Kepala Tukang 0.0060 Oh
4 Mandor 0.0020 Oh
C PERALATAN
A BAHAN
1 Pipa PVC 1.2000 m1
2 Perlengkapan 1.0000 ls
B TENAGA
1 Pekerja 0.0360 Oh
2 Tukang Pipa 0.0600 Oh
3 Kepala Tukang 0.0060 Oh
4 Mandor 0.0020 Oh
C PERALATAN
A BAHAN
1 Pipa PVC 1.2000 m1
2 Perlengkapan 1.0000 ls
B TENAGA
1 Pekerja 0.0540 Oh
2 Tukang Pipa 0.0900 Oh
3 Kepala Tukang 0.0090 Oh
4 Mandor 0.0030 Oh
C PERALATAN
A BAHAN
1 Pipa PVC 1.2000 m1
2 Perlengkapan 1.0000 ls
B TENAGA
1 Pekerja 0.0540 Oh
2 Tukang Pipa 0.0900 Oh
3 Kepala Tukang 0.0090 Oh
4 Mandor 0.0030 Oh
C PERALATAN
A BAHAN
1 Pipa PVC 1.2000 m1
2 Perlengkapan 1.0000 ls
B TENAGA
1 Pekerja 0.0540 Oh
2 Tukang Pipa 0.0900 Oh
3 Kepala Tukang 0.0090 Oh
4 Mandor 0.0030 Oh
C PERALATAN
A BAHAN
1 Pipa PVC 1.2000 m1
2 Perlengkapan 1.0000 ls
B TENAGA
1 Pekerja 0.0810 Oh
2 Tukang Pipa 0.1350 Oh
3 Kepala Tukang 0.0135 Oh
4 Mandor 0.0040 Oh
C PERALATAN
A BAHAN
1 Pipa PVC 1.2000 m1
2 Perlengkapan 1.0000 ls
B TENAGA
1 Pekerja 0.0810 Oh
2 Tukang Pipa 0.1350 Oh
3 Kepala Tukang 0.0135 Oh
4 Mandor 0.0040 Oh
C PERALATAN
A BAHAN
1 Pipa PVC 1.2000 m1
2 Perlengkapan 1.0000 ls
B TENAGA
1 Pekerja 0.0810 Oh
2 Tukang Pipa 0.1350 Oh
3 Kepala Tukang 0.0135 Oh
4 Mandor 0.0040 Oh
C PERALATAN
A BAHAN
1 Pipa PVC 1.2000 m1
B TENAGA
1 Pekerja 0.0810 Oh
2 Tukang Pipa 0.1350 Oh
3 Kepala Tukang 0.0135 Oh
4 Mandor 0.0040 Oh
C PERALATAN
A BAHAN
1 Pipa PVC 1.2000 m1
2 Perlengkapan 1.0000 ls
B TENAGA
1 Pekerja 0.0540 Oh
2 Tukang Pipa 0.0900 Oh
3 Kepala Tukang 0.0090 Oh
4 Mandor 0.0030 Oh
C PERALATAN
A BAHAN
1 Pipa PVC 1.2000 m1
2 Perlengkapan 1.0000 ls
B TENAGA
1 Pekerja 0.0810 Oh
2 Tukang Pipa 0.1350 Oh
3 Kepala Tukang 0.0135 Oh
4 Mandor 0.0040 Oh
C PERALATAN
A BAHAN
1 Pipa Black Steel Sch. 40 1.0000 m1
2 Perlengkapan 1.0000 ls
B TENAGA
1 Tukang Pipa 0.0500 Oh
2 Kepala Tukang 0.0500 Oh
3 Mandor 0.0250 Oh
C PERALATAN
A BAHAN
1 Pipa PVC 1.2000 m1
2 Perlengkapan 1.0000 ls
B TENAGA
1 Pekerja 0.0810 Oh
2 Tukang Pipa 0.1350 Oh
3 Kepala Tukang 0.0135 Oh
4 Mandor 0.0040 Oh
C PERALATAN
A BAHAN
1 Pipa PVC 1.2000 m1
2 Perlengkapan 1.0000 ls
B TENAGA
1 Pekerja 0.0810 Oh
2 Tukang Pipa 0.1350 Oh
3 Kepala Tukang 0.0135 Oh
4 Mandor 0.0040 Oh
C PERALATAN
A BAHAN
1 Pipa PVC 1.2000 m1
2 Perlengkapan 1.0000 ls
B TENAGA
1 Pekerja 0.0540 Oh
2 Tukang Pipa 0.0900 Oh
3 Kepala Tukang 0.0090 Oh
4 Mandor 0.0030 Oh
C PERALATAN
A BAHAN
1 Kabel NYY 4 x 4 MM2 1.0000 m1
2 Kabel NYA 1 x 4 MM2 1.0000 m1
B TENAGA
1 Tukang 0.0167 Oh
2 Kepala Tukang Listrik 0.0167 Oh
3 Mandor 0.0083 Oh
C PERALATAN
A BAHAN
1 Kabel NYY 4 x 4 MM2 1.0000 m1
2 Kabel NYA 1 x 4 MM2 1.0000 m1
B TENAGA
1 Tukang 0.0167 Oh
2 Kepala Tukang Listrik 0.0167 Oh
3 Mandor 0.0083 Oh
C PERALATAN
A BAHAN
1 Kabel NYFGbY 1.0000 m1
2 Galian, Urugan, dan Pelindung Kabel 1.0000 m1
B TENAGA
1 Tukang 0.0833 Oh
2 Kepala Tukang Listrik 0.0833 Oh
3 Mandor 0.0833 Oh
C PERALATAN
A BAHAN
1 Pipa BSP Sch. 40 Diameter 100 mm 1.0000 m1
2 Perlengkapan 1.0000 ls
B TENAGA
1 Tukang Pipa 0.1333 Oh
