DAFTAR KESEPAKATAN HARGA SATUAN BAHAN / MATERIAL DAN UPAH SEMESTER 2

DINAS BINA MARGA, DINAS PENGELOLAAN SUMBER DAYA AIR & PERTAMBANGAN
DAN DINAS CIPTA KARYA & TATA RUANG
KABUPATEN CIREBON
TAHUN ANGGARAN 2014

NO URAIAN BAHAN/MATERIAL SAT. HARGA KET


KESEPAKATAN
A. BAHAN :
I. BATU
1 Abu Batu m3 172,500.00
2 Atras ( tanah urug ) m3 125,000.00
3 Base course A m3 175,000.00
4 Base course B m3 165,800.00
5 Batu apung kg 4,300.00
6 Batu belah 10/15 cm m3 135,000.00
7 Batu belah 15/20 cm m3 135,000.00
8 Batu pecah mesin 0.5-1 cm m3 180,000.00
9 Batu pecah mesin 1-2 cm m3 180,000.00
10 Batu pecah mesin 2-3 cm m3 180,000.00
11 Batu tempel Palimanan 10 X 20 bh 1,500.00
12 Batu tempel kapur tekstur tidak rata bh 2,000.00
13 Kapur bakar m3 70,000.00
14 Kapur Sirih kg 2,000.00
15 Kerikil m3 65,000.00

II. PASIR
1 Pasir beton m3 150,000.00
2 Pasir aspal m3 150,000.00
3 Pasir pasang m3 143,000.00
4 Pasir urug m3 110,000.00
5 Sirtu m3 110,000.00
6 Sirtu tersaring m3 115,000.00
7 Tanah urug pilhan m3 125,000.00
8 Tanah urug biasa m3 100,000.00
III. BESI / PIPA / KAWAT
1 Besi WF/Besi Profil kg 11,250.00
2 Besi strip kg 11,250.00
3 Besi beton kg 11,000.00
4 Besi stainless dia. 0,5" m' 38,000.00
5 Besi stainless dia. 1" m' 60,000.00
6 Besi stainless dia. 1,5" m' 75,000.00
7 Besi stainless dia. 2" m' 80,000.00
8 Besi stainless dia. 2,5" m' 125,000.00
9 Besi stainless dia. 3" m' 152,000.00
10 Besi galvanis dia. 0.5" m' 25,000.00
11 Besi galvanis dia. 1" m' 27,000.00
12 Besi galvanis dia. 1.5" m' 45,000.00
13 Besi galvanis dia. 2" m' 57,000.00
14 Besi galvanis dia. 2.5" m' 80,500.00
15 Besi galvanis dia. 3" m' 96,000.00
16 Besi biasa dia. 2" btg 250,000.00
17 Besi biasa dia. 3" btg 310,000.00
18 Dop besi Ø 3 " bh 60,000.00
19 Kawat beton / Kawat tali kg 18,000.00
20 Kawat bronjong dia. 4 mm kg 20,000.00
21 Kawat galvanis dia. 4 mm kg 20,000.00
22 Kawat galvanis dia. 6 mm kg 24,000.00
23 Kawat duri m' 20,000.00
24 Pipa besi galvanis 2" btg 324,000.00
25 Pipa besi galvanis 3" btg/6m' 600,000.00
26 Pipa PVC Ø 2" S-12,5 ( 8 - 10 bar ) m' 26,300.00
27 Pipa PVC Ø 3" S-12,5 ( 8 - 10 bar ) m' 53,600.00
28 Pipa PVC / paralon 2 inch btg 50,600.00
29 Pipa PVC / paralon 3 inch btg 75,000.00
30 Pipa Reducer PVC Ø 3"-4" bh 5,800.00
31 Pipa Knee/bend PVC Ø 3" bh 5,800.00
32 Plat baja tebal 5 mm - 20 mm kg 12,650.00
33 Ram kawat harmonika m2 23,200.00
34 Socket besi O 3 " bh 45,000.00
NO URAIAN BAHAN/MATERIAL SAT. HARGA KET
KESEPAKATAN

IV. PABRIKAN / TOKO


1 Alumunium foil m2 9,000.00
2 Alumunium pelapis pintu KM lbr 130,000.00
3 Asbes gelombang 1500 x 1050 x 4 mm lbr 35,000.00
4 Asbes gelombang 1800 x 920 x 4 mm lbr 42,500.00
5 Asbes gelombang 2100 x 1050 x 4 mm lbr 57,000.00
6 Asbes gelombang 2400 x 1050 x 4 mm lbr 65,000.00
7 Asbes gelombang 2700 x 1050 x 4 mm lbr 75,000.00
8 Asbes gelombang 3000 x 1050 x 4 mm lbr 85,000.00
9 Bak mandi keramik volume 0,3 m3 bh 185,000.00
10 Bak mandi fiber 120 L bh 220,000.00
11 Batu apung kg 4,300.00
12 Baut 3/4 " bh 3,000.00
13 Baut 5/8 " bh 3,800.00
14 Baut 1/2 " bh 6,000.00
15 Baut 1/2 " panjang 30 cm bh 8,550.00
16 Baut lawa-lawa bh 9,900.00
17 Beading penurunan ( PC ) gypsum m' 10,000.00
18 Beading horison gypsum m' 10,000.00
19 Cat Menie kg 20,000.00
20 Cat genteng kg 48,000.00
21 Cat penutup kayu kg 49,000.00
22 Cat penutup tembok kg 23,000.00
23 Cat penutup besi kg 45,000.00
24 Cat Sinkromat kg 80,000.00
25 Closet duduk ( mono block ) porselen merk INA bh 1,237,000.00
26 Closet duduk ( siram ) porselen merk INA bh 545,000.00
27 Closet jongkok porselen merk INA/KIA bh 140,000.00
28 Dempul kayu kg 18,000.00
29 Dinding keramik uk. 10 x 20 cm bh 950.00
30 Dinding keramik uk. 20 x 20 cm bh 1,850.00
31 Dinding keramik uk. 20 x 25 cm bh 2,200.00
32 Dinding keramik uk. 30 x 30 cm bh 3,300.00
33 Door closer bh 158,125.00
34 Daun pintu alumunium lengkap warna natural/coklat dop bh 900,000.00
35 Daun pintu alumunium lengkap warna coklat kilap bh 1,300,000.00
36 Daun jendela alumunium lengkap warna natural/coklat dop bh 350,000.00
37 Daun jendela alumunium lengkap warna coklat kilap bh 400,000.00
38 Elastomer 30x30x5 bh 550,000.00
39 Engsel jendela set 12,000.00
40 Engsel pintu set 15,000.00
41 Engsel meubeler bh 3,800.00
42 Eternit tebal 4 mm uk. 1 m x 1 m lbr 6,800.00
43 Eternit tebal 4 mm uk. 1 m x 0,5 m lbr 3,400.00
44 Flincote ltr 22,000.00
45 Glass beat kg 20,000.00
46 Glass Block bh 17,500.00
47 Gas elpiji kg 8,800.00
48 Grendel pintu / jendela bh 5,500.00
49 Gypsum board lbr 50,000.00
50 GRC tebal 4 mm lbr 53,000.00
51 Hampelas lbr 4,000.00
52 Kaca nako tebal 5 mm berikut teralis bh 11,400.00
53 Kaca polos tebal 3 mm m2 63,250.00
54 Kaca polos tebal 5 mm m2 75,000.00
55 Kait angin bh 9,500.00
56 Kunci gembok bh 17,000.00
57 Kunci pintu ukuran besar bh 125,000.00
58 Kunci pintu ukuran sedang bh 85,000.00
59 Kunci dan daun pintu dari fiber bh 350,000.00
60 Kusen Alumunium 3" warna natural m' 55,000.00
61 Kusen Alumunium 3" warna coklat dop m' 60,000.00
62 Kusen Alumunium 3" warna coklat kilap m' 75,000.00
63 Kusen Alumunium 4" warna natural m' 60,000.00
64 Kusen Alumunium 4" warna coklat dop m' 65,000.00
65 Kusen Alumunium 4" warna coklat kilap m' 85,000.00
66 Langko - langko kuda - kuda bh 18,000.00
67 Lantai granit 40 x 40 cm ex. Essenza bh 43,500.00
68 Lantai granit 40 x 40 cm ex. Granito bh 42,000.00
69 Lantai granit 60 x 60 cm ex. Granito bh 46,800.00
70 Lantai keramik uk. 10 x 20 cm bh 950.00
71 Lantai keramik uk. 20 x 20 cm bh 1,650.00
72 Lantai keramik uk. 30 x 30 cm bh 3,650.00
73 Lantai keramik uk. 40 x 40 cm ( putih polos ) bh 6,900.00
74 Lantai terakota 20 x 5 cm bh 4,400.00
NO URAIAN BAHAN/MATERIAL SAT. HARGA KET
KESEPAKATAN
75 Lem kayu ltr 30,000.00
76 Lemkra/zat addictive kg 15,000.00
77 Lemkra Just Do It kg 4,500.00
78 Lemkra FS Nat kg 15,850.00
79 List kayu B.3 ( lebar sisi 3 cm ) m' 4,400.00
80 List kayu B.4 ( lebar sisi 4 cm ) m' 4,800.00
81 List keliling gypsum lebar 7 cm m' 6,250.00
82 List keliling gypsum lebar 10 cm m' 7,250.00
83 List keliling gypsum lebar 12 cm m' 8,750.00
84 List drop m' 8,900.00
85 Melamin / folywood lbr 88,500.00
86 Mozaik uk. 20 x 20 cm bh 1,900.00
87 Multiplex tebal 15 mm m2 272,000.00
88 Paku biasa 1/2" - 1" kg 15,000.00
89 Paku biasa 2" - 5" kg 12,500.00
90 Paku pancing 60 x 230 bh 825.00
91 Paku sekrup 3" - 5 " bh 400.00
92 Paku ulir bh 150.00
93 Plamir kayu / kualitas 1 kg 17,500.00
94 Plamir tembok kg 25,000.00
95 Plester Mutiara kg 8,700.00
96 Polycarbonate m2 115,000.00
97 Plywood lbr 92,250.00
98 Portland Cement ( PC ) zak 61,000.00
99 Rubber joint 25x10x5 bh 175,000.00
100 Roster / batu kerawang bh 2,600.00
101 Semen portland kg 1,220.00
102 Semen warna kg 11,000.00
103 Seng BJLS 30 L. 90 cm m2 32,500.00
104 Seng gelombang 3' - 6 " BJLS 30 lbr 42,000.00
105 Sirlak kg 19,500.00
106 Spirtus ltr 11,000.00
107 Skim Coat kg 4,400.00
108 Taekwood 4 mm 1200 x 2400 mm lbr 90,000.00
109 Taekwood 4 mm 900 x 2400 mm lbr 75,000.00
110 Ter kayu kg 14,500.00
111 Thermoplastic Glass beat kg 23,000.00
112 Tiner / minyak cat ltr 9,200.00
113 Triplek 3 mm lbr 45,000.00
114 Triplek 4 mm lbr 55,000.00
115 Triplek 6 mm lbr 75,000.00
116 Triplek 9 mm lbr 95,000.00
117 Triplek 12 mm lbr 200,000.00
118 TG 302 kg 46,500.00
119 Ubin abu2 kepala basah 20 x 20 cm bh 2,000.00
120 Ubin abu2 kepala basah 30 x 30 cm bh 2,500.00
121 Ubin wafel ukuran 20 x 20 cm bh 2,000.00
122 Ubin warna 20 x 20 cm bh 2,300.00
123 Ubin warna 30 x 30 cm bh 2,900.00
124 Washtafel bh 686,000.00
125 Woodplank bh 59,500.00
126 Zincalume m2 70,000.00
127 Rangka plafon memakai Hollow dengan penutup GRC tebal 4 mm + pengecatan m2 88,200.00
128 Rangka atap baja ringan
a. Atap Baja Ringan memakai Genteng Keramik/Plentong ( jarak reng 22-28 cm)
- Atap Baja Ringan Pelana Bentang < 9 m Zinc-Alumunium G.550 m2 165,000.00
- Atap Baja Ringan Perisai Bentang < 9 m Zinc-Alumunium G.550 m2 175,000.00
- Atap Baja Ringan Joglo Bentang < 9 m Zinc-Alumunium G.550 m2 185,000.00
- Atap Baja Ringan Pelana Bentang 10-12 m Zinc-Alumunium G.550 m2 175,000.00
- Atap Baja Ringan Perisai Bentang 10-12 m Zinc-Alumunium G.550 m2 190,000.00
- Atap Baja Ringan Joglo Bentang 10-12 m Zinc-Alumunium G.550 m2 200,000.00
- Atap Baja Ringan Pelana Bentang > 12 m Zinc-Alumunium G.550 m2 190,000.00
- Atap Baja Ringan Perisai Bentang > 12 m Zinc-Alumunium G.550 m2 200,000.00
- Atap Baja Ringan Joglo Bentang > 12 m Zinc-Alumunium G.550 m2 210,000.00
b. Atap Baja Ringan Genteng Metal/Spandek ( jarak reng 37,5-90 cm)
- Atap Baja Ringan Pelana Bentang < 9 m Zinc-Alumunium G.550 m2 155,000.00
- Atap Baja Ringan Perisai Bentang < 9 m Zinc-Alumunium G.550 m2 162,500.00
- Atap Baja Ringan Joglo Bentang < 9 m Zinc-Alumunium G.550 m2 170,000.00
- Atap Baja Ringan Pelana Bentang 10-12 m Zinc-Alumunium G.550 m2 160,000.00
- Atap Baja Ringan Perisai Bentang 10-12 m Zinc-Alumunium G.550 m2 175,000.00
- Atap Baja Ringan Joglo Bentang 10-12 m Zinc-Alumunium G.550 m2 185,000.00
- Atap Baja Ringan Pelana Bentang > 12 m Zinc-Alumunium G.550 m2 170,000.00
- Atap Baja Ringan Perisai Bentang > 12 m Zinc-Alumunium G.550 m2 180,000.00
- Atap Baja Ringan Joglo Bentang > 12 m Zinc-Alumunium G.550 m2 190,000.00
NO URAIAN BAHAN/MATERIAL SAT. HARGA KET
KESEPAKATAN
129 Pintu Air Sorong
- Pintu Air Sorong Baja B = 0.40-0.60 ( 1 drat stang tanpa roda gigi ) Unit 8,497,000.00
- Pintu Air Sorong Baja B = 0.70-0.80 ( 1 drat stang tanpa roda gigi ) Unit 9,639,000.00
- Pintu Air Sorong Baja B = 0.90-1.00 ( 1 drat stang tanpa roda gigi ) Unit 13,500,000.00
- Pintu Air Sorong Baja B = 0.70-1.00 ( 1 drat stang + roda gigi ) Unit 11,414,000.00
- Pintu Air Sorong Baja B = 1.00-1.10 ( 2 drat stang + roda gigi ) Unit 25,366,000.00
- Pintu Air Sorong Baja B = 1.50-1.80 ( 2 drat stang + roda gigi ) Unit 38,049,000.00
- Pintu Air Sorong Baja B = 2.00-2.50 ( 2 drat stang + roda gigi ) Unit 50,732,000.00
130 Gigi Payung / Jantung Besar bh 1,250,000.00
131 Gigi Payung / Jantung Sedang bh 1,100,000.00
132 Gigi Piring Besar bh 2,930,000.00
133 Gigi Piring Sedang bh 1,903,000.00
134 Blok Laher bh 1,750,000.00
135 Bron mur drat 5 " bh 3,250,000.00
136 Bron mur drat 3 " bh 2,150,000.00
137 Drat stang 2" x 100 bh 2,500,000.00
138 Drat stang 3/4" x 100 bh 1,750,000.00
139 Drat stang 1,5" x 100 bh 1,550,000.00
140 Dudukan as horisontal bh 1,850,000.00
141 As Horisontal bh 1,850,000.00
142 Karet sel 8 x 3 cm bh 1,500,000.00
143 As Pemutar bh 750,000.00
144 Laher/Bearing bh 350,000.00
145 Engkel Kemudi Sedang bh 450,000.00
146 Daun Pintu B.50, H.50 bh 1,000,000.00
147 Pintu Klep B=0,5 m unit 1,750,000.00
148 Pintu Klep B=1,0 m unit 3,000,000.00
149 Pintu Klep B=1,5 m unit 4,500,000.00

V. ASPAL
1 Aspal kemasan kg 10,785.00
2 Aspal curah kg 9,930.00

VI. MINYAK
1 Premium liter 4,500.00
2 Premium (non subsidi) liter 9,950.00
3 Solar liter 4,500.00
4 Solar (non subsidi) liter 8,500.00
5 Minyak tanah liter 9,000.00
6 Olie SAE 20, 40, 60, 80 dan 120 liter 35,000.00
7 Pelumas bekisting liter 10,000.00
8 Stempet kg 25,000.00

VII.CETAKAN
1 Bata merah bh 600.00
2 Bata berongga bh 2,250.00
3 Genteng glazuur turbo ex Jatiwangi bh 2,500.00
4 Genteng nok/bubung diglazuur ex Jatiwangi bh 3,500.00
5 Genteng nok/bubung press mesin ex Jatiwangi bh 2,200.00
6 Genteng nok/bubung press tangan ex Jatiwangi bh 2,000.00
7 Genteng nok/bubung morando diglazuur bh 4,500.00
8 Genteng nok/bubung morando bh 4,000.00
9 Genteng press diglazuur ex Jatiwangi bh 2,000.00
10 Genteng press mesin ex Jatiwangi bh 1,900.00
11 Genteng press tangan ex Jatiwangi bh 1,400.00
12 Genteng Type Viktoria bh 9,000.00
13 Genteng nok/bubung Type Viktoria bh 12,500.00
14 Genteng nok/bubung ujung Type Viktoria bh 20,000.00
15 Genteng nok/bubung ujung pertigaan Type Viktoria bh 25,000.00
16 Genteng beton bh 5,000.00
17 Genteng metal m2 75,000.00
18 Gorong-gorong buis beton dia. 100 cm bh/0,5 m' 120,000.00
19 Gorong-gorong buis beton dia. 80 cm bh/0,5 m' 100,000.00
20 Gorong-gorong buis beton dia. 60 cm bh/m' 70,000.00
21 Gorong-gorong buis beton dia. 40 cm bh/m' 60,000.00
22 Gorong-gorong buis beton dia. 30 cm bh/m' 50,000.00
23 Gorong-gorong buis beton dia. 20 cm bh/m' 40,000.00
24 Gravel dia. 60 cm bh 38,000.00
25 Gravel dia. 40 cm bh 35,000.00
26 Gravel dia. 20 cm bh 20,000.00
27 Nok steel gelombang 1050 x 5 mm m' 23,000.00
28 Nok steel gelombang 920 x 5 mm m' 22,500.00
29 Nok / bubung genteng beton bh 6,000.00
30 Paving Block K.175 Segi Enam bh 1,500.00
31 Paving Block K.175 Persegi bh 2,000.00
32 Paving Block K.125 Segi Enam bh 1,250.00
NO URAIAN BAHAN/MATERIAL SAT. HARGA KET
KESEPAKATAN
33 Paving Block K.125 Persegi bh 1,600.00
34 Digital printing m2 25,000.00
NO URAIAN BAHAN/MATERIAL SAT. HARGA KET
KESEPAKATAN
VIII. KAYU
1 Bambu Ø6 - Ø8 / 6 m btg 14,000.00
2 Kayu deplank 8/20 - 4 m (Jati Jateng) m3 8,000,000.00
3 Kayu deplank 8/20 - 4 m (Balau) m3 7,500,000.00
4 Kayu deplank 8/20 - 4 m (Borneo) m3 4,500,000.00
5 Kayu dolken O 8 - 10 /4 m btg 57,000.00
6 Kayu dolken O 12 - 15 /4 m btg 60,000.00
7 Kayu dolken O 5 /3 m btg 35,000.00
8 Kayu hutan/kayu perancah acuan m3 4,255,000.00
9 Kayu kamper m3 8,200,000.00
10 Kayu kaso 5/7 meranti m3 5,000,000.00
11 Kayu kaso 5/7 meranti btg 79,000.00
12 Kayu kruing m3 7,274,000.00
13 Kayu lanan m3 6,546,000.00
14 Kayu meranti m3 5,000,000.00
15 Kayu jati Jabar m3 7,500,000.00
16 Kayu Balau m3 7,500,000.00
17 Kayu Borneo m3 4,500,000.00
18 Kayu bakar m3 90,000.00
19 Reng kayu borneo ukuran 2/3 cm btg 54,000.00
20 Tali Ijuk kg 9,000.00

B. UPAH
1 Mandor /hari 70,000.00
2 Kepala tukang /hari 65,000.00
3 Tukang kayu / besi /hari 60,000.00
4 Tukang batu /hari 60,000.00
5 Pembantu tukang /hari 50,000.00
6 Operator terlatih /hari 60,000.00
7 Operator kurang terlatih /hari 55,000.00
8 Pembantu operator /hari 50,000.00
9 Supir truk /hari 55,000.00
10 Pembantu supir /hari 50,000.00
11 Buruh lapangan terlatih /hari 55,000.00
12 Buruh lapangan kurang terlatih /hari 50,000.00
13 Buruh lapangan tak terlatih / pekerja /hari 50,000.00

DINAS BINA MARGA DINAS PENGELOLAAN SUMBER DAYA AIR


KABUPATEN CIREBON DINAS CIPTA KARYA DAN TATA RUANG DAN PERTAMBANGAN KAB.CIREBON
KABUPATEN CIREBON Kepala Seksi Perencanaan Teknik
Kepala Seksi Desain Teknik
Jalan dan Jembatan Kepala Seksi Bangunan Gedung

SUPARMAN,S.Sos, ST Ir. DAWUD


NIP. 19721230 199901 1 001 YEDI ADHI PRIATNA, BAE, S.Sos NIP. 19640525 199303 1 007
NIP. 19660815 199803 1 004
Kepala Bidang Bina Teknik Kepala Bidang Bina Teknik
Kepala Bidang Bangunan Gedung, Perumahan dan
Permukiman

RACHMAT S, BE AGUNG GUMILANG, SS., M.si


NIP. 19571008 198709 1 001 Ir. FELLYANTO TAMZIL, MM NIP. 19711224 199803 1 004
NIP. 19620428 199003 1 006
Kepala Dinas Bina Marga Kepala Dinas Pengelolaan Sumber Daya Air
Kabupaten Cirebon Kepala Dinas Cipta Karya dan Tata Ruang dan Pertambangan Kabupaten Cirebon
Kabupaten Cirebon

Ir. AVIP SUHERDIAN, MT DEDI NURUL SUDJUDI A


NIP. 19640827 199303 1 006 NIP. 19590721 198303 1 009
Ir. H. ARIEF BUDI PRAYITNO
NIP. 19620428 199003 1 006
DAFTAR KESEPAKATAN HARGA SATUAN BAHAN / MATERIAL DAN UPAH
DINAS BINA MARGA, DINAS PENGELOLAAN SUMBER DAYA AIR & PERTAMBANGAN
DAN DINAS CIPTA KARYA & TATA RUANG
KABUPATEN CIREBON
TAHUN ANGGARAN 2014

NO URAIAN BAHAN/MATERIAL SAT. HARGA KET


KESEPAKATAN
A. BAHAN :
I. BATU
1 Abu Batu m3 172,500.00
2 Agregat kasar m3 203,000.00
3 Agregat halus m3 203,000.00
4 Atras ( tanah urug ) m3 125,000.00
5 Base course A m3 175,000.00
6 Base course B m3 165,800.00
7 Batu apung kg 4,300.00
8 Batu belah 10/15 cm m3 153,000.00
9 Batu belah 15/20 cm m3 153,000.00
10 Batu pecah mesin 0.5-1 cm m3 180,000.00
11 Batu pecah mesin 1-2 cm m3 180,000.00
12 Batu pecah mesin 2-3 cm m3 190,000.00
13 Batu tempel Palimanan 10 X 20 bh 1,500.00
14 Batu tempel kapur tekstur tidak rata bh 2,000.00
15 Chipping m3 203,000.00
16 Filler kg 90.00
17 Kapur bakar m3 70,000.00
18 Kapur Sirih kg 2,000.00
19 Kerikil m3 65,000.00

II. PASIR
1 Pasir beton m3 178,000.00
2 Pasir aspal m3 150,000.00
3 Pasir pasang m3 145,000.00
4 Pasir urug m3 140,000.00
5 Sirtu m3 140,000.00
6 Sirtu tersaring m3 145,000.00
7 Tanah urug pilhan m3 125,000.00
8 Tanah urug biasa m3 100,000.00
III. BESI / PIPA / KAWAT
1 Besi WF/Besi Profil kg 12,500.00
2 Besi strip kg 12,500.00
3 Besi beton kg 11,000.00
4 Besi stainless dia. 0,5" m' 38,000.00
5 Besi stainless dia. 1" m' 60,000.00
6 Besi stainless dia. 1,5" m' 75,000.00
7 Besi stainless dia. 2" m' 80,000.00
8 Besi stainless dia. 2,5" m' 125,000.00
9 Besi stainless dia. 3" m' 152,000.00
10 Besi galvanis dia. 0.5" m' 25,000.00
11 Besi galvanis dia. 1" m' 27,000.00
12 Besi galvanis dia. 1.5" m' 45,000.00
13 Besi galvanis dia. 2" m' 57,000.00
14 Besi galvanis dia. 2.5" m' 80,500.00
15 Besi galvanis dia. 3" m' 96,000.00
16 Besi biasa dia. 2" btg 250,000.00
17 Besi biasa dia. 3" btg 310,000.00
18 Dop besi Ø 3 " bh 60,000.00
19 Kawat beton / Kawat tali kg 18,000.00
20 Kawat bronjong dia. 4 mm kg 20,000.00
21 Kawat galvanis dia. 4 mm kg 20,000.00
22 Kawat galvanis dia. 6 mm kg 24,000.00
23 Kawat duri m' 14,000.00
24 Pipa besi galvanis 2" btg 324,000.00
25 Pipa besi galvanis 3" btg/6m' 500,000.00
26 Pipa PVC Ø 2" S-12,5 ( 8 - 10 bar ) m' 26,300.00
27 Pipa PVC Ø 3" S-12,5 ( 8 - 10 bar ) m' 53,600.00
28 Pipa PVC / paralon 2 inch btg 65,000.00
29 Pipa PVC / paralon 3 inch btg 90,000.00
30 Pipa Reducer PVC Ø 3"-4" bh 6,000.00
NO URAIAN BAHAN/MATERIAL SAT. HARGA KET
KESEPAKATAN
31 Pipa Knee/bend PVC Ø 3" bh 6,000.00
32 Plat baja tebal 5 mm - 20 mm kg 12,650.00
33 Ram kawat harmonika m2 23,000.00
34 Socket besi O 3 " bh 45,000.00
35 Toren Penguin 250 lt bh 525,000.00
36 Toren 500 lt bh 860,000.00
37 Toren 1000 lt bh 1,450,000.00

IV. PABRIKAN / TOKO


1 Alumunium foil m2 9,000.00
2 Alumunium pelapis pintu KM Tebal 0.2 lbr 35,000.00
3 Alumunium pelapis pintu KM Tebal 0.3 lbr 50,000.00
4 Alumunium pelapis pintu KM Tebal 0.4 lbr 70,000.00
5 Asbes gelombang 1500 x 1050 x 4 mm lbr 42,500.00
6 Asbes gelombang 1800 x 920 x 4 mm lbr 32,000.00
7 Asbes gelombang 2100 x 1050 x 4 mm lbr 57,000.00
8 Asbes gelombang 2400 x 1050 x 4 mm lbr 65,000.00
9 Asbes gelombang 2700 x 1050 x 4 mm lbr 75,000.00
10 Asbes gelombang 3000 x 1050 x 4 mm lbr 85,000.00
11 Ampelas lbr 3,000.00
12 Bak mandi keramik volume 0,3 m3 bh 185,000.00
13 Bak mandi fiber 120 L bh 220,000.00
14 Batu apung kg 4,300.00
15 Baut 3/4 " bh 8,500.00
16 Baut 5/8 " bh 3,800.00
17 Baut 1/2 " bh 6,000.00
18 Baut 1/2 " panjang 30 cm bh 8,550.00
19 Beading penurunan ( PC ) gypsum m' 10,000.00
20 Beading horison gypsum m' 10,000.00
21 Cat Menie kg 20,000.00
22 Cat genteng Matex kg 48,000.00
23 Cat genteng maxilite kg 50,000.00
24 Cat penutup kayu Bee brand kg 49,000.00
25 Cat penutup kayu Vim kg 25,000.00
26 Cat penutup kayu Ftalit kg 46,000.00
27 Cat penutup kayu Avian kg 48,000.00
28 Cat penutup tembok Vinilex kg 23,000.00
29 Cat penutup tembok Metrolit kg 23,000.00
30 Cat penutup tembok catylac kg 18,600.00
31 Cat penutup tembok Q Luc kg 10,000.00
32 Cat penutup tembok Property kg 9,500.00
33 Cat penutup besi kg 45,000.00
34 Cat Sinkromat kg 80,000.00
35 Closet duduk ( mono block ) porselen merk INA bh 1,237,000.00
36 Closet duduk ( siram ) porselen merk INA bh 545,000.00
37 Closet jongkok porselen merk INA/KIA bh 140,000.00
38 Closet jongkok porselen merk Avena bh 100,000.00
39 Dempul kayu kg 18,500.00
40 Dinding keramik uk. 10 x 20 cm bh 1,000.00
41 Dinding keramik uk. 20 x 20 cm bh 2,000.00
42 Dinding keramik uk. 20 x 25 cm bh 2,200.00
43 Dinding keramik uk. 30 x 30 cm bh 4,500.00
44 Door closer bh 160,000.00
45 Daun pintu alumunium lengkap warna natural/coklat dop bh 900,000.00
46 Daun pintu alumunium lengkap warna coklat kilap bh 1,300,000.00
47 Daun jendela alumunium lengkap warna natural/coklat dop bh 350,000.00
48 Daun jendela alumunium lengkap warna coklat kilap bh 400,000.00
49 Elastomer 30x30x5 bh 550,000.00
50 Engsel jendela set 12,000.00
51 Engsel pintu set 19,000.00
52 Engsel meubeler bh 3,800.00
53 Eternit tebal 4 mm uk. 1 m x 1 m lbr 6,900.00
54 Eternit tebal 4 mm uk. 1 m x 0,5 m lbr 3,450.00
55 Flincote ltr 22,000.00
56 Loster Jati bh 25,000.00
57 Glass beat kg 20,000.00
58 Glass Block bh 17,500.00
59 Gas elpiji kg 8,800.00
60 Grendel pintu / jendela bh 5,500.00
61 Gypsum board lbr 52,500.00
62 GRC tebal 4 mm lbr 52,500.00
63 Fiber Gelombang 180 x80 lbr 40,000.00
64 Kaca nako tebal 5 mm berikut teralis bh 11,400.00
65 Kaca polos tebal 3 mm m2 63,250.00
66 Kaca polos tebal 5 mm m2 75,000.00
67 Kaca polos tebal 5 mm ryben m2 80,000.00
68 Kait angin bh 7,500.00
69 Kran air Onda bh 12,000.00
70 Kunci gembok bh 20,000.00
NO URAIAN BAHAN/MATERIAL SAT. HARGA KET
KESEPAKATAN
71 Kunci pintu ukuran besar bh 125,000.00
72 Kunci pintu ukuran sedang bh 85,000.00
73 Kunci dan daun pintu dari fiber bh 350,000.00
74 Kusen Alumunium 3" warna natural m' 60,000.00
75 Kusen Alumunium 3" warna coklat dop m' 65,000.00
76 Kusen Alumunium 3" warna coklat kilap m' 70,000.00
77 Kusen Alumunium 4" warna natural m' 65,000.00
78 Kusen Alumunium 4" warna coklat dop m' 70,000.00
79 Kusen Alumunium 4" warna coklat kilap m' 75,000.00
80 Kusen Alumunium 3" YKK m' 100,000.00
81 Kusen Alumunium 4" YKK m' 1,300,000.00
82 Langko - langko kuda - kuda bh 18,000.00
83 Lantai granit 60 x 60 cm ex. Granito corak bh 57,600.00
84 Lantai granit 60 x 60 cm ex. Granito polos bh 84,600.00
85 Lantai granit 40 x 40 cm ex. Essenza bh 43,500.00
86 Lantai granit 40 x 40 cm ex. Granito bh 42,000.00
87 Lantai granit 60 x 60 cm ex. Granito bh 46,800.00
88 Lantai keramik uk. 10 x 20 cm bh 1,000.00
89 Lantai keramik uk. 20 x 20 cm bh 2,000.00
90 Lantai keramik uk. 30 x 30 cm bh 2,200.00
91 Lantai keramik uk. 40 x 40 cm ( putih polos ) bh 4,500.00
92 Lantai terakota 20 x 5 cm bh 4,400.00
93 Lem kayu ltr 30,000.00
94 Lemkra/zat addictive kg 15,000.00
95 Lemkra Just Do It kg 4,500.00
96 Lemkra FS Nat kg 15,850.00
97 List kayu B.3 ( lebar sisi 3 cm ) m' 4,400.00
98 List kayu B.4 ( lebar sisi 4 cm ) m' 4,800.00
99 List keliling gypsum lebar 7 cm m' 14,000.00
100 List keliling gypsum lebar 10 cm m' 16,000.00
101 List keliling gypsum lebar 12 cm m' 18,000.00
102 List drop m' 8,900.00
103 Melamin / folywood lbr 88,500.00
104 Mozaik uk. 20 x 20 cm bh 1,900.00
105 Multiplex tebal 12 mm lbr 175,000.00
106 Multiplex tebal 15 mm lbr 275,000.00
107 Paku biasa 1/2" - 1" kg 16,000.00
108 Paku biasa 2" - 5" kg 13,000.00
109 Paku pancing 60 x 230 bh 825.00
110 Paku sekrup 3" - 5 " bh 400.00
111 Paku ulir bh 150.00
112 Plamir kayu / kualitas 1 kg 18,500.00
113 Plamir tembok kg 20,000.00
114 Plester Mutiara kg 8,000.00
115 Pintu kamer mandi fiber polos Daimaru bh 175,000.00
116 Pintu kamer mandi fiber Kaca Daimaru bh 245,000.00
117 Pintu kamer mandi Almunium Kettler bh 700,000.00
118 Polycarbonate m2 115,000.00
119 Plywood lbr 92,250.00
120 Portland Cement ( PC ) tiga roda zak 63,000.00
121 Portland Cement ( PC ) holcim zak 62,500.00
122 Portland Cement ( PC ) gresik zak 61,000.00
123 Rubber joint 25x10x5 bh 175,000.00
124 Roster / batu kerawang bh 4,000.00
125 Semen portland kg 1,260.00
126 Semen warna kg 6,000.00
127 Seng BJLS 30 L. 90 cm m2 38,000.00
128 Seng gelombang 3' - 6 " BJLS 30 lbr 42,000.00
129 Sirlak kg 19,500.00
130 Spirtus ltr 9,000.00
131 Skim Coat kg 4,400.00
132 Taekwood 4 mm 1200 x 2400 mm lbr 80,000.00
133 Taekwood 4 mm 900 x 2400 mm lbr 65,000.00
134 Ter kayu kg 14,500.00
135 Thermoplastic Glass beat kg 23,000.00
136 Tiner / minyak cat ltr 6,000.00
137 Triplek 3 mm lbr 45,000.00
138 Triplek 4 mm lbr 55,000.00
139 Triplek 6 mm lbr 75,000.00
140 Triplek 9 mm lbr 102,500.00
141 Triplek 12 mm lbr 200,000.00
142 Tempat cuci piring Beleza bh 400,000.00
143 Tempat cuci piring Benoti bh 175,000.00
144 Tempat cuci piring Royal bh 160,000.00
145 TG 302 kg 43,600.00
146 Washtafel bh 686,000.00
147 Woodplank corak 4 m lbr 60,000.00
148 Woodplank polos 2 m lbr 32,500.00
NO URAIAN BAHAN/MATERIAL SAT. HARGA KET
KESEPAKATAN
149 Ubin abu2 kepala basah 20 x 20 cm bh 2,000.00
150 Ubin abu2 kepala basah 30 x 30 cm bh 2,500.00
151 Ubin wafel ukuran 20 x 20 cm bh 2,000.00
152 Ubin warna 20 x 20 cm bh 2,300.00
153 Ubin warna 30 x 30 cm bh 2,900.00
154 Washtafel bh 686,000.00
155 Woodplank corak 4 m lbr 60,000.00
156 Woodplank polos 2 m lbr 32,500.00
157 Zincalume m2 75,000.00
158 Rangka plafon memakai Hollow dengan penutup GRC tebal 4 mm + pengec m2 88,200.00
159 Rangka atap baja ringan
a. Atap Baja Ringan memakai Genteng Keramik/Plentong ( jarak reng 22-28 cm)
- Atap Baja Ringan Pelana Bentang < 9 m Zinc-Alumunium G.550 m2 165,000.00
- Atap Baja Ringan Perisai Bentang < 9 m Zinc-Alumunium G.550 m2 175,000.00
- Atap Baja Ringan Joglo Bentang < 9 m Zinc-Alumunium G.550 m2 185,000.00
- Atap Baja Ringan Pelana Bentang 10-12 m Zinc-Alumunium G.550 m2 175,000.00
- Atap Baja Ringan Perisai Bentang 10-12 m Zinc-Alumunium G.550 m2 190,000.00
- Atap Baja Ringan Joglo Bentang 10-12 m Zinc-Alumunium G.550 m2 200,000.00
- Atap Baja Ringan Pelana Bentang > 12 m Zinc-Alumunium G.550 m2 190,000.00
- Atap Baja Ringan Perisai Bentang > 12 m Zinc-Alumunium G.550 m2 200,000.00
- Atap Baja Ringan Joglo Bentang > 12 m Zinc-Alumunium G.550 m2 210,000.00
b. Atap Baja Ringan Genteng Metal/Spandek ( jarak reng 37,5-90 cm)
- Atap Baja Ringan Pelana Bentang < 9 m Zinc-Alumunium G.550 m2 155,000.00
- Atap Baja Ringan Perisai Bentang < 9 m Zinc-Alumunium G.550 m2 162,500.00
- Atap Baja Ringan Joglo Bentang < 9 m Zinc-Alumunium G.550 m2 170,000.00
- Atap Baja Ringan Pelana Bentang 10-12 m Zinc-Alumunium G.550 m2 160,000.00
- Atap Baja Ringan Perisai Bentang 10-12 m Zinc-Alumunium G.550 m2 175,000.00
- Atap Baja Ringan Joglo Bentang 10-12 m Zinc-Alumunium G.550 m2 185,000.00
- Atap Baja Ringan Pelana Bentang > 12 m Zinc-Alumunium G.550 m2 170,000.00
- Atap Baja Ringan Perisai Bentang > 12 m Zinc-Alumunium G.550 m2 180,000.00
- Atap Baja Ringan Joglo Bentang > 12 m Zinc-Alumunium G.550 m2 190,000.00

160 Pintu Air Sorong


- Pintu Air Sorong Baja B = 0.40-0.60 ( 1 drat stang tanpa roda gigi ) Unit 8,497,000.00
- Pintu Air Sorong Baja B = 0.70-0.80 ( 1 drat stang tanpa roda gigi ) Unit 9,639,000.00
- Pintu Air Sorong Baja B = 0.90-1.00 ( 1 drat stang tanpa roda gigi ) Unit 13,500,000.00
- Pintu Air Sorong Baja B = 0.70-1.00 ( 1 drat stang + roda gigi ) Unit 11,414,000.00
- Pintu Air Sorong Baja B = 1.00-1.10 ( 2 drat stang + roda gigi ) Unit 25,366,000.00
- Pintu Air Sorong Baja B = 1.50-1.80 ( 2 drat stang + roda gigi ) Unit 38,049,000.00
- Pintu Air Sorong Baja B = 2.00-2.50 ( 2 drat stang + roda gigi ) Unit 50,732,000.00
161 Gigi Payung / Jantung Besar bh 1,250,000.00
162 Gigi Payung / Jantung Sedang bh 1,100,000.00
163 Gigi Piring Besar bh 2,930,000.00
164 Gigi Piring Sedang bh 1,903,000.00
165 Blok Laher bh 1,750,000.00
166 Bron mur drat 5 " bh 3,250,000.00
167 Bron mur drat 3 " bh 2,150,000.00
168 Drat stang 2" x 100 bh 2,500,000.00
169 Drat stang 3/4" x 100 bh 1,750,000.00
170 Drat stang 1,5" x 100 bh 1,550,000.00
171 Dudukan as horisontal bh 1,850,000.00
172 As Horisontal bh 1,850,000.00
173 Karet sel 8 x 3 cm bh 1,500,000.00
174 As Pemutar bh 750,000.00
175 Laher/Bearing bh 350,000.00
176 Engkel Kemudi Sedang bh 450,000.00
177 Daun Pintu B.50, H.50 bh 1,000,000.00
178 Pintu Klep B=0,5 m unit 1,750,000.00
179 Pintu Klep B=1,0 m unit 3,000,000.00
180 Pintu Klep B=1,5 m unit 4,500,000.00

V. ASPAL
1 Aspal kemasan kg 11,300.00
2 Aspal curah kg 11,100.00

VI. MINYAK
1 Premium liter 6,500.00
2 Premium (non subsidi) liter 9,600.00
3 Solar liter 6,500.00
4 Solar (non subsidi) liter 10,400.00
5 Minyak tanah liter 10,300.00
6 Olie SAE 20, 40, 60, 80 dan 120 liter 35,000.00
7 Pelumas bekisting liter 10,000.00
8 Stempet kg 25,000.00
NO URAIAN BAHAN/MATERIAL SAT. HARGA KET
KESEPAKATAN
VII.CETAKAN
1 Bata merah bh 650.00
2 Bata berongga bh 2,400.00
3 Batako bh 3,200.00
4 Genteng glazuur turbo ex Jatiwangi bh 2,500.00
5 Genteng nok/bubung diglazuur ex Jatiwangi bh 3,500.00
6 Genteng nok/bubung press mesin ex Jatiwangi bh 2,200.00
7 Genteng nok/bubung press tangan ex Jatiwangi bh 2,000.00
8 Genteng nok/bubung morando diglazuur bh 4,500.00
9 Genteng morando bh 3,500.00
10 Genteng nok/bubung morando bh 4,000.00
11 Genteng press diglazuur ex Jatiwangi bh 2,500.00
12 Genteng press mesin ex Jatiwangi bh 1,900.00
13 Genteng press tangan ex Jatiwangi bh 1,400.00
14 Genteng Type Viktoria bh 9,000.00
15 Genteng nok/bubung Type Viktoria bh 12,500.00
16 Genteng nok/bubung ujung Type Viktoria bh 20,000.00
17 Genteng nok/bubung ujung pertigaan Type Viktoria bh 25,000.00
18 Genteng beton bh 5,000.00
19 Genteng metal 70 x 80 cm lbr 48,000.00
20 Gorong-gorong buis beton dia. 100 cm bh/0,5 m' 120,000.00
21 Gorong-gorong buis beton dia. 80 cm bh/0,5 m' 100,000.00
22 Gorong-gorong buis beton dia. 60 cm bh/m' 80,000.00
23 Gorong-gorong buis beton dia. 40 cm bh/m' 60,000.00
24 Gorong-gorong buis beton dia. 30 cm bh/m' 50,000.00
25 Gorong-gorong buis beton dia. 20 cm bh/m' 40,000.00
26 Gravel dia. 60 cm bh 40,000.00
27 Gravel dia. 40 cm bh 35,000.00
28 Gravel dia. 20 cm bh 25,000.00
29 Nok steel gelombang 1050 x 5 mm m' 29,000.00
30 Nok steel gelombang 920 x 5 mm m' 22,500.00
31 Nok / bubung genteng beton bh 6,000.00
32 Paving Block K.175 Segi Enam Netural tebal 8 cm m2 62,000.00
33 Paving Block K.175 Segi Enam motif tebal 8 cm m2 64,000.00
34 Paving Block K.175 Segi Enam warna tebal 8 cm m2 69,000.00
35 Paving Block K.175 Segi Enam Netural tebal 7 cm m2 55,000.00
36 Paving Block K.175 Segi Enam motif tebal 7 cm m2 58,000.00
37 Paving Block K.175 Segi Enam warna tebal 7 cm m2 64,000.00
38 Paving Block K.175 Segi Enam Netural tebal 6 cm m2 50,000.00
39 Paving Block K.175 Segi Enam motif tebal 6 cm m2 53,000.00
40 Paving Block K.175 Segi Enam warna tebal 6 cm m2 57,000.00
41 Paving Block K.125 Segi Enam Netural tebal 6 cm bh 43,000.00
42 Paving Block K.125 Segi Enam warna tebal 6 cm bh 47,000.00
43 Digital printing m2 25,000.00
VIII. KAYU
1 Bambu Ø6 - Ø8 / 6 m btg 17,000.00
2 Kayu deplank 8/20 - 4 m (Jati Jateng) m3 8,000,000.00
3 Kayu deplank 8/20 - 4 m (Balau) m3 9,500,000.00
4 Kayu deplank 8/20 - 4 m (Borneo) m3 5,000,000.00
5 Kayu dolken O 8 - 10 /4 m btg 60,000.00
6 Kayu dolken O 12 - 15 /4 m btg 68,000.00
7 Kayu dolken O 5 /3 m btg 12,500.00
8 Kayu hutan/kayu perancah acuan m3 4,255,000.00
9 Kayu kamper m3 8,200,000.00
10 Kayu kaso 5/7 meranti m3 6,000,000.00
11 Kayu kaso 5/7 meranti btg 79,000.00
12 Kayu kruing m3 7,274,000.00
13 Kayu lanan m3 6,546,000.00
14 Kayu meranti m3 6,000,000.00
15 Kayu jati Jabar m3 8,200,000.00
16 Kayu Balau m3 9,500,000.00
17 Kayu Borneo m3 5,000,000.00
18 Kayu bakar m3 90,000.00
19 Reng kayu borneo ukuran 2/3 cm btg 54,000.00
20 Tali Ijuk kg 9,000.00
NO URAIAN BAHAN/MATERIAL SAT. HARGA KET
KESEPAKATAN
B. UPAH
1 Mandor /hari 85,000.00
2 Kepala tukang /hari 75,000.00
3 Tukang kayu / besi /hari 70,000.00
4 Tukang batu /hari 70,000.00
5 Pembantu tukang /hari 55,000.00
6 Operator terlatih /hari 100,000.00
7 Operator kurang terlatih /hari 55,000.00
8 Pembantu operator /hari 50,000.00
9 Supir truk /hari 55,000.00
10 Pembantu supir /hari 50,000.00
11 Mekanik /hari 55,000.00
12 Pembantu mekanik /hari 50,000.00
13 Buruh lapangan terlatih /hari 55,000.00
14 Buruh lapangan kurang terlatih /hari 50,000.00
15 Buruh lapangan tak terlatih / pekerja /hari 55,000.00

DINAS BINA MARGA DINAS CIPTA KARYA DAN TATA RUANG DINAS PENGELOLAAN SUMBER DAYA AIR
KABUPATEN CIREBON KABUPATEN CIREBON DAN PERTAMBANGAN KAB.CIREBON
Kepala Seksi Perencanaan Teknik
Kepala Seksi Desain Teknik Kepala Seksi Bangunan Gedung
Jalan dan Jembatan

SUPARMAN,S.Sos, ST YEDI ADHI PRIATNA, BAE, S.Sos Ir. DAWUD


NIP. 19721230 199901 1 001 NIP. 19660815 199803 1 004 NIP. 19640525 199303 1 007

Kepala Bidang Bina Teknik Kepala Bidang Bangunan Gedung, Perumahan dan Kepala Bidang Bina Teknik
Permukiman

RACHMAT S, BE Ir. FELLYANTO TAMZIL, MM AGUNG GUMILANG, SS., M.si


NIP. 19571008 198709 1 001 NIP. 19620428 199003 1 006 NIP. 19711224 199803 1 004

Kepala Dinas Bina Marga Kepala Dinas Cipta Karya dan Tata Ruang Kepala Dinas Pengelolaan Sumber Daya Air
Kabupaten Cirebon Kabupaten Cirebon dan Pertambangan Kabupaten Cirebon