2 Kepala Tukang 0.1333 Oh
3 Mandor 0.0667 Oh
C PERALATAN
A BAHAN
1 Pemasangan Pipa BSP Sch.40 diameter 32 mm 1.0000 m1
2 Perlengkapan 1.0000 ls
B TENAGA
1 Tukang Pipa 0.0500 Oh
2 Kepala Tukang 0.0500 Oh
3 Mandor 0.0250 Oh
C PERALATAN
1 Ceiling Exhaust Air Fan , Kapasitas : 170 CFM - Duct Type 1.0000 bh
1 Pemipaan Ventilasi Udara ( Exhaust Fan ) dan Ducting 250 x 250 1.0000 bh
5,550.00 6,660.00
1,942.50 1,942.50
80,000.00 2,880.00
100,000.00 6,000.00
130,000.00 780.00
140,000.00 280.00
18,542.50
1,854.25
20,396.75
20,390.00
7,675.00 9,210.00
2,686.25 2,686.25
80,000.00 2,880.00
100,000.00 6,000.00
130,000.00 780.00
140,000.00 280.00
21,836.25
2,183.63
24,019.88
24,010.00
10,475.00 12,570.00
3,666.25 3,666.25
80,000.00 2,880.00
100,000.00 6,000.00
130,000.00 780.00
140,000.00 280.00
26,176.25
2,617.63
28,793.88
28,790.00
15,675.00 18,810.00
5,486.25 5,486.25
80,000.00 4,320.00
100,000.00 9,000.00
130,000.00 1,170.00
140,000.00 420.00
39,206.25
3,920.63
43,126.88
43,120.00
17,975.00 21,570.00
6,291.25 6,291.25
80,000.00 4,320.00
100,000.00 9,000.00
130,000.00 1,170.00
140,000.00 420.00
42,771.25
4,277.13
47,048.38
47,040.00
23,025.00 27,630.00
8,058.75 8,058.75
80,000.00 4,320.00
100,000.00 9,000.00
130,000.00 1,170.00
140,000.00 420.00
50,598.75
5,059.88
55,658.63
55,650.00
33,575.00 40,290.00
11,751.25 11,751.25
80,000.00 6,480.00
100,000.00 13,500.00
130,000.00 1,755.00
140,000.00 560.00
74,336.25
7,433.63
81,769.88
81,760.00
47,275.00 56,730.00
16,546.25 16,546.25
80,000.00 6,480.00
100,000.00 13,500.00
130,000.00 1,755.00
140,000.00 560.00
95,571.25
9,557.13
105,128.38
105,120.00
78,350.00 94,020.00
47,010.00 47,010.00
80,000.00 6,480.00
100,000.00 13,500.00
130,000.00 1,755.00
140,000.00 560.00
163,325.00
16,332.50
179,657.50
179,650.00
124,150.00 148,980.00
74,490.00 74,490.00
80,000.00 6,480.00
100,000.00 13,500.00
130,000.00 1,755.00
140,000.00 560.00
245,765.00
24,576.50
270,341.50
270,340.00
174,100.00 208,920.00
104,460.00 104,460.00
80,000.00 6,480.00
100,000.00 13,500.00
130,000.00 1,755.00
140,000.00 560.00
335,675.00
33,567.50
369,242.50
369,240.00
78,350.00 94,020.00
80,000.00 6,480.00
100,000.00 13,500.00
130,000.00 1,755.00
140,000.00 560.00
116,315.00
11,631.50
127,946.50
127,940.00
11,125.00 13,350.00
13,350.00 13,350.00
80,000.00 4,320.00
100,000.00 9,000.00
130,000.00 1,170.00
140,000.00 420.00
41,610.00
4,161.00
45,771.00
45,770.00
25,575.00 30,690.00
8,951.25 8,951.25
80,000.00 6,480.00
100,000.00 13,500.00
130,000.00 1,755.00
140,000.00 560.00
61,936.25
6,193.63
68,129.88
68,120.00
41,516.67 41,516.67
4,151.67 4,151.67
100,000.00 5,000.00
130,000.00 6,500.00
140,000.00 3,500.00
60,668.33
6,066.83
66,735.17
66,730.00
107,716.25 86,173.00
45,861.40 36,689.12
38,556.25 34,700.63
41,311.40 330.49
78,000.00 19,500.00
29,250.00 6,394.05
80,000.00 20,000.00
140,000.00 3,500.00
207,287.29
20,728.73
228,016.01
228,010.00
10,823,000.00 10,823,000.00
107,500.00 107,500.00
100,000.00 5,000.00