Ir. AVIP SUHERDIAN, MT Ir. H. ARIEF BUDI PRAYITNO DEDI NURUL SUDJUDI A
NIP. 19640827 199303 1 006 NIP. 19620428 199003 1 006 NIP. 19590721 198303 1 009
DAFTAR KESEPAKATAN HARGA SATUAN BAHAN / MATERIAL DAN UPAH
DINAS BINA MARGA, DINAS PENGELOLAAN SUMBER DAYA AIR & PERTAMBANGAN
DAN DINAS CIPTA KARYA & TATA RUANG
KABUPATEN CIREBON
HARGA TERTINGGI TAHUN ANGGARAN 2015

kesimpulan
NO URAIAN BAHAN/MATERIAL SAT. HARGA TERTINGGI 2015 HARGA TERTINGGI 2015 harga survay
HARGA DASAR + 10 % tertinggi
A. BAHAN :
I. BATU
1 Abu Batu m3 185,850.00 204,400.00
2 Atras ( tanah urug ) m3 125,000.00 137,500.00
3 Base course A m3
4 Base course B m3
5 Batu apung kg 4,300.00 4,700.00
6 Batu belah 10/15 cm m3 175,000.00 192,500.00
7 Batu belah 15/20 cm (Krakal) m3 175,000.00 192,500.00
8 Batu pecah mesin 0.5-1 cm m3 200,000.00 220,000.00
9 Batu pecah mesin 1-2 cm m3 200,000.00 220,000.00
10 Batu pecah mesin 2-3 cm m3 200,000.00 220,000.00
11 Batu pecah mesin 3-5 cm 182,000.00 200,200.00
12 Batu tempel Palimanan 10 X 20 bh 1,500.00 1,650.00
13 Batu tempel kapur tekstur tidak rata bh 2,000.00 2,200.00
14 Chipping m3 245,300.00 269,800.00
15 Filler kg 100.00 100.00
16 Kapur bakar m3 70,000.00 77,000.00
17 Kapur Sirih kg 2,000.00 2,200.00
18 Kerikil m3 65,000.00 71,500.00

II. PASIR
1 Pasir beton m3 179,000.00 196,900.00
2 Pasir aspal m3 175,000.00 192,500.00
3 Pasir pasang m3 162,000.00 178,200.00
4 Pasir urug m3 150,000.00 165,000.00
5 Sirtu m3 145,000.00 159,500.00
6 Sirtu tersaring m3 147,000.00 161,700.00
7 Tanah urug pilhan m3 125,000.00 137,500.00
8 Tanah urug biasa m3 100,000.00 110,000.00
Tanah merah m3 112,500.00 123,750.00
III. BESI / PIPA / KAWAT
1 Besi WF/Besi Profil kg 13,750.00 15,125.00
2 Besi strip kg 13,750.00 15,125.00
3 Besi beton kg 13,000.00 14,300.00
4 Besi stainless dia. 0,5" m' 38,000.00 41,800.00
5 Besi stainless dia. 1" m' 60,000.00 66,000.00
6 Besi stainless dia. 1,5" m' 75,000.00 82,500.00
7 Besi stainless dia. 2" m' 80,000.00 88,000.00
8 Besi stainless dia. 2,5" m' 125,000.00 137,500.00
9 Besi stainless dia. 3" m' 152,000.00 167,200.00
10 Besi galvanis dia. 0.5" m' 25,000.00 27,500.00
11 Besi galvanis dia. 1" m' 27,000.00 29,700.00
12 Besi galvanis dia. 1.5" m' 45,000.00 49,500.00
13 Besi galvanis dia. 2" m' 57,000.00 62,700.00
14 Besi galvanis dia. 2.5" m' 80,500.00 88,550.00
15 Besi galvanis dia. 3" m' 84,000.00 92,400.00
16 Besi biasa dia. 2" btg 250,000.00 275,000.00
17 Besi biasa dia. 3" btg 310,000.00 341,000.00
18 Dop besi Ø 3 " bh 60,000.00 66,000.00
19 Kawat beton / Kawat tali kg 18,000.00 19,800.00
20 Kawat bronjong pabrikan dia. 3 mm (uk 2x1x0.5) unit 388,080.00 426,888.00
21 Kawat bronjong dia. 4 mm kg 20,000.00 22,000.00
22 Kawat galvanis dia. 4 mm kg 20,000.00 22,000.00
23 Kawat galvanis dia. 6 mm kg 24,000.00 26,400.00
24 Kawat duri m' 14,000.00 15,400.00
25 Pipa besi galvanis 2" btg/6m' 324,000.00 356,400.00
26 Pipa besi galvanis 3" btg/6m' 500,000.00 550,000.00
27 Pipa PVC Ø 2" S-12,5 ( 8 - 10 bar ) m' 26,300.00 28,900.00
28 Pipa PVC Ø 3" S-12,5 ( 8 - 10 bar ) m' 53,600.00 58,900.00
29 Pipa PVC / paralon 2 inch btg 69,000.00 75,900.00
30 Pipa PVC / paralon 3 inch btg 90,000.00 99,000.00
31 Pipa Reducer PVC Ø 3"-4" bh 6,000.00 6,600.00
kesimpulan
NO URAIAN BAHAN/MATERIAL SAT. HARGA TERTINGGI 2015 HARGA TERTINGGI 2015 harga survay
HARGA DASAR + 10 % tertinggi
32 Pipa Knee/bend PVC Ø 3" bh 6,000.00 6,600.00
33 Plat baja tebal 5 mm - 20 mm kg 13,000.00 14,300.00
34 Ram kawat harmonika m2 25,000.00 27,500.00
35 Socket besi O 3 " bh 45,000.00 49,500.00
36 Toren Penguin 250 lt bh 525,000.00 577,500.00
37 Toren 500 lt bh 860,000.00 946,000.00
38 Toren 1000 lt bh 1,450,000.00 1,595,000.00
39 Sling Ø 32 mm m 300,000.00 330,000.00
40 Sling Ø 16 mm m 175,000.00 192,500.00
41 Klem sling Ø 32 mm set 250,000.00 275,000.00
42 Warfel / jarum keras Ø 32 mm bh 200,000.00 220,000.00
43 Causen sling Ø 32 mm bh 85,000.00 93,500.00
44 Klem kokat sling Ø 32 mm bh 210,000.00 231,000.00
45 Segel sling Ø 32 mm bh 250,000.00 275,000.00
46 Warfel sling Ø 16 mm bh 135,000.00 148,500.00
47 Segel sling Ø 16 mm bh 140,000.00 154,000.00
48 Klem kokat sling Ø 16 mm bh 35,000.00 38,500.00
49 Causen sling Ø 16 mm bh 50,000.00 55,000.00
50 Jarum keras Ø 16 mm bh 75,000.00 82,500.00

IV. PABRIKAN / TOKO


1 Alumunium foil m2 9,000.00 9,900.00
2 Alumunium pelapis pintu KM Tebal 0.2 lbr 35,000.00 38,500.00
3 Alumunium pelapis pintu KM Tebal 0.3 lbr 50,000.00 55,000.00
4 Alumunium pelapis pintu KM Tebal 0.4 lbr 70,000.00 77,000.00
5 Asbes gelombang 1500 x 1050 x 4 mm lbr 42,500.00 46,750.00
6 Asbes gelombang 1800 x 920 x 4 mm lbr 32,000.00 35,200.00
7 Asbes gelombang 2100 x 1050 x 4 mm lbr 57,000.00 62,700.00
8 Asbes gelombang 2400 x 1050 x 4 mm lbr 65,000.00 71,500.00
9 Asbes gelombang 2700 x 1050 x 4 mm lbr 75,000.00 82,500.00
10 Asbes gelombang 3000 x 1050 x 4 mm lbr 85,000.00 93,500.00
11 Ampelas lbr 3,000.00 3,300.00
12 Bak mandi keramik volume 0,3 m3 bh 185,000.00 203,500.00
13 Bak mandi fiber 120 L bh 220,000.00 242,000.00
14 Batu apung kg 4,300.00 4,700.00
15 Baut 3/4 " bh 6,700.00 7,300.00
16 Baut 5/8 " bh 6,700.00 7,300.00
17 Baut 1/2 " bh 6,000.00 6,600.00
18 Baut 1/2 " panjang 30 cm bh 8,550.00 9,400.00
19 Baut lawa-lawa 12 cm 13,000.00 14,300.00
20 Beading penurunan ( PC ) gypsum m' 10,000.00 11,000.00
21 Beading horison gypsum m' 10,000.00 11,000.00
22 Cat Menie kg 25,000.00 27,500.00
23 Cat genteng Matex kg 48,000.00 52,800.00
24 Cat genteng maxilite kg 50,000.00 55,000.00
25 Cat penutup kayu Bee brand kg 49,000.00 53,900.00
26 Cat penutup kayu Vim kg 25,000.00 27,500.00
27 Cat penutup kayu Ftalit kg 46,000.00 50,600.00
28 Cat penutup kayu Avian kg 48,000.00 52,800.00
29 Cat penutup tembok Vinilex kg 25,000.00 27,500.00
30 Cat penutup tembok Metrolit kg 23,000.00 25,300.00
31 Cat penutup tembok catylac kg 18,600.00 20,400.00
32 Cat penutup tembok Q Luc kg 10,000.00 11,000.00
33 Cat penutup tembok Property kg 9,500.00 10,450.00
34 Cat penutup besi kg 52,000.00 57,200.00
35 Cat Sinkromat kg 90,000.00 99,000.00
36 Closet duduk ( mono block ) porselen merk INA bh 1,237,000.00 1,360,700.00
37 Closet duduk ( siram ) porselen merk INA bh 545,000.00 599,500.00
38 Closet jongkok porselen merk INA/KIA bh 140,000.00 154,000.00
39 Closet jongkok porselen merk Avena bh 100,000.00 110,000.00
40 Dempul kayu kg 18,500.00 20,350.00
41 Dinding keramik uk. 10 x 20 cm bh 1,000.00 1,100.00
42 Dinding keramik uk. 20 x 20 cm bh 2,000.00 2,200.00
43 Dinding keramik uk. 20 x 25 cm bh 2,200.00 2,400.00
44 Dinding keramik uk. 30 x 30 cm bh 4,500.00 4,950.00
45 Door closer bh 160,000.00 176,000.00
46 Daun pintu alumunium lengkap warna natural/coklat dop bh 900,000.00 990,000.00
47 Daun pintu alumunium lengkap warna coklat kilap bh 1,300,000.00 1,430,000.00
48 Daun jendela alumunium lengkap warna natural/coklat do bh 350,000.00 385,000.00
49 Daun jendela alumunium lengkap warna coklat kilap bh 400,000.00 440,000.00
50 Elastomer 30x30x5 bh 632,500.00 695,750.00
51 Engsel jendela set 12,000.00 13,200.00
52 Engsel pintu set 19,000.00 20,900.00
53 Engsel meubeler bh 3,800.00 4,200.00
54 Eternit tebal 4 mm uk. 1 m x 1 m lbr 6,900.00 7,600.00
55 Eternit tebal 4 mm uk. 1 m x 0,5 m lbr 3,450.00 3,800.00
56 Flincote ltr 22,000.00 24,200.00
57 Loster Jati bh 25,000.00 27,500.00
58 Glass beat kg 25,000.00 27,500.00
59 Glass Block bh 17,500.00 19,250.00
60 Gas elpiji kg 8,800.00 9,700.00
61 Grendel pintu / jendela bh 5,500.00 6,000.00
62 Gypsum board lbr 52,500.00 57,750.00
63 GRC tebal 4 mm lbr 52,500.00 57,750.00
64 Fiber Gelombang 180 x80 lbr 40,000.00 44,000.00
65 Kaca nako tebal 5 mm berikut teralis bh 11,400.00 12,500.00
66 Kaca polos tebal 3 mm m2 63,250.00 69,575.00
67 Kaca polos tebal 5 mm m2 75,000.00 82,500.00
68 Kaca polos tebal 5 mm ryben m2 80,000.00 88,000.00
69 Kait angin bh 7,500.00 8,250.00
70 Kran air Onda bh 12,000.00 13,200.00
71 Kunci gembok bh 20,000.00 22,000.00
kesimpulan
NO URAIAN BAHAN/MATERIAL SAT. HARGA TERTINGGI 2015 HARGA TERTINGGI 2015 harga survay
HARGA DASAR + 10 % tertinggi
72 Kunci pintu ukuran besar bh 125,000.00 137,500.00
73 Kunci pintu ukuran sedang bh 85,000.00 93,500.00
74 Kunci dan daun pintu dari fiber bh 350,000.00 385,000.00
75 Kusen Alumunium 3" warna natural m' 60,000.00 66,000.00
76 Kusen Alumunium 3" warna coklat dop m' 65,000.00 71,500.00
77 Kusen Alumunium 3" warna coklat kilap m' 70,000.00 77,000.00
78 Kusen Alumunium 4" warna natural m' 65,000.00 71,500.00
79 Kusen Alumunium 4" warna coklat dop m' 70,000.00 77,000.00
80 Kusen Alumunium 4" warna coklat kilap m' 75,000.00 82,500.00
81 Kusen Alumunium 3" YKK m' 100,000.00 110,000.00
82 Kusen Alumunium 4" YKK m' 1,300,000.00 1,430,000.00
83 Langko - langko kuda - kuda bh 18,000.00 19,800.00
84 Lantai granit 60 x 60 cm ex. Granito corak bh 57,600.00 63,400.00
85 Lantai granit 60 x 60 cm ex. Granito polos bh 84,600.00 93,000.00
86 Lantai granit 40 x 40 cm ex. Essenza bh 43,500.00 47,850.00
87 Lantai granit 40 x 40 cm ex. Granito bh 42,000.00 46,200.00
88 Lantai granit 60 x 60 cm ex. Granito bh 46,800.00 51,500.00
89 Lantai keramik uk. 10 x 20 cm bh 1,000.00 1,100.00
90 Lantai keramik uk. 20 x 20 cm bh 2,000.00 2,200.00
91 Lantai keramik uk. 30 x 30 cm bh 2,200.00 2,400.00
92 Lantai keramik uk. 40 x 40 cm ( putih polos ) bh 4,500.00 4,950.00
93 Lantai terakota 20 x 5 cm bh 4,400.00 4,800.00
94 Lem kayu ltr 30,000.00 33,000.00
95 Lemkra/zat addictive kg 15,000.00 16,500.00
96 Lemkra Just Do It kg 4,500.00 4,950.00
97 Lemkra FS Nat kg 15,850.00 17,400.00
98 List kayu B.3 ( lebar sisi 3 cm ) m' 4,400.00 4,800.00
99 List kayu B.4 ( lebar sisi 4 cm ) m' 4,800.00 5,300.00
100 List keliling gypsum lebar 7 cm m' 14,000.00 15,400.00
101 List keliling gypsum lebar 10 cm m' 16,000.00 17,600.00
102 List keliling gypsum lebar 12 cm m' 18,000.00 19,800.00
103 List drop m' 8,900.00 9,800.00
104 Melamin / folywood lbr 88,500.00 97,350.00
105 Mozaik uk. 20 x 20 cm bh 1,900.00 2,100.00
106 Multiplex tebal 12 mm lbr 175,000.00 192,500.00
107 Multiplex tebal 15 mm lbr 275,000.00 302,500.00
108 Paku biasa 1/2" - 1" kg 18,500.00 20,350.00
109 Paku biasa 2" - 5" kg 20,000.00 22,000.00
110 Paku pancing 60 x 230 bh 825.00 900.00
111 Paku sekrup 3" - 5 " bh 400.00 450.00
112 Paku ulir bh 150.00 200.00
113 Plamir kayu / kualitas 1 kg 20,000.00 22,000.00
114 Plamir tembok kg 23,000.00 25,300.00
115 Plester Mutiara kg 8,000.00 8,800.00
116 Pintu kamer mandi fiber polos Daimaru bh 175,000.00 192,500.00
117 Pintu kamer mandi fiber Kaca Daimaru bh 245,000.00 269,500.00
118 Pintu kamer mandi Almunium Kettler bh 700,000.00 770,000.00
119 Polycarbonate m2 115,000.00 126,500.00
120 Plywood lbr 92,250.00 101,475.00
121 Portland Cement ( PC ) tiga roda zak 68,000.00 68,000.00
122 Portland Cement ( PC ) holcim zak 67,000.00 67,000.00
123 Portland Cement ( PC ) gresik zak 66,000.00 66,000.00
124 Rubber joint 25x10x5 bh 192,500.00 211,750.00
125 Joint Sealent kg 42,900.00 47,200.00
126 Expansion Cap m2 7,600.00 8,400.00
127 Polytene 125 mikron kg 27,500.00 30,250.00
128 Curing Compound Ltr 4,400.00 4,850.00
129 Roster / batu kerawang bh 4,000.00 4,400.00
130 Semen portland kg 1,360.00 1,360.00
131 Semen warna kg 6,000.00 6,000.00
132 Seng BJLS 30 L. 90 cm m2 38,000.00 41,800.00
133 Seng gelombang 3' - 6 " BJLS 30 lbr 51,000.00 56,100.00
134 Sirlak kg 19,500.00 21,450.00
135 Spirtus ltr 9,000.00 9,900.00
136 Skim Coat kg 4,400.00 4,850.00
137 Taekwood 4 mm 1200 x 2400 mm lbr 80,000.00 88,000.00
138 Taekwood 4 mm 900 x 2400 mm lbr 65,000.00 71,500.00
139 Ter kayu kg 14,500.00 15,950.00
140 Thermoplastic Glass beat kg 25,000.00 27,500.00
141 Tiner / minyak cat ltr 11,500.00 12,650.00
142 Triplek 3 mm lbr 52,000.00 57,200.00
143 Triplek 4 mm lbr 55,000.00 60,500.00
144 Triplek 6 mm lbr 83,000.00 91,300.00
145 Triplek 9 mm lbr 102,500.00 112,750.00
146 Triplek 12 mm lbr 200,000.00 220,000.00
147 Tempat cuci piring Beleza bh 400,000.00 440,000.00
148 Tempat cuci piring Benoti bh 175,000.00 192,500.00
149 Tempat cuci piring Royal bh 160,000.00 176,000.00
150 TG 302 kg 43,600.00 47,950.00
151 Washtafel bh 686,000.00 754,600.00
152 Woodplank corak 4 m lbr 60,000.00 66,000.00
153 Woodplank polos 2 m lbr 32,500.00 35,750.00
kesimpulan
NO URAIAN BAHAN/MATERIAL SAT. HARGA TERTINGGI 2015 HARGA TERTINGGI 2015 harga survay
HARGA DASAR + 10 % tertinggi
154 Ubin abu2 kepala basah 20 x 20 cm bh 2,000.00 2,200.00
155 Ubin abu2 kepala basah 30 x 30 cm bh 2,500.00 2,750.00
156 Ubin wafel ukuran 20 x 20 cm bh 2,000.00 2,200.00
157 Ubin warna 20 x 20 cm bh 2,300.00 2,550.00
158 Ubin warna 30 x 30 cm bh 2,900.00 3,200.00
159 Washtafel bh 686,000.00 754,600.00
160 Woodplank corak 4 m lbr 60,000.00 66,000.00
161 Woodplank polos 2 m lbr 32,500.00 35,750.00
162 Zincalume m2 75,000.00 82,500.00
163 Rangka plafon memakai Hollow dengan penutup GRC teb m2 88,200.00 97,000.00
164 Rangka atap baja ringan
a. Atap Baja Ringan memakai Genteng Keramik/Plentong ( jarak reng 22-28 cm)
- Atap Baja Ringan Pelana Bentang < 9 m Zinc-Alumuni m2 165,000.00 181,500.00
- Atap Baja Ringan Perisai Bentang < 9 m Zinc-Alumuni m2 175,000.00 192,500.00
- Atap Baja Ringan Joglo Bentang < 9 m Zinc-Alumuniu m2 185,000.00 203,500.00
- Atap Baja Ringan Pelana Bentang 10-12 m Zinc-Alum m2 175,000.00 192,500.00
- Atap Baja Ringan Perisai Bentang 10-12 m Zinc-Alum m2 190,000.00 209,000.00
- Atap Baja Ringan Joglo Bentang 10-12 m Zinc-Alumun m2 200,000.00 220,000.00
- Atap Baja Ringan Pelana Bentang > 12 m Zinc-Alumun m2 190,000.00 209,000.00
- Atap Baja Ringan Perisai Bentang > 12 m Zinc-Alumu m2 200,000.00 220,000.00
- Atap Baja Ringan Joglo Bentang > 12 m Zinc-Alumuni m2 210,000.00 231,000.00
b. Atap Baja Ringan Genteng Metal/Spandek ( jarak reng 37,5-90 cm)
- Atap Baja Ringan Pelana Bentang < 9 m Zinc-Alumuni m2 155,000.00 170,500.00
- Atap Baja Ringan Perisai Bentang < 9 m Zinc-Alumuni m2 162,500.00 178,750.00
- Atap Baja Ringan Joglo Bentang < 9 m Zinc-Alumuniu m2 170,000.00 187,000.00
- Atap Baja Ringan Pelana Bentang 10-12 m Zinc-Alum m2 160,000.00 176,000.00
- Atap Baja Ringan Perisai Bentang 10-12 m Zinc-Alum m2 175,000.00 192,500.00
- Atap Baja Ringan Joglo Bentang 10-12 m Zinc-Alumun m2 185,000.00 203,500.00
- Atap Baja Ringan Pelana Bentang > 12 m Zinc-Alumun m2 170,000.00 187,000.00
- Atap Baja Ringan Perisai Bentang > 12 m Zinc-Alumu m2 180,000.00 198,000.00
- Atap Baja Ringan Joglo Bentang > 12 m Zinc-Alumuni m2 190,000.00 209,000.00

165 Pintu Air Sorong


- Pintu Air Sorong Baja B = 0.40-0.60 ( 1 drat stang tanpa Unit 8,497,000.00 9,346,700.00
- Pintu Air Sorong Baja B = 0.70-0.80 ( 1 drat stang tanpa Unit 9,639,000.00 10,602,900.00
- Pintu Air Sorong Baja B = 0.90-1.00 ( 1 drat stang tanpa Unit 13,500,000.00 14,850,000.00
- Pintu Air Sorong Baja B = 0.70-1.00 ( 1 drat stang + roda Unit 11,414,000.00 12,555,400.00
- Pintu Air Sorong Baja B = 1.00-1.10 ( 2 drat stang + roda Unit 25,366,000.00 27,902,600.00
- Pintu Air Sorong Baja B = 1.50-1.80 ( 2 drat stang + roda Unit 38,049,000.00 41,853,900.00
- Pintu Air Sorong Baja B = 2.00-2.50 ( 2 drat stang + roda Unit 50,732,000.00 55,805,200.00
166 Gigi Payung / Jantung Besar bh 1,250,000.00 1,375,000.00
167 Gigi Payung / Jantung Sedang bh 1,100,000.00 1,210,000.00
168 Gigi Piring Besar bh 2,930,000.00 3,223,000.00
169 Gigi Piring Sedang bh 1,903,000.00 2,093,300.00
170 Blok Laher bh 1,750,000.00 1,925,000.00
171 Bron mur drat 5 " bh 3,250,000.00 3,575,000.00
172 Bron mur drat 3 " bh 2,150,000.00 2,365,000.00
173 Drat stang 2" x 100 bh 2,500,000.00 2,750,000.00
174 Drat stang 3/4" x 100 bh 1,750,000.00 1,925,000.00
175 Drat stang 1,5" x 100 bh 1,550,000.00 1,705,000.00
176 Dudukan as horisontal bh 1,850,000.00 2,035,000.00
177 As Horisontal bh 1,850,000.00 2,035,000.00
178 Karet sel 8 x 3 cm bh 1,500,000.00 1,650,000.00
179 As Pemutar bh 750,000.00 825,000.00
180 Laher/Bearing bh 350,000.00 385,000.00
181 Engkel Kemudi Sedang bh 450,000.00 495,000.00
182 Daun Pintu B.50, H.50 bh 1,000,000.00 1,100,000.00
183 Pintu Klep B=0,5 m unit 1,750,000.00 1,925,000.00
184 Pintu Klep B=1,0 m unit 3,000,000.00 3,300,000.00
185 Pintu Klep B=1,5 m unit 4,500,000.00 4,950,000.00