130,000.00 6,500.00
140,000.00 3,500.00
10,945,500.00
1,094,550.00
12,040,050.00
12,040,000.00 12040000
3,145,200.00 3,145,200.00
121,000.00 20,166.67
135,000.00 22,500.00
145,000.00 12,083.33
3,199,950.00
319,995.00
3,519,945.00
3,519,940.00 3,519,940.00
RON - NON RAISE STEM KITZ DIAMETER 3"
2,966,900.00 2,966,900.00
121,000.00 20,166.67
135,000.00 22,500.00
145,000.00 12,083.33
3,021,650.00
302,165.00
3,323,815.00
3,323,810.00 3,323,810.00
78,350.00 94,020.00
47,010.00 47,010.00
100,000.00 8,100.00
121,000.00 16,335.00
135,000.00 1,822.50
145,000.00 580.00
167,867.50
16,786.75
184,654.25
184,650.00 184,650.00
47,275.00 56,730.00
16,546.25 16,546.25
100,000.00 8,100.00
121,000.00 16,335.00
135,000.00 1,822.50
145,000.00 580.00
100,113.75
10,011.38
110,125.13
110,120.00 110,120.00
33,575.00 40,290.00
11,751.25 11,751.25
100,000.00 8,100.00
121,000.00 16,335.00
135,000.00 1,822.50
145,000.00 580.00
78,878.75
7,887.88
86,766.63
86,760.00 86,760.00
23,025.00 27,630.00
8,058.75 8,058.75
100,000.00 5,400.00
121,000.00 10,890.00
135,000.00 1,215.00
145,000.00 435.00
53,628.75
5,362.88
58,991.63
58,990.00 58,990.00
135,380,000.00 135,380,000.00
676,900.00 676,900.00
121,000.00 363,000.00
135,000.00 405,000.00
145,000.00 435,000.00
137,259,900.00
13,725,990.00
150,985,890.00
150,985,890.00 150,985,890.00
45,900.00 45,900.00
5,800.00 5,800.00
121,000.00 2,016.67
135,000.00 2,250.00
145,000.00 1,208.33
57,175.00
5,717.50
62,892.50
62,890.00 62,890.00
45,900.00 45,900.00
5,800.00 5,800.00
121,000.00 2,016.67
135,000.00 2,250.00
145,000.00 1,208.33
57,175.00
5,717.50
62,892.50
62,890.00
45,900.00 45,900.00
5,800.00 5,800.00
121,000.00 2,016.67
135,000.00 2,250.00
145,000.00 1,208.33
57,175.00
5,717.50
62,892.50
62,890.00
2,145,800.00 2,145,800.00
1,481,400.00 1,481,400.00
1,061,800.00 4,247,200.00
124,600.00 373,800.00
156,200.00 156,200.00
195,400.00 195,400.00
5,144,200.00 5,144,200.00
290,000.00 290,000.00
307,980.00 307,980.00
121,000.00 242,000.00
135,000.00 270,000.00
145,000.00 290,000.00
15,143,980.00
1,514,398.00
16,658,378.00
16,658,370.00 16,658,370.00
45,900.00 45,900.00
5,800.00 5,800.00
121,000.00 2,016.67
135,000.00 2,250.00
145,000.00 1,208.33
57,175.00
5,717.50
62,892.50
62,890.00
45,900.00 45,900.00
5,800.00 5,800.00
121,000.00 2,016.67
135,000.00 2,250.00
145,000.00 1,208.33
57,175.00
5,717.50
62,892.50
62,890.00
58,000.00 174,000.00
244,700.00 244,700.00
244,700.00 244,700.00
2,404,900.00 4,809,800.00
124,600.00 373,800.00
195,400.00 195,400.00
1,353,800.00 1,353,800.00
160,200.00 160,200.00
738,240.00 738,240.00
121,000.00 121,000.00
135,000.00 135,000.00
145,000.00 72,500.00
8,623,140.00
862,314.00
9,485,454.00
9,485,450.00 9,485,450.00
1,481,400.00 1,481,400.00
1,061,800.00 1,061,800.00
244,700.00 244,700.00
1,481,400.00 2,962,800.00
124,600.00 373,800.00
195,400.00 195,400.00
1,700,000.00 1,700,000.00
16,500.00 16,500.00
803,640.00 803,640.00
121,000.00 121,000.00
135,000.00 135,000.00