V. ASPAL
1 Aspal kemasan kg 12,100.00 12,100.00
2 Aspal curah kg 11,600.00 11,600.00
3 Aspal Emulsi ltr 10,500.00 10,500.00

VI. MINYAK
1 Premium liter 6,500.00 6,500.00
2 Premium (non subsidi) liter 11,400.00 11,400.00
3 Solar liter 5,500.00 5,500.00
4 Solar (non subsidi) liter 11,900.00 11,900.00
5 Minyak tanah liter 12,500.00 12,500.00
6 Olie SAE 20, 40, 60, 80 dan 120 liter 42,000.00 42,000.00
7 Pelumas bekisting liter 10,000.00 10,000.00
8 Stempet kg 25,000.00 25,000.00
kesimpulan
NO URAIAN BAHAN/MATERIAL SAT. HARGA TERTINGGI 2015 HARGA TERTINGGI 2015 harga survay
HARGA DASAR + 10 % tertinggi
VII.CETAKAN
1 Bata merah bh 800.00 900.00
2 Bata berongga bh 2,400.00 2,650.00
3 Batako bh 3,200.00 3,500.00
4 Genteng glazuur turbo ex Jatiwangi bh 3,500.00 3,850.00
5 Genteng nok/bubung diglazuur ex Jatiwangi bh 4,000.00 4,400.00
6 Genteng nok/bubung press mesin ex Jatiwangi bh 2,500.00 2,750.00
7 Genteng nok/bubung press tangan ex Jatiwangi bh 2,000.00 2,200.00
8 Genteng nok/bubung morando diglazuur bh 4,500.00 4,950.00
9 Genteng morando bh 3,500.00 3,850.00
10 Genteng nok/bubung morando bh 4,000.00 4,400.00
11 Genteng press diglazuur ex Jatiwangi bh 2,500.00 2,750.00
12 Genteng press mesin ex Jatiwangi bh 1,900.00 2,100.00
13 Genteng press tangan ex Jatiwangi bh 1,400.00 1,550.00
14 Genteng Type Viktoria bh 9,000.00 9,900.00
15 Genteng nok/bubung Type Viktoria bh 12,500.00 13,750.00
16 Genteng nok/bubung ujung Type Viktoria bh 20,000.00 22,000.00
17 Genteng nok/bubung ujung pertigaan Type Viktoria bh 25,000.00 27,500.00
18 Genteng beton bh 5,000.00 5,500.00
19 Genteng metal 70 x 80 cm lbr 48,000.00 52,800.00
20 Gorong-gorong buis beton dia. 100 cm bh/0,5 m' 150,000.00 165,000.00
21 Gorong-gorong buis beton dia. 80 cm bh/0,5 m' 130,000.00 143,000.00
22 Gorong-gorong buis beton dia. 60 cm bh/m' 140,000.00 154,000.00
23 Gorong-gorong buis beton dia. 40 cm bh/m' 100,000.00 110,000.00
24 Gorong-gorong buis beton dia. 30 cm bh/m' 80,000.00 88,000.00
25 Gorong-gorong buis beton dia. 20 cm bh/m' 60,000.00 66,000.00
26 Kansten Cetak 82,500.00 90,750.00
27 Gravel dia. 60 cm bh 75,000.00 82,500.00
28 Gravel dia. 40 cm bh 45,000.00 49,500.00
29 Gravel dia. 20 cm bh 35,000.00 38,500.00
30 Nok steel gelombang 1050 x 5 mm m' 29,000.00 31,900.00
31 Nok steel gelombang 920 x 5 mm m' 22,500.00 24,750.00
32 Nok / bubung genteng beton bh 6,000.00 6,600.00
33 Paving Block K.175 Segi Enam Netural tebal 8 cm m2 62,000.00 68,200.00
34 Paving Block K.175 Segi Enam motif tebal 8 cm m2 64,000.00 70,400.00
35 Paving Block K.175 Segi Enam warna tebal 8 cm m2 69,000.00 75,900.00
36 Paving Block K.175 Segi Enam Netural tebal 7 cm m2 55,000.00 60,500.00
37 Paving Block K.175 Segi Enam motif tebal 7 cm m2 58,000.00 63,800.00
38 Paving Block K.175 Segi Enam warna tebal 7 cm m2 64,000.00 70,400.00
39 Paving Block K.175 Segi Enam Netural tebal 6 cm m2 50,000.00 55,000.00
40 Paving Block K.175 Segi Enam motif tebal 6 cm m2 53,000.00 58,300.00
41 Paving Block K.175 Segi Enam warna tebal 6 cm m2 57,000.00 62,700.00
42 Paving Block K.125 Segi Enam Netural tebal 6 cm bh 43,000.00 47,300.00
43 Paving Block K.125 Segi Enam warna tebal 6 cm bh 47,000.00 51,700.00
44 Tiang pancang beton Pratekan m3 4,600,000.00 5,060,000.00
45 Digital printing m2 25,000.00 27,500.00
VIII. KAYU
1 Bambu Ø6 - Ø8 / 6 m btg 17,000.00 18,700.00
2 Kayu deplank 8/20 - 4 m (Jati Jateng) m3 9,800,000.00 10,780,000.00
3 Kayu deplank 8/20 - 4 m (Balau) m3 9,500,000.00 10,450,000.00
4 Kayu deplank 8/20 - 4 m (Borneo) m3 5,000,000.00 5,500,000.00
5 Kayu dolken O 8 - 10 /4 m btg 60,000.00 66,000.00
6 Kayu dolken O 12 - 15 /4 m btg 68,000.00 74,800.00
7 Kayu dolken O 5 /3 m btg 12,500.00 13,750.00
8 Kayu hutan/kayu perancah acuan m3 4,700,000.00 5,170,000.00
9 Kayu kamper m3 8,200,000.00 9,020,000.00
10 Kayu kaso 5/7 meranti m3 6,000,000.00 6,600,000.00
11 Kayu kaso 5/7 meranti btg 79,000.00 86,900.00
12 Kayu kruing m3 7,274,000.00 8,001,400.00
13 Kayu lanan m3 6,546,000.00 7,200,600.00
14 Kayu meranti m3 6,000,000.00 6,600,000.00
15 Kayu jati Jabar m3 8,200,000.00 9,020,000.00
16 Kayu Balau m3 9,500,000.00 10,450,000.00
17 Kayu Borneo m3 5,000,000.00 5,500,000.00
18 Kayu bakar m3 90,000.00 99,000.00
19 Reng kayu borneo ukuran 2/3 cm btg 54,000.00 59,400.00
20 Tali Ijuk kg 9,000.00 9,900.00
kesimpulan
NO URAIAN BAHAN/MATERIAL SAT. HARGA TERTINGGI 2015 HARGA TERTINGGI 2015 harga survay
HARGA DASAR + 10 % tertinggi
B. UPAH
1 Mandor /hari 85,000.00 85,000.00
2 Kepala tukang /hari 75,000.00 75,000.00
3 Tukang kayu / besi /hari 70,000.00 70,000.00
4 Tukang batu /hari 70,000.00 70,000.00
5 Pembantu tukang /hari 55,000.00 55,000.00
6 Operator terlatih /hari 100,000.00 100,000.00
7 Operator kurang terlatih /hari 55,000.00 55,000.00
8 Pembantu operator /hari 50,000.00 50,000.00
9 Supir truk /hari 55,000.00 55,000.00
10 Pembantu supir /hari 50,000.00 50,000.00
11 Mekanik /hari 55,000.00 55,000.00
12 Pembantu mekanik /hari 50,000.00 50,000.00
13 Buruh lapangan terlatih /hari 55,000.00 55,000.00
14 Buruh lapangan kurang terlatih /hari 50,000.00 50,000.00
15 Buruh lapangan tak terlatih / pekerja /hari 55,000.00 55,000.00

DINAS CIPTA KARYA DAN TATA


DINAS BINA MARGA RUANG DINAS PENGELOLAAN SUMBER DAYA AIR
KABUPATEN CIREBON KABUPATEN CIREBON DAN PERTAMBANGAN KAB.CIREBON
Kepala Seksi Perencanaan Teknik
Kepala Seksi Desain Teknik Kepala Seksi Bangunan Gedung
Jalan dan Jembatan

SUPARMAN,S.Sos, ST YEDI ADHI PRIATNA, BAE, S.Sos Ir. DAWUD


NIP. 19721230 199901 1 001 NIP. 19660815 199803 1 004 NIP. 19640525 199303 1 007

Kepala Bidang Bina Teknik Kepala Bidang Bangunan Gedung, Kepala Bidang Bina Teknik
Perumahan dan Permukiman

Ir. TETI MEIRAWATI Ir. FELLYANTO TAMZIL, MM AGUNG GUMILANG, SS., M.si
NIP. 19670502 199703 2 004 NIP. 19620428 199003 1 006 NIP. 19711224 199803 1 004

Kepala Dinas Bina Marga Kepala Dinas Cipta Karya dan Tata Kepala Dinas Pengelolaan Sumber Daya Air
Kabupaten Cirebon Ruang dan Pertambangan Kabupaten Cirebon
Kabupaten Cirebon

Ir. AVIP SUHERDIAN, MT DEDI NURUL SUDJUDI A


NIP. 19640827 199303 1 006 Ir. H. ARIEF BUDI PRAYITNO NIP. 19590721 198303 1 009
NIP. 19620428 199003 1 006
Analisa EI-311a

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 3.1.(1a)


JENIS PEKERJAAN : Galian Biasa / Kupasan (menggunakan alat berat)
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0511 #REF! #REF!


2. Mandor (L03) Jam 0.0256 #REF! #REF!

JUMLAH HARGA TENAGA #REF!

B. BAHAN

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1. Excavator (E10) Jam 0.0256 #REF! #REF!


2. Dump Truck (E08) Jam 0.3344 #REF! #REF!
3. Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN #REF!

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) #REF!


E. OVERHEAD & PROFIT 15.0 % x D #REF!
F. HARGA SATUAN PEKERJAAN ( D + E ) #REF!
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 19
Analisa EI-321.rob

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 3.2.(1).rob


JENIS PEKERJAAN : Timbunan Biasa
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0403 #REF! #REF!


2. Mandor (L02) Jam 0.0101 #REF! #REF!

JUMLAH HARGA TENAGA #REF!

B. BAHAN

1. Bahan timbunan (M08) M3 1.1100 #REF! #REF!

JUMLAH HARGA BAHAN #REF!

C. PERALATAN
1. Excavator (E10) Jam 0.0101 #REF! #REF!
2. Dump Truck (E08) Jam 0.6103 #REF! #REF!
3. Motor Grader (E13) Jam 0.0037 0.00 0.00
4 Vibro Roller (E19) Jam 0.0042 #REF! #REF!
5. Water tank truck (E23) Jam 0.0070 #REF! #REF!
6 Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN #REF!

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) #REF!


E. OVERHEAD & PROFIT 15.0 % x D #REF!
F. HARGA SATUAN PEKERJAAN ( D + E ) #REF!
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 20
Analisa EI-322.rob

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 3.2.(2).rob


JENIS PEKERJAAN : Timbunan Pilihan
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 2.4294 #REF! #REF!


2. Mandor (L03) Jam 0.6073 #REF! #REF!

JUMLAH HARGA TENAGA #REF!

B. BAHAN

1. Bahan pilihan (M09) (M09) M3 1.1100 #REF! #REF!

JUMLAH HARGA BAHAN #REF!

C. PERALATAN
1. Wheel Loader (E15) Jam 0.0085 #REF! #REF!
2. Dump Truck (E08) Jam 0.6073 #REF! #REF!
3. Motor Grader (E13) Jam 0.0040 0.00 0.00
3. Tandem (E17) Jam 0.0161 #REF! #REF!
4. Water Tanker (E23) Jam 0.0070 #REF! #REF!
5. Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN #REF!

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) #REF!


E. OVERHEAD & PROFIT 15.0 % x D #REF!
F. HARGA SATUAN PEKERJAAN ( D + E ) #REF!
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 21
Analisa EI-331.rob

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 3.3.(1).rob


JENIS PEKERJAAN : Penyiapan Badan Jalan
SATUAN PEMBAYARAN : M2

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.0024 #REF! #REF!


2. Mandor (L02) jam 0.0006 #REF! #REF!

JUMLAH HARGA TENAGA #REF!

B. BAHAN

JUMLAH HARGA BAHAN 0.00

C. PERALATAN
1. Motor Grader (E13) jam 0.0006 0.00 0.00
2. Vibro Roller (E19) jam 0.0005 #REF! #REF!
3 Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN #REF!

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) #REF!


E. OVERHEAD & PROFIT 15.0 % x D #REF!
F. HARGA SATUAN PEKERJAAN ( D + E ) #REF!
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 22
Analisa EI-611a

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 6.1 (1)(a)


JENIS PEKERJAAN : Lapis Resap Pengikat - Aspal Cair
SATUAN PEMBAYARAN : Liter

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0021 #REF! #REF!


2. Mandor (L03) Jam 0.0004 #REF! #REF!

JUMLAH HARGA TENAGA #REF!

B. BAHAN

1. Aspal (M10) Kg 0.6790 #REF! #REF!


2. Kerosene (M11) liter 0.3708 #REF! #REF!

JUMLAH HARGA BAHAN #REF!

C. PERALATAN

1. Asp. Distributor E41 Jam 0.0002 #REF! #REF!


2. Compressor E05 Jam 0.0002 #REF! #REF!

JUMLAH HARGA PERALATAN #REF!

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) #REF!


E. OVERHEAD & PROFIT 15.0 % x D #REF!
F. HARGA SATUAN PEKERJAAN ( D + E ) #REF!
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 23
Analisa EI-612a

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 6.1 (2)(a)


JENIS PEKERJAAN : Lapis Perekat - Aspal Cair
SATUAN PEMBAYARAN : Liter

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0021 #REF! #REF!


2. Mandor (L03) Jam 0.0004 #REF! #REF!

JUMLAH HARGA TENAGA #REF!

B. BAHAN

1. Aspal (M10) Kg 0.8487 #REF! #REF!


2. Kerosene (M11) liter 0.2060 #REF! #REF!

JUMLAH HARGA BAHAN #REF!

C. PERALATAN

1. Asp. Distributor E41 Jam 0.0002 #REF! #REF!


2. Compressor E05 Jam 0.0002 #REF! #REF!

JUMLAH HARGA PERALATAN #REF!

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) #REF!


E. OVERHEAD & PROFIT 15.0 % x D #REF!
F. HARGA SATUAN PEKERJAAN ( D + E ) #REF!
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 24
Analisa EI-621

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 6.2 (1)


JENIS PEKERJAAN : Agregat Penutup BURTU
SATUAN PEMBAYARAN : M2

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.2126 #REF! #REF!


2. Mandor (L02) Jam 0.0106 #REF! #REF!

JUMLAH HARGA TENAGA #REF!

B. BAHAN

1. Chipping (M41) Kg 23.0000 #REF! #REF!

JUMLAH HARGA BAHAN #REF!

C. PERALATAN

1. Wheel Loader E15 Jam 0.0106 #REF! #REF!


2. Dump Truck E08 Jam 0.0214 #REF! #REF!
3. P. Tyre Roller E18 Jam 0.0005 #REF! #REF!
4. Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN #REF!

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) #REF!


E. OVERHEAD & PROFIT 15.0 % x D #REF!
F. HARGA SATUAN PEKERJAAN ( D + E ) 19,529.97
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 25
Analisa EI-631.rob

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 6.3 (1).rob


JENIS PEKERJAAN : Latasir Kelas A (SS-A)
SATUAN PEMBAYARAN : Ton, m2

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.1406 #REF! #REF!


2. Mandor (L03) Jam 0.0201 #REF! #REF!

JUMLAH HARGA TENAGA #REF!

B. BAHAN

1. Pasir Kasar M01a M3 0.2086 #REF! #REF!


2. Pasir Halus M01c M3 0.4171 #REF! #REF!
3 Semen/Filler (M05) Kg 31.5000 #REF! #REF!
4 Aspal (M10) Kg 103.0000 #REF! #REF!

JUMLAH HARGA BAHAN #REF!

C. PERALATAN
1. Wheel Loader E15 Jam 0.0096 #REF! #REF!
2. AMP E01 Jam 0.0201 #REF! #REF!
3. Genset E12 Jam 0.0201 #REF! #REF!
4. Dump Truck (3,5 ton) E08 Jam 0.0122 #REF! #REF!
5. Asphalt Finisher E02 Jam 0.0386 - 0.00
6. Tandem Roller E17 Jam 0.0317 #REF! #REF!
7 P. Tyre Roller E18 Jam 0.0109 - 0.00
8 Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN #REF!

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) #REF!


E. OVERHEAD & PROFIT 15.0 % x D #REF!
F. HARGA SATUAN PEKERJAAN ( D + E ) #REF!
MAKA HARGA UNTUK 1 M2 #REF!
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 26
Analisa EI-632.rob

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 6.3 (2).rob


JENIS PEKERJAAN : Latasir Kelas B (SS-B)
SATUAN PEMBAYARAN : Ton, m2

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.1406 #REF! #REF!


2. Mandor (L03) Jam 0.0201 #REF! #REF!

JUMLAH HARGA TENAGA #REF!

B. BAHAN

1. Pasir Kasar (M01a) M3 0.0139 #REF! #REF!


2. Pasir Halus (M01c) M3 0.0139 #REF! #REF!
3 Semen (M05) 31.5000 #REF! #REF!
4 Aspal (M10) 92.7000 #REF! #REF!

JUMLAH HARGA BAHAN #REF!

C. PERALATAN
1. Wheel Loader E15 Jam 0.0096 #REF! #REF!
2. AMP E01 Jam 0.0201 #REF! #REF!
3. Genset E12 Jam 0.0201 #REF! #REF!
4. Dump Truck E08 Jam 0.0163 #REF! #REF!
5. Asphalt Finisher E02 Jam 0.0290 - 0.00
6. Tandem Roller E17 Jam 0.0238 #REF! #REF!
7 P. Tyre Roller E18 Jam 0.0082 - 0.00
8 Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN #REF!

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) #REF!


E. OVERHEAD & PROFIT 15.0 % x D #REF!
F. HARGA SATUAN PEKERJAAN ( D + E ) #REF!
MAKA HARGA UNTUK 1 M2 #REF!
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 27
Analisa EI-661

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 6.6.(1)


JENIS PEKERJAAN : Lapis Permukaan Penetrasi Macadam
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.1417 #REF! #REF!


2. Mandor (L03) Jam 0.0142 #REF! #REF!

JUMLAH HARGA TENAGA #REF!

B. BAHAN

1. Agregat Kasar (M03) M3 1.6690 #REF! #REF!


2. Agregat Halus (M04) M3 0.1479 #REF! #REF!
3 Aspal (M10) Kg 98.5857 #REF! #REF!

JUMLAH HARGA BAHAN #REF!

C. PERALATAN

1. Wheel Loader E15 Jam 0.0071 #REF! #REF!


2. Dump Truck E09 Jam 0.1823 #REF! #REF!
3. 3-Wheel Roller E16 Jam 0.0435 #REF! #REF!
4. Asp. Sprayer E03 Jam 0.3788 #REF! #REF!
5. Alat bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN #REF!

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) #REF!


E. OVERHEAD & PROFIT 15.0 % x D #REF!
F. HARGA SATUAN PEKERJAAN ( D + E ) #REF!
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 28
Analisa EI-662

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 6.6.(2)


JENIS PEKERJAAN : Lapis Pondasi/Perata Penetrasi Macadam
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.1417 #REF! #REF!


2. Mandor (L03) Jam 0.0142 #REF! #REF!

JUMLAH HARGA TENAGA #REF!

B. BAHAN

1. Agregat Kasar (M03) M3 1.7746 #REF! #REF!


2. Agregat Halus (M04) M3 0.2465 #REF! #REF!
3 Aspal (M10) Kg 103.0000 #REF! #REF!

JUMLAH HARGA BAHAN #REF!

C. PERALATAN

1. Wheel Loader E15 Jam 0.0071 #REF! #REF!


2. Dump Truck E09 Jam 0.1823 #REF! #REF!
3. 3-Wheel Roller E16 Jam 0.0406 #REF! #REF!
4. Asp. Sprayer E03 Jam 0.3788 #REF! #REF!
5. Alat bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN #REF!

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) #REF!


E. OVERHEAD & PROFIT 15.0 % x D #REF!
F. HARGA SATUAN PEKERJAAN ( D + E ) #REF!
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 29
Analisa EI-814

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 8.1 (4)


JENIS PEKERJAAN : Waterbound Macadam Utk. Pek. Minor
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 0.1631 #REF! #REF!


2. Mandor (L03) Jam 0.0102 #REF! #REF!

JUMLAH HARGA TENAGA #REF!

B. BAHAN

1. Agregat Kasar M3 0.9350 #REF! #REF!


2. Agregat Halus M3 0.1650 #REF! #REF!

JUMLAH HARGA BAHAN #REF!

C. PERALATAN

1. Wheel Loader E15 Jam 0.0102 #REF! #REF!


2. Dump Truck E09 Jam 0.0897 #REF! #REF!
3. 3-Wheel Roller E16 Jam 0.0268 #REF! #REF!
4. Alat BAntu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN #REF!

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) #REF!


E. OVERHEAD & PROFIT 15.0 % x D #REF!
F. HARGA SATUAN PEKERJAAN ( D + E ) #REF!
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 30
Analisa EI-817

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 8.1 (7)


JENIS PEKERJAAN : Penetrasi Macadam Utk.Pek.Minor (Perata)
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 0.1701 #REF! #REF!


2. Mandor (L03) Jam 0.0170 #REF! #REF!

JUMLAH HARGA TENAGA #REF!

B. BAHAN

1. Agregat Kasar M3 1.7556 #REF! #REF!


2. Agregat Halus M3 0.0000 #REF! #REF!
3 Aspal (M10) Kg 99.2727 #REF! #REF!

JUMLAH HARGA BAHAN #REF!

C. PERALATAN

1. Wheel Loader E15 Jam 0.0085 #REF! #REF!


2. Dump Truck E09 Jam 0.2081 #REF! #REF!
3. 3-Wheel Roller E16 Jam 0.0118 #REF! #REF!
4. Asp. Sprayer E03 Jam 0.0359 #REF! #REF!
5. Alat bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN #REF!

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) #REF!


E. OVERHEAD & PROFIT 15.0 % x D #REF!
F. HARGA SATUAN PEKERJAAN ( D + E ) #REF!
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

Sumber, 2020

IV - 31
DAFTAR SATUAN ANALISA
DINAS PERUMAHAN KAWASAN PERMUKIMAN DAN PERTANAHAN
KABUPATEN CIREBON
TAHUN ANGGARAN 2017

HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp

1 #REF! #REF! #REF!


2 #REF! #REF! #REF!
3 #REF! #REF! #REF!
4 #REF! #REF! #REF!
5 #REF! #REF! #REF!
6 #REF! #REF! #REF!
7 #REF! #REF! #REF!
8 #REF! #REF! #REF!
9 #REF! #REF! #REF!
#REF! #REF!
426 #REF! #REF! #REF!
427 #REF! #REF! #REF!
- #REF!
428 #REF! #REF! #REF!
429 #REF! #REF! #REF!
430 #REF! #REF! #REF!
431 #REF! #REF! #REF!
432 #REF! #REF! #REF!
433 #REF! #REF! #REF!
434 #REF! #REF! #REF!
435 #REF! #REF! #REF!
436 #REF! #REF! #REF!
437 #REF! #REF! #REF!
438 #REF! #REF! #REF!
439 #REF! #REF! #REF!
440 #REF! #REF! #REF!
441 #REF! #REF! #REF!
442 - #REF! #REF!
443 - #REF! #REF!
444 - #REF! #REF!
445 - #REF! #REF!
446 - #REF! #REF!
447 - #REF! #REF!
448 - #REF! #REF!
449 #REF! #REF! #REF!
JALAN LINGKUNGAN
450 Analisa EI-311a : Galian Biasa / Kupasan (menggunakan alat berat) #REF!
451 Analisa EI-321.rob : Timbunan Biasa #REF!
452 Analisa EI-322.rob : Timbunan Pilihan #REF!
453 Analisa EI-331.rob : Penyiapan Badan Jalan #REF!
454 Analisa EI-611a : Lapis Resap Pengikat - Aspal Cair #REF!
455 Analisa EI-612a : Lapis Perekat - Aspal Cair #REF!
456 Analisa EI-621 : Agregat Penutup BURTU 19,529.97
457 Analisa EI-631.rob : Latasir Kelas A (SS-A) #REF!
458 Analisa EI-632.rob : Latasir Kelas B (SS-B) #REF!
459 Analisa EI-661 : Lapis Permukaan Penetrasi Macadam #REF!
460 Analisa EI-662 : Lapis Pondasi/Perata Penetrasi Macadam #REF!
461 Analisa EI-814 : Waterbound Macadam Utk. Pek. Minor #REF!
462 Analisa EI-817 : Penetrasi Macadam Utk.Pek.Minor (Perata) #REF!

Sumber, 2017

Kepala Dinas Perumahan, Kawasan Permukiman Dan Pertanahan Kabupaten Cirebon


HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp

H. SUKMA NUGRAHA, SH.,MM.


NIP. 19610301 198603 1 012
RENCANA ANGGARAN BIAYA

Proyek : Rencana Pembangunan Masjid Jami' Darul Kirom


Lokasi : Jl. P. Antasari Blok. Galeng Duwur Kel. Kejuden Kec. Depok Kab. Cirebon
Owner : Yayasan Darul Kirom

HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME Sat.
SATUAN HARGA

A PEKERJAAN PERSIAPAN
1 Papan Proyek 1.00 Unit 858,063.00 858,063
2 Pek. Laporan & Dokumentasi 1.00 Ls 4,500,000.00 4,500,000
-
B PEKERJAAN TANAH DAN PONDASI -
1 Pek. Galian Tanah Pondasi 83.22 M3 86,130.00 7,167,739
2 Pek. Urugan Tanah Kembali 27.74 M3 205,260.00 5,693,912
3 Pek. Urugan Tanah Peninggian Peil Lantai (t = 10cm) 16.83 M3 512,831.00 8,630,946
-
- Bawah Pondasi 5.93 M3 -
- Bawah Lantai 22.76 M3 -
5 Pek. Pondasi Tapak P1 (100x100x20) -
- Beton K-225 3.20 M3 -
- Pembesian 500.68 Kg -
- Bekisting 19.20 M2 -
6 Pek. Pondasi Batu Belah P2 28.23 M3 -
7 Pek. Sloof Beton (15x30) -
- Beton K-225 3.44 M3 -
- Pembesian 745.23 Kg -
- Bekisting 45.93 M2 -
-
C PEKERJAAN STRUKTUR -
C.1 STRUKTUR BETON -
1 Pek. Kolom Beton K1 (30x30) -
- Beton K-225 8.21 M3 -
- Pembesian 1,185.02 Kg -
- Bekisting 109.44 M2 -
2 Pek. Kolom Praktis KP (15x15) -
- Beton K-175 0.55 M3 -
- Pembesian 105.76 Kg -
- Bekisting 14.70 M2 -
3 Pek. Balok Beton B1, B2 (20X30) -
- Beton K-225 3.42 M3 -
- Pembesian 580.24 Kg -
- Bekisting 45.60 M2 -
4 Pek. Balok Lintel BL (15x15), dan RB (15X15) -
- Beton K-175 1.37 M3 -
- Pembesian 477.72 Kg -
- Bekisting 27.45 M2 -
5 Pek. Lantai Beton T=15cm -
- Beton K-225 23.69 M3 -
- Pembesian Wiremesh M-8 1 Lapis 157.90 Kg -
- Bekisting 7.80 M2 -
6 Pek. Ramp Beton T=10cm -
- Beton K-175 0.35 M3 -
- Pembesian 42.24 Kg -
- Bekisting 0.69 M2 -
7 Pek. Kolom Sopi-sopi (30X30) -
- Beton K-225 1.98 M3 -
- Pembesian 73.37 Kg -
- Bekisting 26.46 M2 -
8 Pek. Balok B4 dan Sopi-sopi (15x20) -
- Beton K-175 1.58 M3 -
- Pembesian 244.92 Kg -
- Bekisting 28.93 M2 -
9 Pek. Plat Beton Topi-topi T=10cm -
- Beton K-225 1.21 M3 -
- Pembesian 200.13 Kg -
- Bekisting 14.14 M2 -
-
C.2 PEKERJAAN ATAP -
Rangka Atap -
1 L 40.40.4 366.65 Kg -
2 2 x L 50.50.5 946.30 Kg -
3 Kuda-kuda 2x C 100.50.20.2,3 32.50 Kg -
4 Gording C 125.50.20.2,3 902.00 Kg -
5 L 50.50,5 dudukan gording 49.80 Kg -
6 Trekstang Ø12 49.65 Kg -
7 Ikatan Angin Ø16 166.60 Kg -
8 Pelat Sambung T=10mm 377.10 Kg -
9 Angkur Ø16x300mm 64.00 Bh -
10 Baut M12 x 30 mm 608.00 Bh -
11 Cat Sincromat Rangka Baja 150.00 M2 -
Penutup Atap -
1 Atap Spandek t=0.35 mm 256.23 M2 -
2 Pasang Alumunium Foil, Glaswool, Roofmesh 160.00 M2 -
3 Lisplank GRC 76.60 M' -
4 Plashing/Ban-banan Atap ( Plester, Aci, Waterprofing) 6.00 M' -
-
D PEKERJAAN PLAFOND -
1 Plafond Gypsum 9 mm + Rangka Hollow 4x4; t=0.35 20.00 M2 #REF! #REF!
2 Plafond Calsiboard 4,5 mm + Rangka 76.00 M2 #REF! #REF!
3 Lis Gypsum 5 cm 52.00 M' #REF! #REF!
-
E PEKERJAAN PASANGAN -
1 Pasangan Dinding Bata 226.39 M2 #REF! #REF!
2 Plester + Acian 452.78 M3 #REF! #REF!
3 Pasangan Rolag Bata 19.80 M' -
4 Pekerjaan Rabat Beton t=5 cm Keliling bang. L=100cm 2.60 M3 #REF! #REF!
5 Pekerjaan Meja Beton Wastafel t=8 cm 0.12 M3 -
6 Pasangan Keramik Lantai 40x40 Polished 21.40 M2 #REF! #REF!
7 Pasangan Keramik Lantai 30x30 Unpolished (rabat) 55.60 M2 #REF! #REF!
8 Pasangan Keramik Lantai 20x20 Unpolished (KM) 3.04 M2 -
9 Pasangan Plint Keramik Lantai 10x40 Polished 21.20 M' -
10 Acian Lantai 168.70 M2 -
11 Pengecatan Lantai (Cat Minyak) 168.70 M2 -
12 Pengecatan Jalur Lantai 28.20 M' -
13 Pasangan Keramik Bak & Meja Washtafel 20x20 Polished 1.77 M2 -
14 Pasangan Keramik Dinding 30x60 Polished 5.49 M2 -
15 Pasangan Keramik Dinding 40x40 Kolom Entrance 5.12 M2 -
16 Pek. Logo & Tulisan 1.00 Ls -
17 Tali Air 27.50 M' -
18 List Profilan Dinding 29.55 M' -
19 Opening Dinding Exhaust Fan Dia. 16" (40,64cm) 5.10 M' -
-
F PEKERJAAN KUSEN PINTU & JENDELA -
1 Kusen/Pintu type P1 1.00 Unit -
2 Kusen/Pintu type P2 2.00 Unit -
3 Kusen/Pintu type P3 (spandrel) 1.00 Unit -
4 Kusen/Jendela type J1 2.00 Unit -
5 Kusen/Jendela type J2 9.00 Unit -
6 Kusen/Jendela type J3 1.00 Unit -
7 Kusen/Jendela type BV 1.00 Unit -
8 Kusen/Jendela type PJ1 1.00 Unit -
9 Tralis Jendela (besi begel) 34.10 M2 -
-
G PEKERJAAN PENGECATAN -
1 Pek. Pengecatan Dinding Interior 226.39 M2 #REF! #REF!
2 Pek. Pengecatan Dinding Exterior 226.39 M2 #REF! #REF!
3 Pek. Pengecatan Plafond 96.00 M2 -
4 Pek. Pengecatan Listplank 22.98 M2 -
-
H PEKERJAAN PLUMBING & SANITAIR -
1 Instalasi Pipa PVC AW 4" 16.00 M' 179,650.00 2,874,400
2 Instalasi Pipa PVC AW 2" 12.00 M' 55,650.00 667,800
3 Instalasi Pipa PVC AW 3/4" 20.00 M' 24,010.00 480,200
4 Instalasi Pipa PVC AW 1/2" 15.00 M' 20,390.00 305,850
5 Septictank dan Rembesan 1.00 Unit -
6 Pemasangan Kloset Jongkok 1.00 Bh 125,000.00 125,000
7 Pemasangan Kran Air 2.00 Bh 25,400.00 50,800
8 Pemasangan Wastafel + Kran 2.00 Bh 85,000.00 170,000
9 Pemasangan Cermin Wastafel 100x200 cm 1.00 Unit 65,000.00 65,000
-
I PEKERJAAN LISTRIK -
1 Penyambungan Daya Listrik 11.000 VA 1,245,000.00 13,695,000
2 Perijinan Sertifikat Layak Operasi (SLO) 11.000 VA 275,000.00 3,025,000
3 Panel Listrik (Panel Terbuat dari Plat Besi dan Isi 11 MCB) 1.00 Unit 2,950,000.00 2,950,000
4 Pek. Instalasi Kabel Feeder NYY 4x10 mm2 2.00 M' 104,729.11 209,458
5 Pek. Instalasi Penerangan & Kabel NYM 3x2,5 mm2 + Conduit 28.00 Ttk 360,106.67 10,082,987
6 Pek. Instalasi Power Kipas, Exhaustfan 14.00 Ttk 365,000.00 5,110,000
7 Pemasangan Lampu TKI 2x36W 17.00 Bh 1,600,309.03 27,205,253
8 Pemasangan Lampu Baret Kotak 18/22W 8.00 Bh 685,000.00 5,480,000
9 Pemasangan Lampu E27ESS 8 watt + Downlight 4" 3.00 Bh 965,520.83 2,896,563
10 Pemasangan Saklar Single 3.00 Bh 73,961.67 221,885
11 Pemasangan Saklar Double 4.00 Bh 80,261.67 321,047
12 Pemasangan Stop Kontak Single 13.00 Bh 82,151.67 1,067,972
13 Pemasangan Exhaustfan Dinding 4.00 Unit 178,685.76 714,743
14 Pemasangan Kipas Angin Gantung 7.00 Unit 185,000.00 1,295,000
15 Pemasangan Stop Kontak Exhaustfan 4.00 Bh 82,151.67 328,607
16 Grounding (max 2 Ohm) 1.00 Lot 12,750,000 12,750,000
-
J Lain-lain -
1 IMB 1.00 Pkt -
DAFTAR HARGA UPAH

NO. UPAH PEKERJA SATUAN

1 Pekerja Rp.

2 Tukang batu Rp.

3 Kepala Tukang Batu Rp.

4 Tukang kayu Rp.

5 Kepala Tukang kayu Rp.

6 Tukang besi Profil / Tukang Las Rp.

7 Kepala tukang besi Profil / Tukang Las Rp.

8 Tukang besi Beton Rp.

9 Kepala tukang besi Beton Rp.

10 Tukang Pipa Rp.

11 Kepala Tukang Pipa Rp.

12 Tukang cat Rp.

13 Kepala tukang cat Rp.

14 Tukang gali Rp.

15 Kepala Tukang gali Rp.

16 Mandor Rp.

17 Tukang Listrik Rp.

18 Kepala Tukang Listrik Rp.


HARGA SATUAN

80,000.00 per hari

100,000.00 per hari

130,000.00 per hari

100,000.00 per hari

130,000.00 per hari

100,000.00 per hari

130,000.00 per hari

100,000.00 per hari

130,000.00 per hari

100,000.00 per hari

130,000.00 per hari

100,000.00 per hari

130,000.00 per hari

100,000.00 per hari

130,000.00 per hari

140,000.00 per hari

100,000.00 per hari

130,000.00 per hari


DAFTAR HARGA SATUAN PEKERJAAN

Kode

O.10
O.11
O.12
O.13
O.14
O.15
O.16
O.17
O.18
O.19
O.20
O.21
O.22
O.26
O.29
O.30
O.31
O.32
O.33
O.34
O.35
O.36
O.37
O.38
O.39
O.40
O.41
O.42
O.43
O.44
O.45
O.46
O.47
O.48
O.60
O.61
O.62
O.63
O.64
O.65
O.66
O.67
O.68
O.69
O.70
O.71
O.72
O.73
O.74
O.75
O.76
O.77
O.78
O.79
O.80
O.81
O.82
O.83
O.84
O.85
O.86
O.87
O.88
O.89
O.90
O.91
O.92
O.93
O.94
O.96
O.97
O.98
O.99
O.100
O.101
O.102
O.103
O.104
O.105
O.106
O.107
O.108
O.109
O.110
O.111
O.115
O.116
O.117
O.118
O.119
O.120
O.121
O.123
O.124
O.125
O.126
O.127
O.128
O.129
O.130
O.131
O.132
O.133
O.134
O.135
O.136
O.137
O.138
O.139
O.140
O.141
O.142
O.143
O.144
O.145
O.146

O.147
O.148
O.149
O.150
O.151
O.152
O.153
O.154
O.155
O.156
O.157
O.158
O.159
O.160
O.161
O.162
O.163
O.165

O.166
O.167

O.168
O.169

O.170
O.171
O.172

O.173
O.174
O.175
O.176
O.177
O.178
O.179
O.180
O.181
O.182
O.183
O.184
O.185
O.186
O.187
O.188
O.189
O.190
O.191
O.192
O.193
O.194
O.195
O.196
O.197
O.198
O.199
O.200
O.201
O.202
O.203
O.204
O.205
O.206
O.207
O.208
O.209
O.210
O.211
O.212
O.213
O.214
O.215
O.216
O.217
O.218
O.219
O.220
O.221
O.222
O.223
O.224
O.225
O.226
O.227
O.228
O.229
O.230
O.231
O.232
O.233
O.234
O.235
O.236
O.237
O.238
O.239
O.240
O.241
O.242
O.243
O.244
O.245
O.246
O.247
O.248
O.249
O.250
O.251
O.252
O.252a
O.253
O.254
O.254a
O.255
O.256
O.257
O.258
O.259
O.260
O.261
O.262
O.263
O.264
O.265
O.266
O.267
O.268

O.269
O.270
O.272
O.276
O.277
O.279
O.280
O.281
O.282
O.283
O.284
O.285
O.286
O.287
O.288
O.289
O.290
O.291
O.292
O.293
O.294
O.295
O.296
O.297
O.298
O.299
O.300
O.301
O.302
O.303
O.304
O.305
O.306
O.307
O.308
O.309
O.310
O.311
O.312
O.313
O.314
O.315
DAFTAR HARGA SATUAN PEKERJAAN