145,000.00 72,500.00
9,168,540.00
916,854.00
10,085,394.00
10,085,390.00 10,085,390.00
58,000.00 174,000.00
244,700.00 244,700.00
244,700.00 244,700.00
2,404,900.00 4,809,800.00
124,600.00 373,800.00
195,400.00 195,400.00
1,353,800.00 1,353,800.00
160,200.00 160,200.00
738,240.00 738,240.00
121,000.00 121,000.00
135,000.00 135,000.00
145,000.00 72,500.00
8,623,140.00
862,314.00
9,485,454.00
9,485,450.00 9,485,450.00
m2 dalam conduit PVC
69,600.00 69,600.00
107,250.00 107,250.00
121,000.00 10,083.33
135,000.00 11,250.00
145,000.00 12,083.33
210,266.67
21,026.67
231,293.33
231,290.00 231,290.00
124,000.00 124,000.00
30,000.00 30,000.00
121,000.00 8,066.67
135,000.00 9,000.00
145,000.00 4,833.33
175,900.00
17,590.00
193,490.00
193,500.00 193,500.00
32,200.00 32,200.00
121,000.00 6,050.00
135,000.00 6,750.00
145,000.00 3,625.00
48,625.00
4,862.50
53,487.50
53,480.00 53,480.00
37,600.00 37,600.00
121,000.00 6,050.00
135,000.00 6,750.00
145,000.00 3,625.00
54,025.00
5,402.50
59,427.50
59,420.00 59,420.00
32,200.00 32,200.00
121,000.00 6,050.00
135,000.00 6,750.00
145,000.00 3,625.00
48,625.00
4,862.50
53,487.50
53,480.00 53,480.00
30,940.00 30,940.00
121,000.00 6,050.00
135,000.00 6,750.00
145,000.00 3,625.00
47,365.00
4,736.50
52,101.50
52,100.00 52,100.00
265,950.00 265,950.00
26,595.00 26,595.00
121,000.00 16,133.33
135,000.00 18,000.00
145,000.00 9,666.67
336,345.00
33,634.50
369,979.50
369,970.00
3,394,800.00 3,394,800.00
121,000.00 6,050.00
135,000.00 6,750.00
145,000.00 3,625.00
3,411,225.00
341,122.50
3,752,347.50
3,752,300.00 3,752,300.00
187,000.00 187,000.00
18,700.00 18,700.00
121,000.00 10,083.33
135,000.00 11,250.00
145,000.00 6,041.67
233,075.00
23,307.50
256,382.50
256,380.00 256,380.00
58,000.00 58,000.00
5,500.00 5,500.00
121,000.00 10,083.33
135,000.00 11,250.00
145,000.00 6,041.67
90,875.00
9,087.50
99,962.50
100,000.00 100,000.00
56,683.33 56,683.33
5,668.33 5,668.33
121,000.00 6,050.00
135,000.00 6,750.00
145,000.00 3,625.00
78,776.66
7,877.67
86,654.33
86,650.00
41,516.67 41,516.67
4,151.67 4,151.67
121,000.00 6,050.00
135,000.00 6,750.00
145,000.00 3,625.00
62,093.34
6,209.33
68,302.67
68,300.00
4,703,900.00 4,703,900.00
676,900.00 676,900.00
121,000.00 363,000.00
135,000.00 405,000.00
145,000.00 435,000.00
6,583,800.00
658,380.00
7,242,180.00
7,242,000.00 7,242,000.00
5,015,420.00 5,015,420.00
676,900.00 676,900.00
121,000.00 363,000.00
135,000.00 405,000.00
145,000.00 435,000.00
6,895,320.00
689,532.00
7,584,852.00
7,584,800.00 7,584,800.00
5,226,420.00 5,226,420.00
676,900.00 676,900.00
121,000.00 363,000.00
135,000.00 405,000.00
145,000.00 435,000.00
7,106,320.00
710,632.00
7,816,952.00
7,816,900.00 7,816,900.00
195,100.00 2,731,400.00
250,000.00 250,000.00
7,700.00 7,700.00
121,000.00 60,500.00
135,000.00 67,500.00
145,000.00 29,000.00
3,146,100.00
314,610.00
3,460,710.00
3,460,710.00 3,460,710.00
24,700.00 395,200.00
7,700.00 7,700.00
121,000.00 36,300.00