Uraian

1 M1 PEMASANGAN PIPA PVC AW DIAMETER 1/2"


1 M1 PEMASANGAN PIPA PVC AW DIAMETER 3/4"
1 M1 PEMASANGAN PIPA PVC AW DIAMETER 1"
1 M1 PEMASANGAN PIPA PVC AW DIAMETER 1 1/4"
1 M1 PEMASANGAN PIPA PVC AW DIAMETER 1 1/2"
1 M1 PEMASANGAN PIPA PVC AW DIAMETER 2"
1 M1 PEMASANGAN PIPA PVC AW DIAMETER 2 1/2"
1 M1 PEMASANGAN PIPA PVC AW DIAMETER 3"
1 M1 PEMASANGAN PIPA PVC AW DIAMETER 4"
1 M1 PEMASANGAN PIPA PVC AW DIAMETER 5"
1 M1 PEMASANGAN PIPA PVC AW DIAMETER 6"
1 M1 PEMASANGAN PIPA PVC AW DIAMETER 4" UNTUK SALURAN
1 M1 PEMASANGAN PIPA PVC D DIAMETER 1 1/2"
1 M1 PEMASANGAN PIPA PVC D DIAMETER 3"
1 M1 PEMASANGAN PIPA BLACK STEEL SCH. 40 DIAMETER 1"
1 M1 PEMASANGAN PIPA BLACK STEEL SCH. 40 DIAMETER 1 1/4"
1 M1 PEMASANGAN PIPA BLACK STEEL SCH. 40 DIAMETER 1 1/2"
1 M1 PEMASANGAN PIPA BLACK STEEL SCH. 40 DIAMETER 2"
1 M1 PEMASANGAN PIPA BLACK STEEL SCH. 40 DIAMETER 2 1/2"
1 M1 PEMASANGAN PIPA BLACK STEEL SCH. 40 DIAMETER 3"
1 M1 PEMASANGAN PIPA BLACK STEEL SCH. 40 DIAMETER 4"
1 M1 PEMASANGAN PIPA BLACK STEEL SCH. 40 DIAMETER 5"
1 M1 PEMASANGAN PIPA BLACK STEEL SCH. 40 DIAMETER 6"
1 M1 PEMASANGAN PIPA POLLYPROPELINE / PN - 10 DIAMETER 1/2"
1 M1 PEMASANGAN PIPA POLLYPROPELINE / PN - 10 DIAMETER 3/4"
1 M1 PEMASANGAN PIPA POLLYPROPELINE / PN - 10 DIAMETER 1"
1 M1 PEMASANGAN PIPA POLLYPROPELINE / PN - 10 DIAMETER 1 1/4"
1 M1 PEMASANGAN PIPA POLLYPROPELINE / PN - 10 DIAMETER 1 1/2"
1 M1 PEMASANGAN PIPA POLLYPROPELINE / PN - 10 DIAMETER 2"
1 M1 PEMASANGAN PIPA POLLYPROPELINE / PN - 10 DIAMETER 2 1/2"
1 M1 PEMASANGAN PIPA POLLYPROPELINE / PN - 10 DIAMETER 3"
1 M1 PEMASANGAN PIPA POLLYPROPELINE / PN - 10 DIAMETER 4"
1 M1 PEMASANGAN PIPA POLLYPROPELINE / PN - 10 DIAMETER 5"
1 M1 PEMASANGAN PIPA POLLYPROPELINE / PN - 10 DIAMETER 6"
1 BUAH PEMASANGAN GATE VALVE (SCREW) CLASS 125, BRASS KITZ DIAMETER 1"
1 BUAH PEMASANGAN GATE VALVE (SCREW) CLASS 125, BRASS KITZ DIAMETER 2"
1 BUAH PEMASANGAN GATE VALVE (SCREW) CLASS 125, BRASS KITZ DIAMETER 3"
1 BUAH PEMASANGAN GATE VALVE (SCREW) CLASS 125, BRASS KITZ DIAMETER 4"
1 BUAH PEMASANGAN GATE VALVE (FLANGE) CLASS 10K, CAST IRON - NON RAISE STEM KITZ DIAMETER 2 1/2"
1 BUAH PEMASANGAN GATE VALVE (FLANGE) CLASS 10K, CAST IRON - NON RAISE STEM KITZ DIAMETER 3"
1 BUAH PEMASANGAN GATE VALVE (FLANGE) CLASS 10K, CAST IRON - NON RAISE STEM KITZ DIAMETER 4"
1 BUAH PEMASANGAN GATE VALVE (FLANGE) CLASS 10K, CAST IRON - NON RAISE STEM KITZ DIAMETER 6"
1 BUAH PEMASANGAN FLEXIBLE JOINT DIAMETER 2"
1 BUAH PEMASANGAN FLEXIBLE JOINT DIAMETER 2 1/2"
1 BUAH PEMASANGAN FLEXIBLE JOINT DIAMETER 3"
1 BUAH PEMASANGAN FLEXIBLE JOINT DIAMETER 4"
1 BUAH PEMASANGAN FLEXIBLE JOINT DIAMETER 5"
1 BUAH PEMASANGAN FLEXIBLE JOINT DIAMETER 6"
1 BUAH PEMASANGAN STRAINER DIAMETER 2"
1 BUAH PEMASANGAN STRAINER DIAMETER 2 1/2"
1 BUAH PEMASANGAN STRAINER DIAMETER 3"
1 BUAH PEMASANGAN STRAINER DIAMETER 4"
1 BUAH PEMASANGAN STRAINER DIAMETER 5"
1 BUAH PEMASANGAN STRAINER DIAMETER 6"
1 BUAH PEMASANGAN CHECK VALVE DIAMETER 2"
1 BUAH PEMASANGAN CHECK VALVE DIAMETER 2 1/2"
1 BUAH PEMASANGAN CHECK VALVE DIAMETER 3"
1 BUAH PEMASANGAN CHECK VALVE DIAMETER 4"
1 BUAH PEMASANGAN CHECK VALVE DIAMETER 5"
1 BUAH PEMASANGAN CHECK VALVE DIAMETER 6"
1 BUAH PEMASANGAN FLOATING VALVE DIAMETER 2"
1 BUAH PEMASANGAN FLOATING VALVE DIAMETER 2 1/2"
1 BUAH PEMASANGAN FLOATING VALVE DIAMETER 3"
1 BUAH PEMASANGAN FLOATING VALVE DIAMETER 4"
1 BUAH PEMASANGAN FLOATING VALVE DIAMETER 5"
1 BUAH PEMASANGAN FLOATING VALVE DIAMETER 6"
1 BUAH PEMASANGAN FOOT VALVE DIAMETER 4"
1 BUAH PEMASANGAN FLOW SWITCH
1 BUAH PEMASANGAN FLOW METER
1 BUAH PEMASANGAN ROOF DRAIN DIAMETER 3"
1 BUAH PEKERJAAN BAK KONTROL UKURAN 40 X 40 CM
1 BUAH BAK KONTROL 40 x 40 CM
1 BUAH BAK SEWAGE PIT 100 x 100 MM
1 UNIT PEMASANGAN LAMPU MERCURY 80 W
1 BUAH PEMASANGAN LAMPU SL 11 W
1 BUAH PEMASANGAN LAMPU LED STRIP
1 Unit Closet duduk TOTO CW631J/SW631JP
1 UNIT Wastafel Toto LW641NJ
1 bh Kran dinding Toto TX109LD
1 UNIT Floor drain TOTO TX1AN
1 UNIT Jet Shower Spray untuk kloset TOTO TX403SMCRB
1 unit Slop Sink Spoel Hoek Toto type SK33
1 unit Tempat Tisue Toto type TX703AC
1 BUAH PEMASANGAN LAMPU TBS 102 MASTER LED TUBE (2 x 14,5 W) LOUVRRE
1 BUAH PEMASANGAN LAMPU TMS 102 MASTER LED TUBE (1 x 14,5 W)
1 BUAH PEMASANGAN LAMPU TBS 102 MASTER LED TUBE (4 x 10 W) ACRYLIC
1 BUAH PEMASANGAN LAMPU DOWNLIGHT G4 LED 1X10 W ( D = 125 MM )
1 BUAH PEMASANGAN LAMPU DOWNLIGHT G4 LED 1X7 W ( D = 100 MM )
1 BUAH PEMASANGAN LAMPU DOWNLIGHT GREEN SPACE LED COMPACT 1X30 W
1 BUAH PEMASANGAN LAMPU SPOT LED 1X5 W
1 BUAH PEMASANGAN LAMPU TANGGA XEON PLAT LED 1X5 W
1 BUAH PEMASANGAN LAMPU BARET PERSEGI LED 1X7 W
1 BUAH PEMASANGAN LAMPU EXIT LED 1X4 W
1 BUAH PEMASANGAN SAKLAR TUNGGAL
1 BUAH PEMASANGAN SAKLAR GANDA
1 BUAH PEMASANGAN GREED SWITCH 5 GANG
1 BUAH PEMASANGAN STOP KONTAK 1 FASA
1 BUAH PEMASANGAN STOP KONTAK GANDA
1 BUAH PEMASANGAN STOP KONTAK LANTAI
1 BUAH PEMASANGAN EXHAUST FAN 200 CFM
1 BUAH PEMASANGAN EXHAUST FAN 22 W
1 TITIK INSTALASI PENERANGAN
1 TITIK INSTALASI STOP KONTAK
1 TITIK INSTALASI EXHAUST FAN
1 TITIK INSTALASI DETEKTOR, BELL, DAN INDIKATOR
1 TITIK INSTALASI DAYA AC - 1 FASA
1 TITIK INSTALASI DAYA AC - 3 FASA
1 TITIK INSTALASI DAYA UNIT INDOOR UNIT AC
1 TITIK INSTALASI DAYA UNIT OUTDOOR UNIT AC
1 TITIK INSTALASI TELEPON
1 TITIK INSTALASI DATA
1 TITIK INSTALASI TATA SUARA
1 TITIK INSTALASI MATV
1 TITIK INSTALASI FIRE ALARM
1 M1 PEMASANGAN KABEL TRAY LEBAR 20 CM
1 M1 PEMASANGAN KABEL TRAY LEBAR 30 CM
1 M1 PEMASANGAN KABEL TRAY LADDER 50 CM
1 M1 PEMASANGAN KABEL TRAY LEBAR 60 CM
1 UNIT PEMASANGAN CUBICLE PANEL TM
1 UNIT PEMASANGAN CAPACITOR BANK 250 KVAR
1 UNIT PEMASANGAN PANEL LVMDP
1 UNIT PEMASANGAN PANEL SDP
1 UNIT PEMASANGAN PANEL PP -GM/PT
1 UNIT PEMASANGAN PANEL PP -RADIOLOGI
1 UNIT PEMASANGAN PANEL LP LT. SATU
1 UNIT PEMASANGAN PANEL LP LT. DUA
1 UNIT PEMASANGAN PANEL LP LT. TIGA
1 UNIT PEMASANGAN PANEL LP LT. EMPAT
1 UNIT PEMASANGAN PANEL LP LT. LIMA
1 UNIT PEMASANGAN PANEL LP LT. ROOFTOP
1 UNIT PEMASANGAN PANEL PP-AC LT. SATU
1 UNIT PEMASANGAN PANEL PP-AC LT. DUA
1 UNIT PEMASANGAN PANEL PP-AC LT. TIGA
1 UNIT PEMASANGAN PANEL PP-AC LT. EMPAT
1 UNIT PEMASANGAN PANEL PP-AC LT. LIMA
1 UNIT PEMASANGAN PANEL PP-AC LT. OUTDOOR
1 UNIT PEMASANGAN PANEL R. GENSET
1 UNIT PEMASANGAN PANEL R. POMPA
1 UNIT PEMASANGAN PANEL LIFT
1 UNIT PEMASANGAN PANEL ATM CENTER
1 UNIT PEMASANGAN PANEL LAMPU PAGAR
1 M1 PEMASANGAN KABEL NYY 4 x 4 MM2
1 M1 PEMASANGAN KABEL NYY 4 x 4 MM2 + NYA 1 x 4 MM2
1 M1 PEMASANGAN KABEL NYY 4 x 6 MM2
1 M1 PEMASANGAN KABEL NYY 4 x 10 MM2
1 M1 PEMASANGAN KABEL NYY 4 x 10 MM2 + NYA 1 x 10 MM2
1 M1 PEMASANGAN KABEL NYY 2 x (4 x 10 MM2)
1 M1 PEMASANGAN KABEL NYY 4 x 16 MM2
1 M1 PEMASANGAN KABEL NYY 4 x 16 MM2 + NYA 1 x 16 MM2
1 M1 PEMASANGAN KABEL NYY 4 x 25 MM2
1 M1 PEMASANGAN KABEL NYY 4 x 35 MM2
1 M1 PEMASANGAN KABEL NYY 4 x 50 MM2
1 M1 PEMASANGAN KABEL NYY 4 x 50 MM2 + NYA 1 X 35 MM2
1 M1 PEMASANGAN KABEL NYY 4 x 70 MM2
1 M1 PEMASANGAN KABEL NYY 4 x 95 MM2
1 M1 PEMASANGAN KABEL NYY 4 x 120 MM2
1 M1 PEMASANGAN KABEL NYY 4 x 150 MM2
1 M1 PEMASANGAN KABEL NYY 4 x (1 x 185 MM2)
1 M1 PEMASANGAN KABEL NYY 4 x (1 x 240 MM2)
1 M1 PEMASANGAN KABEL NYY 4 x 2 x (1 x 145 MM2)
1 M1 PEMASANGAN KABEL NYY 4 x 2 x (1 x 300 MM2)
1 M1 PEMASANGAN KABEL NYY 4 x 3 x (1 x 300 MM2)
1 M1 PEMASANGAN KABEL NYY 4 x 4 x (1 x 300 MM2)
1 M1 PEMASANGAN KABEL NYY 6 x 4 x (1 x 300 MM2)
1 M1 PEMASANGAN KABEL NYY 3 x (1 x 70 MM2)
1 M1 PEMASANGAN KABEL NYMHY 4 x (3 x 1,5 MM2)
1 M1 PEMASANGAN KABEL NYFGbY 4 x 2,5 MM2
1 M1 PEMASANGAN KABEL NYFGbY 4 x 4 MM2
1 M1 PEMASANGAN KABEL NYFGbY 4 x 16 MM 2
1 M1 PEMASANGAN KABEL NYFGbY 4 x 25 MM2
1 M1 PEMASANGAN KABEL NYFGbY 4 x 35 MM2
1 M1 PEMASANGAN KABEL NYFGbY 4 x 50 MM2
1 M1 PEMASANGAN KABEL NYFGbY 4 x 120 MM2
1 M1 PEMASANGAN KABEL NYFGbY 4 x 185 MM2
1 M1 PEMASANGAN KABEL NYFGbY 2(4 x 150 MM2)
1 M1 PEMASANGAN KABEL NYFGbY (4 x 300 MM2)
1 M1 PEMASANGAN KABEL NYFGbY 6(4 x 300 MM2)
1 M1 PEMASANGAN KABEL N2XSY (1 x 400 MM2)
1 M1 PEMASANGAN KABEL N2XSY (1 x 95 MM2)
1 UNIT PEMASANGAN TRAFO 630 KVA
1 UNIT PEMASANGAN UPS KAPASITAS 20 KVA
1 UNIT PEMASANGAN UPS KAPASITAS 40 KVA
1 UNIT PEMASANGAN CTB 20 PAIRS
1 UNIT PEMASANGAN PESAWAT TELEPON SINGLE LINE
1 UNIT PEMASANGAN SOCKET TELEPON (RJ - 11)
1 UNIT PEMASANGAN PATCH PANEL + SWITCH HUB 12 PORT
1 UNIT PEMASANGAN TERMINAL BOX 10 PAIRS
1 M1 PEMASANGAN KABEL TELEPON 10 PAIRS
1 M1 PEMASANGAN KABEL TELEPON 20 PAIRS
1 M1 PEMASANGAN KABEL TELEPON 30 PAIRS
1 M1 PEMASANGAN KABEL TELEPON 40 PAIRS
1 M1 PEMASANGAN KABEL TELEPON 50 PAIRS
1 M1 PEMASANGAN KABEL TELEPON 80 PAIRS
1 M1 PEMASANGAN KABEL DATA CAT 5E
1 M1 PEMASANGAN KABEL DATA CAT 6 TYPE OUTDOOR
1 M1 PEMASANGAN TWISTED SHIELDED 2 x AWG 18 (DATA)
1 M1 PEMASANGAN FRC 3 x 1,5 MM2 (POWER)
1 M1 PEMASANGAN ITC 2 x 2 x 0,6 MM2 (PHONE)
1 M1 PEMASANGAN KABEL COAXIAL RG 6
1 M1 PEMASANGAN KABEL COAXIAL RG 8
1 M1 PEMASANGAN KABEL COAXIAL RG 11 / 10C
1 BUAH PEMASANGAN SOCKET DATA
1 BUAH PEMASANGAN SMOKE DETECTOR
1 BUAH PEMASANGAN ROR
1 BUAH PEMASANGAN INDICATOR FLASHING LAMP
1 BUAH PEMASANGAN ALARM BELL
1 BUAH PEMASANGAN MANUAL BREAK GLASS
1 BUAH PEMASANGAN MCFA, KAPASITAS 20 ZONE
1 BUAH PEMASANGAN ANNOUNCIATOR PANEL KAPASITAS 30 ZONE
1 BUAH PEMASANGAN TB - FIRE ALARM
1 BUAH PEMASANGAN SPLITER
1 BUAH PEMASANGAN COUPLER
1 BUAH PEMASANGAN SOCKET TV
1 BUAH PEMASANGAN TB - SOUND SYSTEM
1 BUAH PEMASANGAN RADIO TUNNER AM/FM
1 BUAH PEMASANGAN AUTORESERVE CASSETTE
1 BUAH PEMASANGAN CD PLAYER
1 BUAH PEMASANGAN PAGGING MICROPHONE
1 BUAH PEMASANGAN MIXER FRAME W/ MODULE
1 BUAH PEMASANGAN EQUALIZER
1 BUAH PEMASANGAN 240W POWER AMPLIFIER
1 BUAH PEMASANGAN CEILING SPEAKER
1 BUAH PEMASANGAN COLUMN SPEAKER
1 BUAH PEMASANGAN VOLUME CONTROL
1 BUAH PEMASANGAN TERMINAL BOX + BOOSTER
1 BUAH PEMASANGAN ACTIVE FILTER
1 BUAH PEMASANGAN DIGITAL SATELITE RECEIVER & MODULATOR
1 UNIT PEMASANGAN PC COMPUTER & PRINTER
1 UNIT PEMASANGAN 21 LCD TFT MONITOR
1 UNIT PEMASANGAN NETWORK VIDEO RECORDER (NVR)
1 UNIT PEMASANGAN RACK CCTV
1 UNIT PEMASANGAN CAMERA FIXED DOME
1 UNIT PEMASANGAN CAMERA FIXED BULLET
1 UNIT PEMASANGAN MASTER STATION DIGITAL
1 BUAH PEMASANGAN CORIDOOR LIGHT
1 BUAH PEMASANGAN HAND FELD CALL BUTTON
1 BUAH PEMASANGAN CALL RISET BUTTON
1 BUAH PEMASANGAN BATHROOM PULL CORD
1 UNIT PEMASANGAN MESIN POMPA SEMI HISAP
1 BUAH PEMASANGAN PRESSURE GAUGE
1 BUAH PEMASANGAN PRESSURE SWITCH
1 BUAH PEMASANGAN PRESSURE TANK KAPASITAS 1000 LITER
1 UNIT PEMASANGAN OXYGEN CENTRAL 2 x 14 CYLINDERS
1 UNIT PEMASANGAN OUTLET OKSIGEN
1 UNIT PEMASANGAN OUTLET COMPRESSED AIR
1 UNIT PEMASANGAN OUTLET VACUUM WITH HOOK BASE
1 UNIT PEMASANGAN CUBICAL TRY (BAHAN MULTIPLEK LAPIS HPL)
1 UNIT PEMASANGAN FLOW METER (FLOW RATE 0-15 LITER/MENIT)
1 UNIT PEMASANGAN FLOW METER (FLOW RATE FOR BABY USE)
1 M1 PEMASANGAN PIPA TEMBAGA (ASTM 218) DIAMETER 1/2"
1 M1 PEMASANGAN PIPA TEMBAGA (ASTM 218) DIAMETER 3/4"
1 M1 PEMASANGAN PIPA TEMBAGA (ASTM 218) DIAMETER 3/8"
1 M1 PEMASANGAN PIPA TEMBAGA (ASTM 218) DIAMETER 1"
1 UNIT PEMASANGAN Pompa Transfer Kapasitas 200 ltr/m
1 UNIT PEMASANGAN POMPA BOOSTER KAPASITAS 30 LPM / 41 M
1 UNIT PEMASANGAN WATER LEVEL CONTROL
1 UNIT PEMASANGAN CARBON FILTER
1 UNIT PEMASANGAN RESERVOIR BAWAH KAPASITAS 78 M3
1 UNIT PEMASANGAN TANGKI AIR KAPASITAS 4 M3
1 UNIT PEMASANGAN TANGKI AIR PANAS KAPASITAS 4 M3
1 UNIT PEMASANGAN DIESEL FIRE PUMP KAPASITAS 500 USGPM / 67,5 M
1 UNIT PEMASANGAN ELECTRIC FIRE PUMP KAPASITAS 500 USGPM / 67,5 M
1 UNIT PEMASANGAN JOCKEY PUMP KAPASITAS 80 USGPM / 80 M
1 BUAH PEMASANGAN INDOOR HYDRANT BOX
1 BUAH PEMASANGAN FIRE EXTINGUISHER KAPASITAS 5 KG
1 BUAH PEMASANGAN HEAD SPRINKLER
1 UNIT PEMASANGAN SENTRAL GAS VACUUM KAPASITAS 311 LPM @ 450 MMHG
1 UNIT PEMASANGAN SENTRAL COMPRESSED AIR KAPASITAS 410 LPM
1 UNIT PEMASANGAN CENTRAL ALARM PANEL TYPE 3 GAS
1 UNIT PEMASANGAN ALARM PANEL TYPE 3 GAS
1 UNIT PEMASANGAN VALVE BOX TYPE 3 GAS
1 M1 PEMASANGAN PIPA REFRIGERANT
1 M1 PEMASANGAN PIPA DRAIN PVC + ISOLASI DIAMETER 1"
1 UNIT PEMASANGAN INDOOR AC SPLIT WALL MOUNTED TYPE, KAPASITAS 7500 BTUH
1 UNIT PEMASANGAN INDOOR AC SPLIT WALL MOUNTED TYPE, KAPASITAS 9600 BTUH
1 UNIT PEMASANGAN INDOOR AC SPLIT WALL MOUNTED TYPE, KAPASITAS 12300 BTUH
1 UNIT PEMASANGAN INDOOR AC SPLIT WALL MOUNTED TYPE, KAPASITAS 15400 BTUH
1 UNIT PEMASANGAN INDOOR AC SPLIT WALL MOUNTED TYPE, KAPASITAS 19100 BTUH
1 UNIT PEMASANGAN INDOOR AC SPLIT WALL MOUNTED TYPE, KAPASITAS 24200 BTUH
1 UNIT PEMASANGAN INDOOR AC CASSETTE MOUNTED TYPE, KAPASITAS 19100 BTUH
1 UNIT PEMASANGAN INDOOR AC CASSETTE MOUNTED TYPE, KAPASITAS 24200 BTUH
1 UNIT PEMASANGAN INDOOR AC CASSETTE MOUNTED TYPE, KAPASITAS 30700 BTUH
1 UNIT PEMASANGAN INDOOR AC CASSETTE MOUNTED TYPE, KAPASITAS 38200 BTUH
1 UNIT PEMASANGAN INDOOR AC CEILING MOUNTED DUCT TYPE, KAPASITAS 95500 BTUH
1 UNIT PEMASANGAN OUTDOOR AC VRV KAPASITAS 107500 BTUH
1 UNIT PEMASANGAN OUTDOOR AC VRV KAPASITAS 291800 BTUH
1 UNIT PEMASANGAN OUTDOOR AC VRV KAPASITAS 350400 BTUH
1 UNIT PEMASANGAN OUTDOOR AC VRV KAPASITAS 352700 BTUH
1 UNIT PEMASANGAN OUTDOOR AC VRV KAPASITAS 358800 BTUH
1 UNIT PEMASANGAN OUTDOOR AC VRV KAPASITAS 367700 BTUH
1 UNIT PEMASANGAN OUTDOOR AC VRV KAPASITAS 436600 BTUH
1 UNIT PEMASANGAN PRESSURERIZE FAN KAPASITAS 19.000 CFM / 1,98 INWG / INLINE AXIAL FAN
1 UNIT PEMASANGAN BOOSTER FAN KAPASITAS 200 CFM
1 UNIT PEMASANGAN RETURN AIR GRILLE 14" x 14"
Harga Satuan
(Rp)
c

-
22,610.00 22,610.00
26,240.00 26,240.00
31,010.00 31,010.00
46,450.00 46,450.00
50,380.00 50,380.00
58,990.00 58,990.00
86,760.00 86,760.00
110,120.00 110,120.00
184,650.00 184,650.00
275,330.00 275,330.00
374,230.00 374,230.00
132,940.00 132,940.00
49,100.00 49,100.00
73,120.00 73,120.00
68,300.00 68,300.00
86,650.00 86,650.00
99,580.00 99,580.00
132,960.00 132,960.00
197,540.00 197,540.00
256,380.00 256,380.00
369,970.00 369,970.00
483,590.00 483,590.00
713,390.00 713,390.00
36,430.00 36,430.00
48,390.00 48,390.00
77,490.00 77,490.00
116,740.00 116,740.00
178,000.00 178,000.00
279,460.00 279,460.00
324,410.00 324,410.00
629,010.00 629,010.00
964,900.00 964,900.00
1,626,300.00 1,626,300.00
2,685,050.00 2,685,050.00
207,210.00 207,210.00
2,757,010.00 2,757,010.00
3,293,700.00 3,293,700.00
4,421,090.00 4,421,090.00
1,998,010.00 1,998,010.00
3,323,810.00 3,323,810.00
3,519,940.00 3,519,940.00
6,247,280.00 6,247,280.00
367,550.00 367,550.00
588,060.00 588,060.00
955,570.00 955,570.00
1,323,080.00 1,323,080.00
1,543,580.00 1,543,580.00
1,690,590.00 1,690,590.00
831,820.00 831,820.00
1,222,540.00 1,222,540.00
2,394,700.00 2,394,700.00
2,745,900.00 2,745,900.00
5,050,710.00 5,050,710.00
6,203,120.00 6,203,120.00
3,168,000.00 3,168,000.00
3,440,690.00 3,440,690.00
6,440,280.00 6,440,280.00
3,364,590.00 3,364,590.00
6,288,080.00 6,288,080.00
7,749,830.00 7,749,830.00
1,560,030.00 1,560,030.00
4,036,200.00 4,036,200.00
5,258,000.00 5,258,000.00
7,111,280.00 7,111,280.00
15,817,120.00 15,817,120.00
18,528,400.00 18,528,400.00
3,519,940.00 3,519,940.00
340,450.00 340,450.00
422,950.00 422,950.00
386,650.00 386,650.00
233,510.00 233,510.00
263,200.00 263,200.00
1,882,860.00 1,882,860.00

6,242,610.00 6,242,610.00
2,696,980.00 2,696,980.00
956,140.00 956,140.00
468,790.00 468,790.00
781,790.00 781,790.00
9,544,760.00 9,544,760.00
805,940.00 805,940.00
930,480.00 930,480.00
583,760.00 583,760.00
945,330.00 945,330.00
491,140.00 491,140.00
468,700.00 468,700.00
585,740.00 585,740.00
545,260.00 545,260.00
679,460.00 679,460.00
738,860.00 738,860.00
423,830.00 423,830.00
53,480.00 53,480.00
59,420.00 59,420.00
86,700.00 86,700.00
314,570.00 314,570.00
390,910.00 390,910.00
739,830.00 739,830.00
58,372,250.00 58,372,250.00
1,944,660.00 1,944,660.00
216,470.00 216,470.00
263,660.00 263,660.00
137,820.00 137,820.00
295,450.00 295,450.00
381,330.00 381,330.00
882,030.00 882,030.00
554,250.00 554,250.00
3,460,710.00 3,460,710.00
438,750.00 438,750.00
381,550.00 381,550.00
329,790.00 329,790.00
212,180.00 212,180.00
229,690.00 229,690.00
191,280.00 191,280.00
255,170.00 255,170.00
343,260.00 343,260.00
307,010.00 307,010.00
127,210,490.00 127,210,490.00
91,586,020.00 91,586,020.00
150,985,890.00 150,985,890.00
16,658,370.00 16,658,370.00
9,485,450.00 9,485,450.00
10,085,390.00 10,085,390.00
4,770,710.00 4,770,710.00
4,770,710.00 4,770,710.00
5,115,800.00 5,115,800.00
4,560,170.00 4,560,170.00
4,770,710.00 4,770,710.00
3,139,510.00 3,139,510.00
4,531,610.00 4,531,610.00
4,465,540.00 4,465,540.00
4,336,800.00 4,336,800.00
4,035,270.00 4,035,270.00
3,906,520.00 3,906,520.00
14,014,380.00 14,014,380.00
3,392,030.00 3,392,030.00
3,263,290.00 3,263,290.00
6,801,330.00 6,801,330.00
2,962,830.00 2,962,830.00
2,846,670.00 2,846,670.00
56,510.00 56,510.00
62,890.00 62,890.00
65,200.00 65,200.00
73,340.00 73,340.00
86,540.00 86,540.00
140,660.00 140,660.00
114,120.00 114,120.00
128,420.00 128,420.00
169,560.00 169,560.00
226,650.00 226,650.00
303,290.00 303,290.00
950,200.00 950,200.00
422,530.00 422,530.00
575,320.00 575,320.00
719,310.00 719,310.00
880,900.00 880,900.00
3,400,780.00 3,400,780.00
1,145,780.00 1,145,780.00
5,677,340.00 5,677,340.00
2,740,780.00 2,740,780.00
4,102,140.00 4,102,140.00
5,465,100.00 5,465,100.00
8,187,820.00 8,187,820.00
324,300.00 324,300.00
70,700.00 70,700.00
231,290.00 231,290.00
266,380.00 266,380.00
295,090.00 295,090.00
348,770.00 348,770.00
410,040.00 410,040.00
491,660.00 491,660.00
956,030.00 956,030.00
1,265,180.00 1,265,180.00
1,089,590.00 1,089,590.00
2,165,120.00 2,165,120.00
34,618,610.00 34,618,610.00
1,327,150.00 1,327,150.00
413,380.00 413,380.00
260,525,360.00 260,525,360.00
41,119,100.00 41,119,100.00
126,919,100.00 126,919,100.00
1,333,420.00 1,333,420.00
603,490.00 603,490.00
111,630.00 111,630.00
1,049,560.00 1,049,560.00
451,050.00 451,050.00
35,740.00 35,740.00
51,690.00 51,690.00
64,450.00 64,450.00
78,810.00 78,810.00
93,220.00 93,220.00
141,610.00 141,610.00
13,080.00 13,080.00
15,610.00 15,610.00
18,690.00 18,690.00
26,500.00 26,500.00
8,790.00 8,790.00
10,130.00 10,130.00
29,930.00 29,930.00
42,690.00 42,690.00
247,260.00 247,260.00
500,510.00 500,510.00
401,510.00 401,510.00
110,450.00 110,450.00
401,290.00 401,290.00
433,520.00 433,520.00
11,282,700.00 11,282,700.00
8,431,390.00 8,431,390.00
740,570.00 740,570.00
358,850.00 358,850.00
186,590.00 186,590.00
186,790.00 186,790.00
740,570.00 740,570.00
652,900.00 652,900.00
652,900.00 652,900.00
512,430.00 512,430.00
2,102,710.00 2,102,710.00
4,424,160.00 4,424,160.00
3,849,850.00 3,849,850.00
5,295,250.00 5,295,250.00
162,250.00 162,250.00
341,440.00 341,440.00
169,840.00 169,840.00
1,092,810.00 1,092,810.00
1,044,960.00 1,044,960.00
1,970,390.00 1,970,390.00
5,162,850.00 5,162,850.00
1,972,850.00 1,972,850.00
15,397,580.00 15,397,580.00
2,522,850.00 2,522,850.00
2,609,860.00 2,609,860.00
2,822,600.00 2,822,600.00
40,129,020.00 40,129,020.00
3,596,280.00 3,596,280.00
1,807,250.00 1,807,250.00
1,045,710.00 1,045,710.00
1,035,420.00 1,035,420.00
3,422,410.00 3,422,410.00
334,490.00 334,490.00
200,070.00 200,070.00
17,375,600.00 17,375,600.00
202,491,030.00 202,491,030.00
1,850,210.00 1,850,210.00
1,850,210.00 1,850,210.00
1,850,210.00 1,850,210.00
403,710.00 403,710.00
2,060,860.00 2,060,860.00
2,610,860.00 2,610,860.00
105,710.00 105,710.00
205,530.00 205,530.00
72,570.00 72,570.00
277,970.00 277,970.00
14,152,860.00 14,152,860.00
107,023,840.00 107,023,840.00
993,460.00 993,460.00
10,423,600.00 10,423,600.00
27,974,920.00 27,974,920.00
18,340,300.00 18,340,300.00
155,475,980.00 155,475,980.00
442,641,100.00 442,641,100.00
254,706,100.00 254,706,100.00
55,716,100.00 55,716,100.00
5,007,140.00 5,007,140.00
1,635,150.00 1,635,150.00
84,470.00 84,470.00
447,285,090.00 447,285,090.00
787,799,530.00 787,799,530.00
45,463,760.00 45,463,760.00
15,489,430.00 15,489,430.00
11,757,930.00 11,757,930.00
123,380.00 123,380.00
79,100.00 79,100.00
11,232,060.00 11,232,060.00
11,662,280.00 11,662,280.00
12,345,060.00 12,345,060.00
13,439,840.00 13,439,840.00
14,368,640.00 14,368,640.00
15,501,860.00 15,501,860.00
20,612,460.00 20,612,460.00
21,796,340.00 21,796,340.00
23,167,760.00 23,167,760.00
24,795,590.00 24,795,590.00
29,905,970.00 29,905,970.00
102,011,200.00 102,011,200.00
225,371,980.00 225,371,980.00
281,021,970.00 281,021,970.00
296,430,430.00 296,430,430.00
298,845,740.00 298,845,740.00
318,650,430.00 318,650,430.00
333,461,170.00 333,461,170.00
8,190,600.00 8,190,600.00
2,755,920.00 2,755,920.00
379,600.00 379,600.00
DAFTAR HARGA BAHAN & UPAH

NO UPAH & BAHAN


1 2
I. UPAH TENAGA KERJA
1 Pekerja
2 Tukang
3 Kepala Tukang
4 Mandor
II. BAHAN/MATERIAL
A. Kabel Feeder
1 NYA 1x1.5 mm²
2 NYM 3x2.5 mm²
3 NYM 4x2.5 mm²
4 NYY 1x50 mm²
5 NYY 1x150 mm²
6 NYY 1x185 mm²
7 NYY 3x2.5 mm²
8 NYY 3x4 mm²
9 NYY 4x4 mm²
10 NYY 4x6 mm²
11 NYY 4x10 mm²
12 NYY 4x16 mm²
13 NYY 4x35 mm²
14 NYY 4x50 mm²
15 NYY 4x70 mm²
16 NYY 4x95 mm²
17 NYY 4x120 mm²
18 NYFGby 2x1.5 mm²
19 N2XSEFGbY 3 x 70 mm²
20 N2XSEFGbY 3 x 95 mm²
21 N2XSY 3 x 50 mm²
22 FRC 4 x 6 mm²
23 FRC 4 x 10 mm²
24 FRC 4 x 16 mm²
25 N2XSEBY 3x185 mm²
26 N2XSY 1x50 mm²
27 N2XSY 1x185mm²
B. Armatur penerangan dan lampu
28 TL LED 1x20 Watt SM
29 Downligth LED 10 Watt
30 LED Bollard 10 Watt Tinggi
31 TL LED 2x20 Watt SM
32 TL LED 2x20 Watt RM
33 TL LED 1x20 Watt RM
34 Lampu Solard Cell 52 Watt+ Tiang 7 meter (lengkap Baterai)
35 Exit Lamp 10 Watt
36 Saklar single
37 Saklar double
38 Saklar tukar
39 Saklar 3 gang
40 Saklar 4 gang
41 Downlight LED 7 Watt
42 LED Down Warm White 300K,200 Lumen 28 Watt
C. Outlet penerangan dan daya
41 Stop kontak 1 Phasa
42 Stop kontak 1 Phasa type floor
43 Stop kontak 3 Phasa
44 Stop kontak 3 Phasa type floor
D. Kabel tray
45 Kabel tray 200 mm
46 Kabel tray 300 mm
47 Kabel tray 400 mm
48 Kabel tray 600 mm
49 Tee Tray 200 mm
50 Tee Tray 300 mm
51 Tee Tray 400 mm
52 Tee Tray 600 mm
53 Elbow Tray 200 mm
54 Elbow Tray 300 mm
55 Elbow Tray 400 mm
56 Elbow Tray 600 mm
E. Cubicle
57 Capasitor Bank Kap. 232 Kvar 12 Step
58 Cubicle Incoming
59 Cubicle Metering
60 Cubicle Outgoing
61 Trafo 630 kVA
62 GENSET 500 Kva
F. Pekerjaan Fire Alarm
1 MCFA sEMI Addressable 24 zone
2 MDF/ CTB
3 Terminal Box Fire
4 Smoke Detector
5 Heat Detector
6 Break Glass
7 Alarm Bell
8 Indicator Lamp
9 Twisted Shelded 18,2 PAR + NYM 2 x 2,5 mm2
10 EOL

H. Pekerjaan Telepon
1 Peralatan Utama
- PABX 200 Pairs
- Billing Sistem
- Rectifier
- Battery
- Surge Arester
- MDF
- Monitor
2 Pesawat Telephone Single Line
3 CTB 200 Pairs
4 Socket Telephone RJ-11
5 Terminal Box 10 Pairs
6 Terminal Box 20 Pairs
7 Terminal Box 30 Pairs
8 Kabel ITC 10x2x2x0,6 mm2
9 Kabel ITC 20x2x2x0,6 mm2
10 Kabel ITC 30x2x2x0,6 mm2
11 Kabel ITC 200x2x2x0,6 mm2
12 Kabel Coaxial RG8 ( 0,6 mm2 )

I. SOUND SISTEM
1 240 W/300W Power Amplifier
2 Autorserve Cassete
3 CD Playaer
4 Equalizer Card ( VX-200 )
5 Mixer Frame w/ Module (V-1000B )
6 Pagging Microphone PM 660D/1 ( w/ RU-2001 )
7 Radio Tunner AM/FM ( V-1034B )
8 Speaker Selector ( SS-021B )
9 Ceiling Speaker ( ZS-646R )
10 Coulumn speaker 20 watt
11 Horn Speaker
12 Attenuator
13 Kabel NYMHY 2x1,5 mm2
14 Kabel NYMHY 3x1,5 mm2
15 Kabel NYMHY 3( 3 x2,5 mm2 )
16 Terminal Box / TB
17 MDF / CTB
18 Cabinet Rack
19 Volume Control

J. CCTV
1 NVR Samsung SRN-1670D
2 VIEWSONIC Multi-touch Monitor LED  24"
3 Switch D-LINK DGS-1210-20 16 port
4 Switch Hub Managed TPLink 8 Port TL SG3210
5 D-LINK Switch Unmanaged [DGS-1005A] 5 port
6 PC Computer + Printer
7 Fixed Dome Camera
8 Camera With Rotation
9 Rack CCTV

K. DATA
1 HP ProLiant DL320eG8-421
2 Path Panel 2x48 port
3 Monitor
4 Printer
5 Socket Data ( RG-45 )
6 Kabel UTP- Cat 5e - 0,6 mm2
L. Material dan alat bantu
1 Inbown dus
2 Fisher s6
3 Ballast electronik 28 Watt
4 Pipa Conduit 20 mm²
5 Pipa Conduit 25 mm²
6 Klem pipa conduit 20 mm²
7 Klem pipa conduit 25 mm²
8 T dus
9 Isolasi
10 Kabel ties
11 Kawat bendrat
12 LAMPU
13 Tiang Penangkal Petir Radius 100 m Lengkap
14 Grounding Rod Elektronik Dia. 20 mmx12 m Maximum 1 Ohm
15 Grounding Rod Elektrikal Dia. 20 mmx12 m Maximum 2 Ohm
16 Grounding Cooper Plat 1000x1000x10 mm
17 Bak Kontrol 40x40x40 cm+EGB Maximum 2 Ohm
18 EGB 300x100x5 mm
19 Kabel Grounding Panel
20 Spliter 2 Way
21 Spliter 4 Way
22 Outlet MATV
DAFTAR HARGA BAHAN & UPAH

UPAH & BAHAN HARGA SATUAN (Rp)


2 3

Rp 80,000.00 /Hari
Rp 100,000.00 /Hari
Rp 120,000.00 /Hari
Rp 125,000.00 /Hari

Rp 2,640.00 /meter
Rp 15,600.00 /meter
Rp 31,200.00 /meter
Rp 64,800.00 /meter
Rp 199,200.00 /meter
Rp 248,400.00 /meter
Rp 18,000.00 /meter
Rp 27,600.00 /meter
Rp 36,000.00 /meter
Rp 50,400.00 /meter
Rp 80,400.00 /meter
Rp 94,800.00 /meter
Rp 201,600.00 /meter
Rp 268,800.00 /meter
Rp 382,800.00 /meter
Rp 526,800.00 /meter
Rp 663,600.00 /meter
Rp 16,800.00 /meter
Rp 720,000.00 /meter
Rp 1,020,000.00 /meter
Rp 600,000.00 /meter
Rp 177,600.00 /meter
Rp 270,000.00 /meter
Rp 366,000.00 /meter
Rp 1,451,160.00 /meter
Rp 253,560.00 /meter
Rp 760,680.00 /meter

Rp 1,320,000.00 /buah
Rp 1,020,000.00 /buah
Rp 2,400,000.00 /buah
Rp 1,500,000.00 /buah
Rp 1,560,000.00 /set
Rp 1,380,000.00 /buah
Tiang 7 meter (lengkap Baterai) Rp 57,600,000.00 /Set
Rp 900,000.00 /buah
Rp 42,000.00 /buah
Rp 48,000.00 /buah
Rp 54,000.00 /buah
Rp 75,600.00 /buah
Rp 96,000.00 /buah
Rp 900,000.00 /Set
K,200 Lumen 28 Watt Rp 3,000,000.00 /Set

Rp 50,400.00 buah
Rp 390,000.00 buah
Rp 390,000.00 buah

Rp 266,400.00 meter
Rp 302,400.00 meter
Rp 370,080.00 meter
Rp 388,800.00 meter
Rp 141,120.00 meter
Rp 201,600.00 meter
Rp 220,320.00 meter
Rp 384,480.00 meter
Rp 139,680.00 meter
Rp 159,840.00 meter
Rp 200,160.00 meter
Rp 357,120.00 meter

Rp 403,200,000.00 unit
Rp 143,640,000.00 unit
Rp 143,640,000.00 unit
Rp 143,640,000.00 unit
Rp 480,000,000.00 unit
Rp 900,000,000.00 unit

Rp 96,000,000.00 unit
Rp 4,200,000.00 unit
Rp 2,040,000.00 buah
Rp 864,000.00 buah
Rp 600,000.00 buah
Rp 240,000.00 buah
Rp 432,000.00 buah
Rp 276,000.00 buah
NYM 2 x 2,5 mm2 Rp 37,200.00 buah
Rp 240,000.00 buah

Rp 102,000,000.00 Unit

Rp 588,000.00 buah
Rp 4,200,000.00 buah
Rp 105,840.00 buah
Rp 546,000.00 buah
Rp 823,200.00 buah
Rp 924,000.00 buah
Rp 31,920.00 meter
Rp 63,840.00 meter
Rp 95,760.00 meter
Rp 638,400.00 meter
Rp 9,600.00 meter

Rp 9,943,080.00 unit
Rp 5,187,000.00 unit
Rp 5,346,600.00 unit
Rp 2,741,280.00 unit
Rp 12,394,320.00 unit
D/1 ( w/ RU-2001 ) Rp 3,943,200.00
Rp 6,064,800.00 unit
Rp 8,527,200.00 buah
Rp 117,600.00 buah
Rp 618,000.00 buah
Rp 432,000.00 buah
Rp 277,200.00 buah
Rp 15,120.00 meter
Rp 18,720.00 meter
Rp 58,800.00 meter
Rp 504,000.00 buah
Rp 756,000.00 unit
Rp 6,720,000.00 unit
Rp 300,000.00 buah

Rp 66,000,000.00 unit
nitor LED  24" Rp 5,640,000.00 unit
Rp 2,640,000.00 unit
8 Port TL SG3210 Rp 960,000.00 unit
DGS-1005A] 5 port Rp 300,000.00 unit
Rp 6,000,000.00 unit
Rp 9,600,000.00 buah
Rp 9,600,000.00 buah
Rp 4,800,000.00 unit

Rp 19,200,000.00 unit
Rp 8,400,000.00 unit
Rp 4,704,000.00 unit
Rp 1,428,000.00 unit
Rp 65,000.00 buah
Rp 15,600.00 meter

Rp 7,200.00 /buah
Rp 600.00 /buah
Rp 84,000.00 /buah
Rp 4,800.00 meter
Rp 6,000.00 meter
Rp 1,800.00 buah
Rp 2,400.00 buah
Rp 7,200.00 buah
Rp 7,200.00 roll
Rp 600.00 buah
Rp 2,400.00 buah

100 m Lengkap Rp 66,000,000.00 titik


20 mmx12 m Maximum 1 Ohm Rp 6,000,000.00 Titik
0 mmx12 m Maximum 2 Ohm Rp 4,800,000.00 Titik
000x10 mm Rp 2,400,000.00 Titik
B Maximum 2 Ohm Rp 3,600,000.00
Rp 1,800,000.00 Buah
Rp 90,000,000.00 ls
Rp 150,000.00 buah
Rp 180,000.00 buah
Rp 78,000.00 buah
ANALISA HARGA SATUAN PEKERJAAN MEKANIKAL DAN ELEKTR

No. Uraian Koefisien Satuan

a b c d
O.10 1 M1 PEMASANGAN PIPA PVC AW DIAMETER 1/2"
A BAHAN
1 Pipa PVC 1.2000 m1
2 Perlengkapan 1.0000 ls
B TENAGA
1 Pekerja 0.0360 Oh
2 Tukang Pipa 0.0600 Oh
3 Kepala Tukang 0.0060 Oh
4 Mandor 0.0020 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
O.11 1 M1 PEMASANGAN PIPA PVC AW DIAMETER 3/4"
A BAHAN
1 Pipa PVC 1.2000 m1
2 Perlengkapan 1.0000 ls
B TENAGA
1 Pekerja 0.0360 Oh
2 Tukang Pipa 0.0600 Oh
3 Kepala Tukang 0.0060 Oh
4 Mandor 0.0020 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
O.12 1 M PEMASANGAN PIPA PVC AW DIAMETER 1"
1

A BAHAN
1 Pipa PVC 1.2000 m1
2 Perlengkapan 1.0000 ls
B TENAGA
1 Pekerja 0.0360 Oh
2 Tukang Pipa 0.0600 Oh
3 Kepala Tukang 0.0060 Oh
4 Mandor 0.0020 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
O.13 1 M PEMASANGAN PIPA PVC AW DIAMETER 1 1/4"
1

A BAHAN
1 Pipa PVC 1.2000 m1
2 Perlengkapan 1.0000 ls
B TENAGA
1 Pekerja 0.0540 Oh
2 Tukang Pipa 0.0900 Oh
3 Kepala Tukang 0.0090 Oh
4 Mandor 0.0030 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
O.14 1 M PEMASANGAN PIPA PVC AW DIAMETER 1 1/2"
1

A BAHAN
1 Pipa PVC 1.2000 m1
2 Perlengkapan 1.0000 ls
B TENAGA
1 Pekerja 0.0540 Oh
2 Tukang Pipa 0.0900 Oh
3 Kepala Tukang 0.0090 Oh
4 Mandor 0.0030 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
O.15 1 M PEMASANGAN PIPA PVC AW DIAMETER 2"
1

A BAHAN
1 Pipa PVC 1.2000 m1
2 Perlengkapan 1.0000 ls
B TENAGA
1 Pekerja 0.0540 Oh
2 Tukang Pipa 0.0900 Oh
3 Kepala Tukang 0.0090 Oh
4 Mandor 0.0030 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
O.16 1 M PEMASANGAN PIPA PVC AW DIAMETER 2 1/2"
1

A BAHAN
1 Pipa PVC 1.2000 m1
2 Perlengkapan 1.0000 ls
B TENAGA
1 Pekerja 0.0810 Oh
2 Tukang Pipa 0.1350 Oh
3 Kepala Tukang 0.0135 Oh
4 Mandor 0.0040 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
O.17 1 M PEMASANGAN PIPA PVC AW DIAMETER 3"
1

A BAHAN
1 Pipa PVC 1.2000 m1
2 Perlengkapan 1.0000 ls
B TENAGA
1 Pekerja 0.0810 Oh
2 Tukang Pipa 0.1350 Oh
3 Kepala Tukang 0.0135 Oh
4 Mandor 0.0040 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
O.18 1 M1 PEMASANGAN PIPA PVC AW DIAMETER 4"
A BAHAN
1 Pipa PVC 1.2000 m1
2 Perlengkapan 1.0000 ls
B TENAGA
1 Pekerja 0.0810 Oh
2 Tukang Pipa 0.1350 Oh
3 Kepala Tukang 0.0135 Oh
4 Mandor 0.0040 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
O.19 1 M1 PEMASANGAN PIPA PVC AW DIAMETER 5"
A BAHAN
1 Pipa PVC 1.2000 m1
2 Perlengkapan 1.0000 ls
B TENAGA
1 Pekerja 0.0810 Oh
2 Tukang Pipa 0.1350 Oh
3 Kepala Tukang 0.0135 Oh
4 Mandor 0.0040 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
O.20 1 M PEMASANGAN PIPA PVC AW DIAMETER 6"
1

A BAHAN
1 Pipa PVC 1.2000 m1
2 Perlengkapan 1.0000 ls
B TENAGA
1 Pekerja 0.0810 Oh
2 Tukang Pipa 0.1350 Oh
3 Kepala Tukang 0.0135 Oh
4 Mandor 0.0040 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
O.21 1 M PEMASANGAN PIPA PVC AW DIAMETER 4" UNTUK SALURAN
1

A BAHAN
1 Pipa PVC 1.2000 m1
B TENAGA
1 Pekerja 0.0810 Oh
2 Tukang Pipa 0.1350 Oh
3 Kepala Tukang 0.0135 Oh
4 Mandor 0.0040 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
O.22 1 M PEMASANGAN PIPA PVC D DIAMETER 1 1/2"
1

A BAHAN
1 Pipa PVC 1.2000 m1
2 Perlengkapan 1.0000 ls
B TENAGA
1 Pekerja 0.0540 Oh
2 Tukang Pipa 0.0900 Oh
3 Kepala Tukang 0.0090 Oh
4 Mandor 0.0030 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
O.26 1 M PEMASANGAN PIPA PVC D DIAMETER 3"
1

A BAHAN
1 Pipa PVC 1.2000 m1
2 Perlengkapan 1.0000 ls
B TENAGA
1 Pekerja 0.0810 Oh
2 Tukang Pipa 0.1350 Oh
3 Kepala Tukang 0.0135 Oh
4 Mandor 0.0040 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
O.29 1 M PEMASANGAN PIPA BLACK STEEL SCH. 40 DIAMETER 1"
1

A BAHAN
1 Pipa Black Steel Sch. 40 1.0000 m1
2 Perlengkapan 1.0000 ls
B TENAGA
1 Tukang Pipa 0.0500 Oh
2 Kepala Tukang 0.0500 Oh
3 Mandor 0.0250 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
O.97 1 BUAH PEKERJAAN BAK KONTROL UKURAN 40 X 40 CM
A BAHAN
1 Pek. Pasangan bata 1 : 3 0.8000 m2
2 Pek. Plesteran 1 : 3 0.8000 m2
3 Pek. Acian 0.9000 m2
4 Pek. Screed Beton 0.0080 m2
5 Galian tanah 0.2500 m3
6 Urugan kembali 0.2186 m2
B TENAGA
1 Pekerja 0.2500 Oh
2 Mandor 0.0250 Oh
C PERALATAN
D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)

1 Unit Pompa Transfer 250ltr/mnt , Head 35, mtr 3 kW ,Lkp Inst.listrik


A BAHAN
1 Pompa Transfer 250ltr/mnt , Head 35, mtr 3 kW ,Lkp Inst.listrik 1.0000 bh
2 Perlengkapan 1.0000 ls
B TENAGA
1 Tukang Pipa 0.0500 Oh
2 Kepala Tukang 0.0500 Oh
3 Mandor 0.0250 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
1 BUAH PEMASANGAN FOOT VALVE DIAMETER 4"
A BAHAN
1 Foot Valve 1.0000 bh
B TENAGA
1 Tukang Pipa 0.1667 Oh
2 Kepala Tukang 0.1667 Oh
3 Mandor 0.0833 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
1 BUAH PEMASANGAN GATE VALVE (FLANGE) CLASS 10K, CAST IRON - NON RAISE STEM KIT
A BAHAN
1 Gate Valve 1.0000 bh
B TENAGA
1 Tukang Pipa 0.1667 Oh
2 Kepala Tukang 0.1667 Oh
3 Mandor 0.0833 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
1 M1 Pemipaan Air kotor padat PVC Kelas 10 kg/cm2 Diameter 100 mm
A BAHAN
1 Pipa PVC 1.2000 m1
2 Perlengkapan 1.0000 ls
B TENAGA
1 Pekerja 0.0810 Oh
2 Tukang Pipa 0.1350 Oh
3 Kepala Tukang 0.0135 Oh
4 Mandor 0.0040 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
1 M Pemipaan Air kotor padat PVC Kelas 10 kg/cm2 Diameter 80 mm
1

A BAHAN
1 Pipa PVC 1.2000 m1
2 Perlengkapan 1.0000 ls
B TENAGA
1 Pekerja 0.0810 Oh
2 Tukang Pipa 0.1350 Oh
3 Kepala Tukang 0.0135 Oh
4 Mandor 0.0040 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
1 M Pemipaan Air kotor padat PVC Kelas 10 kg/cm2 Diameter 65 mm
1

A BAHAN
1 Pipa PVC 1.2000 m1
2 Perlengkapan 1.0000 ls
B TENAGA
1 Pekerja 0.0810 Oh
2 Tukang Pipa 0.1350 Oh
3 Kepala Tukang 0.0135 Oh
4 Mandor 0.0040 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
1 M Pemipaan Air kotor padat PVC Kelas 10 kg/cm2 Diameter 50 mm
1

A BAHAN
1 Pipa PVC 1.2000 m1
2 Perlengkapan 1.0000 ls
B TENAGA
1 Pekerja 0.0540 Oh
2 Tukang Pipa 0.0900 Oh
3 Kepala Tukang 0.0090 Oh
4 Mandor 0.0030 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
1 UNIT PEMASANGAN PANEL MDP
A BAHAN
1 Panel LVMDP (dengan MCCB 630 A / 50 kA) 1.0000 unit
2 Alat Bantu 1.0000 bh
B TENAGA
1 Tukang Listrik 3.0000 Oh
2 Kepala Tukang Listrik 3.0000 Oh
3 Mandor 3.0000 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
1 M PEMASANGAN Dari MDP ke LP,NYY 4 x 4 mm2 + NYA 4mm2
1

A BAHAN
1 Kabel NYY 4 x 4 MM2 1.0000 m1
2 Kabel NYA 1 x 4 MM2 1.0000 m1
B TENAGA
1 Tukang 0.0167 Oh
2 Kepala Tukang Listrik 0.0167 Oh
3 Mandor 0.0083 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
1 M1 PEMASANGAN Dari MDP ke PP-R. Rawat Inap ,NYY 4 x 4 mm2 + NYA 4mm2
A BAHAN
1 Kabel NYY 4 x 4 MM2 1.0000 m1
2 Kabel NYA 1 x 4 MM2 1.0000 m1
B TENAGA
1 Tukang 0.0167 Oh
2 Kepala Tukang Listrik 0.0167 Oh
3 Mandor 0.0083 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
1 M PEMASANGAN Dari MDP ke PP-Booster Pump, NYY 4 x 4 mm2+NYA 4mm2
1

A BAHAN
1 Kabel NYY 4 x 4 MM2 1.0000 m1
2 Kabel NYA 1 x 4 MM2 1.0000 m1
B TENAGA
1 Tukang 0.0167 Oh
2 Kepala Tukang Listrik 0.0167 Oh
3 Mandor 0.0083 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
1 UNIT PEMASANGAN PANEL SDP
A BAHAN
1 MCCB 125 A / 3 Fasa 1.0000 bh
2 MCCB 100 A / 3 Fasa 1.0000 bh
3 MCB 32 A / 3 Fasa 4.0000 bh
4 Pilot Lamp 3.0000 bh
5 Selector Switch M-O-A 2P 1.0000 bh
6 Fuse & Indicator 1.0000 bh
7 Box Panel (180 x 80 x 60) cm 1.0000 unit
8 Grounding BC 70 mm2 1.0000 ls
9 Material Bantu 1.0000 ls
- CU Bars
- Sepatu Kabel
-Roll Isolator
- Spiral Duck Kabel
- Duck Kabel
- Mur Baut
B TENAGA
1 Tukang Listrik 2.0000 Oh
2 Kepala Tukang Listrik 2.0000 Oh
3 Mandor 2.0000 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
1 M1 PEMASANGAN Dari SDP ke LP,NYY 4 x 4 mm2 + NYA 4mm2
A BAHAN
1 Kabel NYY 4 x 4 MM2 1.0000 m1
2 Kabel NYA 1 x 4 MM2 1.0000 m1
B TENAGA
1 Tukang 0.0167 Oh
2 Kepala Tukang Listrik 0.0167 Oh
3 Mandor 0.0083 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
1 M1 PEMASANGAN Dari SDP ke PP-R. Rawat Inap ,NYY 4 x 4 mm2 + NYA 4mm2
A BAHAN
1 Kabel NYY 4 x 4 MM2 1.0000 m1
2 Kabel NYA 1 x 4 MM2 1.0000 m1
B TENAGA
1 Tukang 0.0167 Oh
2 Kepala Tukang Listrik 0.0167 Oh
3 Mandor 0.0083 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
1 UNIT PEMASANGAN Panel Listrik : PP - BP
A BAHAN
1 MCB 6 A / 1 Fasa 3.0000 bh
2 MCB 10 A / 3 Fasa 1.0000 bh
3 MCB 16 A / 3 Fasa 1.0000 bh
4 MCB 200 A / 3 Fasa 2.0000 bh
5 Pilot Lamp 3.0000 bh
6 Fuse & Indicator 1.0000 bh
7 Box Panel (43 x 33 x 20) cm 1.0000 unit
8 Grounding BC 50 mm2 1.0000 ls
9 Material Bantu 1.0000 ls
- CU Bars
- Sepatu Kabel
- Roll Isolator
- Spiral Duck Kabel
- Duck Kabel
- Mur Baut
B TENAGA
1 Tukang Listrik 1.0000 Oh
2 Kepala Tukang Listrik 1.0000 Oh
3 Mandor 0.5000 Oh
C PERALATAN
D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
1 UNIT PEMASANGAN Panel Listrik : PP - LF
A BAHAN
1 MCCB 100 A / 3 Fasa 1.0000 bh
2 MCB 30 A / 3 Fasa 1.0000 bh
3 MCB 16 A / 3 Fasa 1.0000 bh
4 MCB 80 A / 3 Fasa 2.0000 bh
5 Pilot Lamp 3.0000 bh
6 Fuse & Indicator 1.0000 bh
7 Box Panel (50 x 70 x 30) cm 1.0000 unit
8 Grounding BC 50 mm2 1.0000 ls
9 Material Bantu 1.0000 ls
- CU Bars
- Sepatu Kabel
- Roll Isolator
- Spiral Duck Kabel
- Duck Kabel
- Mur Baut
B TENAGA
1 Tukang Listrik 1.0000 Oh
2 Kepala Tukang Listrik 1.0000 Oh
3 Mandor 0.5000 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
1 UNIT PEMASANGAN Panel Listrik : PP - DW
A BAHAN
1 MCB 6 A / 1 Fasa 3.0000 bh
2 MCB 10 A / 3 Fasa 1.0000 bh
3 MCB 16 A / 3 Fasa 1.0000 bh
4 MCB 200 A / 3 Fasa 2.0000 bh
5 Pilot Lamp 3.0000 bh
6 Fuse & Indicator 1.0000 bh
7 Box Panel (43 x 33 x 20) cm 1.0000 unit
8 Grounding BC 50 mm2 1.0000 ls
9 Material Bantu 1.0000 ls
- CU Bars
- Sepatu Kabel
- Roll Isolator
- Spiral Duck Kabel
- Duck Kabel
- Mur Baut
B TENAGA
1 Tukang Listrik 1.0000 Oh
2 Kepala Tukang Listrik 1.0000 Oh
3 Mandor 0.5000 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
1 M PEMASANGAN Instalasi stop kontak, NYM 4 x 2,5 mm2+NYA 2,5mm2 dalam conduit PVC
1

A BAHAN
1 Kabel NYFGbY 1.0000 m1
2 Galian, Urugan, dan Pelindung Kabel 1.0000 m1
B TENAGA
1 Tukang 0.0833 Oh
2 Kepala Tukang Listrik 0.0833 Oh
3 Mandor 0.0833 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
1 BUAH PEMASANGAN Lampu Down Light LED 7 W
A BAHAN
1 Lampu Down Light LED 7 W 1.0000 bh
2 Instalasi Kabel 1.0000 Titik
B TENAGA
1 Tukang Listrik 0.0667 Oh
2 Kepala Tukang Listrik 0.0667 Oh
3 Mandor 0.0333 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
1 BUAH PEMASANGAN SAKLAR TUNGGAL
A BAHAN
1 Saklar Tunggal 1.0000 bh
B TENAGA
1 Tukang Listrik 0.0500 Oh
2 Kepala Tukang Listrik 0.0500 Oh
3 Mandor 0.0250 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
1 BUAH PEMASANGAN SAKLAR GANDA
A BAHAN
1 Saklar Ganda 1.0000 bh
B TENAGA
1 Tukang Listrik 0.0500 Oh
2 Kepala Tukang Listrik 0.0500 Oh
3 Mandor 0.0250 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
1 BUAH PEMASANGAN SAKLAR TUKAR
A BAHAN
1 Saklar Tukar 1.0000 bh
B TENAGA
1 Tukang Listrik 0.0500 Oh
2 Kepala Tukang Listrik 0.0500 Oh
3 Mandor 0.0250 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
1 BUAH PEMASANGAN Stop Kontak
A BAHAN
1 Stop Kontak 1.0000 bh
B TENAGA
1 Tukang Listrik 0.0500 Oh
2 Kepala Tukang Listrik 0.0500 Oh
3 Mandor 0.0250 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
1 M PEMASANGAN PIPA BSP Sch.40 diameter 100 mm
1

A BAHAN
1 Pipa BSP Sch. 40 Diameter 100 mm 1.0000 m1
2 Perlengkapan 1.0000 ls
B TENAGA
1 Tukang Pipa 0.1333 Oh
2 Kepala Tukang 0.1333 Oh
3 Mandor 0.0667 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
1 BUAH PEMASANGAN Indicating Valve diameter 100 mm
A BAHAN
1 Indicating Valve diameter 100 mm 1.0000 bh
B TENAGA
1 Tukang Listrik 0.0500 Oh
2 Kepala Tukang Listrik 0.0500 Oh
3 Mandor 0.0250 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
1 M1 PEMASANGAN Pipa BSP Sch.40 diameter 80 mm
A BAHAN
1 Pipa BSP Sch.40 diameter 80 mm 1.0000 m1
2 Perlengkapan 1.0000 ls
B TENAGA
1 Tukang Pipa 0.0833 Oh
2 Kepala Tukang 0.0833 Oh
3 Mandor 0.0417 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
1 M1 PEMASANGAN Pipa BSP Sch.40 diameter 65 mm
A BAHAN
1 Pipa BSP Sch.40 diameter 65 mm 1.0000 m1
2 Perlengkapan 1.0000 ls
B TENAGA
1 Tukang Pipa 0.0833 Oh
2 Kepala Tukang 0.0833 Oh
3 Mandor 0.0417 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
1 M Pemasangan Pipa BSP Sch.40 diameter 32 mm
1

A BAHAN
1 Pemasangan Pipa BSP Sch.40 diameter 32 mm 1.0000 m1
2 Perlengkapan 1.0000 ls
B TENAGA
1 Tukang Pipa 0.0500 Oh
2 Kepala Tukang 0.0500 Oh
3 Mandor 0.0250 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
1 M1 PEMASANGAN PIPA BSP Sch.40 diameter 25 mm
A BAHAN
1 PIPA BSP Sch.40 diameter 25 mm 1.0000 m1
2 Perlengkapan 1.0000 ls
B TENAGA
1 Tukang Pipa 0.0500 Oh
2 Kepala Tukang 0.0500 Oh
3 Mandor 0.0250 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
1 UNIT PEMASANGAN IU Kapasitas : 4 500 BTU/h - Wall Type
A BAHAN
1 IU Kapasitas : 4 500 BTU/h - Wall Type 1.0000 unit
2 Alat Bantu 1.0000 bh
B TENAGA
1 Tukang Listrik 3.0000 Oh
2 Kepala Tukang Listrik 3.0000 Oh
3 Mandor 3.0000 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
1 UNIT PEMASANGAN IU Kapasitas : 9000 BTU/h - Wall Type
A BAHAN
1 IU Kapasitas : 9000 BTU/h - Wall Type 1.0000 unit
2 Alat Bantu 1.0000 bh
B TENAGA
1 Tukang Listrik 3.0000 Oh
2 Kepala Tukang Listrik 3.0000 Oh
3 Mandor 3.0000 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
1 UNIT PEMASANGAN IU Kapasitas : 12500 BTU/h - Wall Type
A BAHAN
1 IU Kapasitas : 12500 BTU/h - Wall Type 1.0000 unit
2 Alat Bantu 1.0000 bh
B TENAGA
1 Tukang Listrik 3.0000 Oh
2 Kepala Tukang Listrik 3.0000 Oh
3 Mandor 3.0000 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
1 TITIK INSTALASI DAYA UNIT OUTDOOR UNIT AC
A BAHAN
1 Kabel NYY 4 x 35 mm2 14.0000 m1
2 Kontrol Way Delta 1.0000 bh
3 Isolasi Ban 1.0000 bh
B TENAGA
1 Tukang Listrik 0.5000 Oh
2 Kepala Tukang Listrik 0.5000 Oh
3 Mandor 0.2000 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
1 TITIK INSTALASI DAYA UNIT INDOOR UNIT AC
A BAHAN
1 Kabel NYM 4 x 4 mm2 16.0000 m1
2 Isolasi Ban 1.0000 bh
B TENAGA
1 Tukang Listrik 0.3000 Oh
2 Kepala Tukang Listrik 0.3000 Oh
3 Mandor 0.1667 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
1 Unit Ceiling Exhaust Air Fan , Kapasitas : 170 CFM - Duct Type
A BAHAN

1 Ceiling Exhaust Air Fan , Kapasitas : 170 CFM - Duct Type 1.0000 bh

2 Isolasi Ban 1.0000 bh


B TENAGA
1 Tukang Listrik 0.3000 Oh
2 Kepala Tukang Listrik 0.3000 Oh
3 Mandor 0.1667 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
1 Unit Pemipaan Ventilasi Udara ( Exhaust Fan ) dan Ducting 250 x 250
A BAHAN

1 Pemipaan Ventilasi Udara ( Exhaust Fan ) dan Ducting 250 x 250 1.0000 bh

2 Isolasi Ban 1.0000 bh


B TENAGA
1 Tukang Listrik 0.3000 Oh
2 Kepala Tukang Listrik 0.3000 Oh
3 Mandor 0.1667 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
1 Unit Hospital Bed Elevator
A BAHAN
1 Hospital Bed Elevator 1.0000 bh
B TENAGA
1 Tukang Listrik 0.3000 Oh
2 Kepala Tukang Listrik 0.3000 Oh
3 Mandor 0.1667 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
1 M1 Instalasi Pemipaan tembaga standart ASTM B.88 Type L DIAMETER 1"
A BAHAN
Instalasi Pemipaan tembaga standart ASTM B.88 Type L
1 1.0000 m1
DIAMETER 1"
2 Alat Bantu dan Penunjang 1.0000 ls
B TENAGA
1 Tukang Pipa 0.0333 Oh
2 Kepala Tukang Pipa 0.0333 Oh
3 Mandor 0.0167 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
1 Unit Cabinet Rack
A BAHAN
1 Cabinet Rack 1.0000 bh
2 Alat Bantu dan Penunjang 1.0000 ls
B TENAGA
1 Tukang 0.0333 Oh
2 Kepala Tukang 0.0333 Oh
3 Mandor 0.0167 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
1 Unit TBS-1
A BAHAN
1 TBS-1 1.0000 bh
2 Alat Bantu dan Penunjang 1.0000 ls
B TENAGA
1 Tukang 0.0333 Oh
2 Kepala Tukang 0.0333 Oh
3 Mandor 0.0167 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
1 Unit FACP 4 Zone Konvensional
A BAHAN
1 FACP 4 Zone Konvensional 1.0000 bh
2 Alat Bantu dan Penunjang 1.0000 ls
B TENAGA
1 Tukang 0.0333 Oh
2 Kepala Tukang 0.0333 Oh
3 Mandor 0.0167 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
1 M1 Kabel dari FACP ke TBF-B1, NYA 2x1,5 m2
A BAHAN
1 Kabel dari FACP ke TBF-B1, NYA 2x1,5 m2 1.0000 m1
2 Perlengkapan 1.0000 ls
B TENAGA
1 Tukang Pipa 0.0500 Oh
2 Kepala Tukang 0.0500 Oh
3 Mandor 0.0250 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
1 Unit Manual Break Glass
A BAHAN
1 Manual Break Glass 1.0000 bh
2 Alat Bantu dan Penunjang 1.0000 ls
B TENAGA
1 Tukang 0.0333 Oh
2 Kepala Tukang 0.0333 Oh
3 Mandor 0.0167 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
1 Unit Bell Alarm
A BAHAN
1 Bell Alarm 1.0000 bh
2 Alat Bantu dan Penunjang 1.0000 ls
B TENAGA
1 Tukang 0.0333 Oh
2 Kepala Tukang 0.0333 Oh
3 Mandor 0.0167 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
1 Unit Socket Outlet Data LAN
A BAHAN
1 Socket Outlet Data LAN 1.0000 bh
2 Alat Bantu dan Penunjang 1.0000 ls
B TENAGA
1 Tukang 0.0333 Oh
2 Kepala Tukang 0.0333 Oh
3 Mandor 0.0167 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
1 Unit Outlet Telepon (extension Line)
A BAHAN
1 Outlet Telepon (extension Line) 1.0000 bh
2 Alat Bantu dan Penunjang 1.0000 ls
B TENAGA
1 Tukang 0.0333 Oh
2 Kepala Tukang 0.0333 Oh
3 Mandor 0.0167 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
1 Unit Oulet Antena TV
A BAHAN
1 Oulet Antena TV 1.0000 bh
2 Alat Bantu dan Penunjang 1.0000 ls
B TENAGA
1 Tukang 0.0333 Oh
2 Kepala Tukang 0.0333 Oh
3 Mandor 0.0167 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
NIKAL DAN ELEKTRIKAL

Harga satuan Jumlah Harga


(Rp) (Rp)
e f

5,550.00 6,660.00
1,942.50 1,942.50

80,000.00 2,880.00
100,000.00 6,000.00
130,000.00 780.00
140,000.00 280.00

18,542.50
1,854.25
20,396.75
20,390.00

7,675.00 9,210.00
2,686.25 2,686.25

80,000.00 2,880.00
100,000.00 6,000.00
130,000.00 780.00
140,000.00 280.00

21,836.25
2,183.63
24,019.88
24,010.00

10,475.00 12,570.00
3,666.25 3,666.25

80,000.00 2,880.00
100,000.00 6,000.00
130,000.00 780.00
140,000.00 280.00

26,176.25
2,617.63
28,793.88
28,790.00

15,675.00 18,810.00
5,486.25 5,486.25

80,000.00 4,320.00
100,000.00 9,000.00
130,000.00 1,170.00
140,000.00 420.00

39,206.25
3,920.63
43,126.88
43,120.00

17,975.00 21,570.00
6,291.25 6,291.25

80,000.00 4,320.00
100,000.00 9,000.00
130,000.00 1,170.00
140,000.00 420.00

42,771.25
4,277.13
47,048.38
47,040.00

23,025.00 27,630.00
8,058.75 8,058.75

80,000.00 4,320.00
100,000.00 9,000.00
130,000.00 1,170.00
140,000.00 420.00

50,598.75
5,059.88
55,658.63
55,650.00

33,575.00 40,290.00
11,751.25 11,751.25

80,000.00 6,480.00
100,000.00 13,500.00
130,000.00 1,755.00
140,000.00 560.00

74,336.25
7,433.63
81,769.88
81,760.00

47,275.00 56,730.00
16,546.25 16,546.25

80,000.00 6,480.00
100,000.00 13,500.00
130,000.00 1,755.00
140,000.00 560.00

95,571.25
9,557.13
105,128.38
105,120.00

78,350.00 94,020.00
47,010.00 47,010.00

80,000.00 6,480.00
100,000.00 13,500.00
130,000.00 1,755.00
140,000.00 560.00

163,325.00
16,332.50
179,657.50
179,650.00
124,150.00 148,980.00
74,490.00 74,490.00

80,000.00 6,480.00
100,000.00 13,500.00
130,000.00 1,755.00
140,000.00 560.00

245,765.00
24,576.50
270,341.50
270,340.00

174,100.00 208,920.00
104,460.00 104,460.00

80,000.00 6,480.00
100,000.00 13,500.00
130,000.00 1,755.00
140,000.00 560.00

335,675.00
33,567.50
369,242.50
369,240.00

78,350.00 94,020.00

80,000.00 6,480.00
100,000.00 13,500.00
130,000.00 1,755.00
140,000.00 560.00

116,315.00
11,631.50
127,946.50
127,940.00

11,125.00 13,350.00
13,350.00 13,350.00

80,000.00 4,320.00
100,000.00 9,000.00
130,000.00 1,170.00
140,000.00 420.00

41,610.00
4,161.00
45,771.00
45,770.00

25,575.00 30,690.00
8,951.25 8,951.25

80,000.00 6,480.00
100,000.00 13,500.00
130,000.00 1,755.00
140,000.00 560.00

61,936.25
6,193.63
68,129.88
68,120.00

41,516.67 41,516.67
4,151.67 4,151.67

100,000.00 5,000.00
130,000.00 6,500.00
140,000.00 3,500.00

60,668.33
6,066.83
66,735.17
66,730.00

107,716.25 86,173.00
45,861.40 36,689.12
38,556.25 34,700.63
41,311.40 330.49
78,000.00 19,500.00
29,250.00 6,394.05

80,000.00 20,000.00
140,000.00 3,500.00
207,287.29
20,728.73
228,016.01
228,010.00

10,823,000.00 10,823,000.00
107,500.00 107,500.00

100,000.00 5,000.00
130,000.00 6,500.00
140,000.00 3,500.00

10,945,500.00
1,094,550.00
12,040,050.00
12,040,000.00 12040000

3,145,200.00 3,145,200.00

121,000.00 20,166.67
135,000.00 22,500.00
145,000.00 12,083.33

3,199,950.00
319,995.00
3,519,945.00
3,519,940.00 3,519,940.00
RON - NON RAISE STEM KITZ DIAMETER 3"

2,966,900.00 2,966,900.00

121,000.00 20,166.67
135,000.00 22,500.00
145,000.00 12,083.33
3,021,650.00
302,165.00
3,323,815.00
3,323,810.00 3,323,810.00

78,350.00 94,020.00
47,010.00 47,010.00

100,000.00 8,100.00
121,000.00 16,335.00
135,000.00 1,822.50
145,000.00 580.00

167,867.50
16,786.75
184,654.25
184,650.00 184,650.00

47,275.00 56,730.00
16,546.25 16,546.25

100,000.00 8,100.00
121,000.00 16,335.00
135,000.00 1,822.50
145,000.00 580.00

100,113.75
10,011.38
110,125.13
110,120.00 110,120.00

33,575.00 40,290.00
11,751.25 11,751.25

100,000.00 8,100.00
121,000.00 16,335.00
135,000.00 1,822.50
145,000.00 580.00

78,878.75
7,887.88
86,766.63
86,760.00 86,760.00

23,025.00 27,630.00
8,058.75 8,058.75

100,000.00 5,400.00
121,000.00 10,890.00
135,000.00 1,215.00
145,000.00 435.00

53,628.75
5,362.88
58,991.63
58,990.00 58,990.00

135,380,000.00 135,380,000.00
676,900.00 676,900.00

121,000.00 363,000.00
135,000.00 405,000.00
145,000.00 435,000.00

137,259,900.00
13,725,990.00
150,985,890.00
150,985,890.00 150,985,890.00

45,900.00 45,900.00
5,800.00 5,800.00

121,000.00 2,016.67
135,000.00 2,250.00
145,000.00 1,208.33

57,175.00
5,717.50
62,892.50
62,890.00 62,890.00

45,900.00 45,900.00
5,800.00 5,800.00
121,000.00 2,016.67
135,000.00 2,250.00
145,000.00 1,208.33

57,175.00
5,717.50
62,892.50
62,890.00

45,900.00 45,900.00
5,800.00 5,800.00

121,000.00 2,016.67
135,000.00 2,250.00
145,000.00 1,208.33

57,175.00
5,717.50
62,892.50
62,890.00

2,145,800.00 2,145,800.00
1,481,400.00 1,481,400.00
1,061,800.00 4,247,200.00
124,600.00 373,800.00
156,200.00 156,200.00
195,400.00 195,400.00
5,144,200.00 5,144,200.00
290,000.00 290,000.00
307,980.00 307,980.00

121,000.00 242,000.00
135,000.00 270,000.00
145,000.00 290,000.00

15,143,980.00
1,514,398.00
16,658,378.00
16,658,370.00 16,658,370.00
45,900.00 45,900.00
5,800.00 5,800.00

121,000.00 2,016.67
135,000.00 2,250.00
145,000.00 1,208.33

57,175.00
5,717.50
62,892.50
62,890.00

45,900.00 45,900.00
5,800.00 5,800.00

121,000.00 2,016.67
135,000.00 2,250.00
145,000.00 1,208.33

57,175.00
5,717.50
62,892.50
62,890.00

58,000.00 174,000.00
244,700.00 244,700.00
244,700.00 244,700.00
2,404,900.00 4,809,800.00
124,600.00 373,800.00
195,400.00 195,400.00
1,353,800.00 1,353,800.00
160,200.00 160,200.00
738,240.00 738,240.00

121,000.00 121,000.00
135,000.00 135,000.00
145,000.00 72,500.00
8,623,140.00
862,314.00
9,485,454.00
9,485,450.00 9,485,450.00

1,481,400.00 1,481,400.00
1,061,800.00 1,061,800.00
244,700.00 244,700.00
1,481,400.00 2,962,800.00
124,600.00 373,800.00
195,400.00 195,400.00
1,700,000.00 1,700,000.00
16,500.00 16,500.00
803,640.00 803,640.00

121,000.00 121,000.00
135,000.00 135,000.00
145,000.00 72,500.00

9,168,540.00
916,854.00
10,085,394.00
10,085,390.00 10,085,390.00

58,000.00 174,000.00
244,700.00 244,700.00
244,700.00 244,700.00
2,404,900.00 4,809,800.00
124,600.00 373,800.00
195,400.00 195,400.00
1,353,800.00 1,353,800.00
160,200.00 160,200.00
738,240.00 738,240.00

121,000.00 121,000.00
135,000.00 135,000.00
145,000.00 72,500.00

8,623,140.00
862,314.00
9,485,454.00
9,485,450.00 9,485,450.00
m2 dalam conduit PVC

69,600.00 69,600.00
107,250.00 107,250.00

121,000.00 10,083.33
135,000.00 11,250.00
145,000.00 12,083.33

210,266.67
21,026.67
231,293.33
231,290.00 231,290.00

124,000.00 124,000.00
30,000.00 30,000.00

121,000.00 8,066.67
135,000.00 9,000.00
145,000.00 4,833.33

175,900.00
17,590.00
193,490.00
193,500.00 193,500.00

32,200.00 32,200.00

121,000.00 6,050.00
135,000.00 6,750.00
145,000.00 3,625.00

48,625.00
4,862.50
53,487.50
53,480.00 53,480.00
37,600.00 37,600.00

121,000.00 6,050.00
135,000.00 6,750.00
145,000.00 3,625.00

54,025.00
5,402.50
59,427.50
59,420.00 59,420.00

32,200.00 32,200.00

121,000.00 6,050.00
135,000.00 6,750.00
145,000.00 3,625.00

48,625.00
4,862.50
53,487.50
53,480.00 53,480.00

30,940.00 30,940.00

121,000.00