135,000.00 40,500.00
145,000.00 24,166.67
503,866.67
50,386.67
554,253.33
554,250.00 554,250.00
1,325,050.00 1,325,050.00
50,000.00 50,000.00
121,000.00 36,300.00
135,000.00 40,500.00
145,000.00 24,166.67
1,476,016.67
147,601.67
1,623,618.33
1,623,600.00 1,623,600.00
389,500.00 389,500.00
30,000.00 30,000.00
121,000.00 36,300.00
135,000.00 40,500.00
145,000.00 24,166.67
520,466.67
52,046.67
572,513.33
572,500.00 572,500.00
468,081,000.00 468,081,000.00
121,000.00 36,300.00
135,000.00 40,500.00
145,000.00 24,166.67
468,181,966.67
46,818,196.67
515,000,163.33 515,000,000.00
515,000,000.00
193,400.00 193,400.00
48,350.00 48,350.00
121,000.00 4,033.33
135,000.00 4,500.00
145,000.00 2,416.67
252,700.00
25,270.00
277,970.00
277,970.00
2,187,800.00 2,187,800.00
218,780.00 218,780.00
121,000.00 4,033.33
135,000.00 4,500.00
145,000.00 2,416.67
2,417,530.00
241,753.00
2,659,283.00
2,659,300.00 2,659,300.00
521,900.00 521,900.00
52,190.00 52,190.00
121,000.00 4,033.33
135,000.00 4,500.00
145,000.00 2,416.67
585,040.00
58,504.00
643,544.00
643,500.00 643,500.00
585,290.00 585,290.00
58,529.00 58,529.00
121,000.00 4,033.33
135,000.00 4,500.00
145,000.00 2,416.67
654,769.00
65,476.90
720,245.90
7,202,500.00 7,202,500.00
30,650.00 30,650.00
3,000.00 3,000.00
121,000.00 6,050.00
135,000.00 6,750.00
145,000.00 3,625.00
50,075.00
5,007.50
55,082.50
55,000.00 55,000.00
275,350.00 275,350.00
27,535.00 27,535.00
121,000.00 4,033.33
135,000.00 4,500.00
145,000.00 2,416.67
313,835.00
31,383.50
345,218.50
345,200.00 345,200.00
251,120.00 251,120.00
25,112.00 25,112.00
121,000.00 4,033.33
135,000.00 4,500.00
145,000.00 2,416.67
287,182.00
28,718.20
315,900.20
315,900.00 315900
161,920.00 161,920.00
16,192.00 16,192.00
121,000.00 4,033.33
135,000.00 4,500.00
145,000.00 2,416.67
189,062.00
18,906.20
207,968.20
207,900.00 207,900.00
657,300.00 657,300.00
65,730.00 65,730.00
121,000.00 4,033.33
135,000.00 4,500.00
145,000.00 2,416.67
733,980.00
73,398.00
807,378.00
807,400.00 807,400.00
420,600.00 420,600.00
42,060.00 42,060.00
121,000.00 4,033.33
135,000.00 4,500.00
145,000.00 2,416.67
473,610.00
47,361.00
520,971.00
521,000.00 521,000.00
ANALISA HARGA SATUAN PEKERJAAN E
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
49 1 Unit EOL
Bahan:
a. EOL Unit
b. Alat Bantu lot
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
62 1 Unit CD Playaer
Bahan:
a. CD Playaer Unit
b. Alat Bantu lot
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
71 1 Unit Attenuator
Bahan:
a. Attenuator Unit
b. Alat Bantu lot
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
83 1 Unit Monitor
Bahan:
a. Monitor Unit
b. Alat Bantu lot
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
84 1 Unit Printer
Bahan:
a. Printer Unit
b. Alat Bantu lot
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju
72 1 Unit Kabel NYMHY 2x1,5 mm2
Bahan:
a. Kabel NYMHY 2x1,5 mm2 Unit
b. Alat Bantu lot
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh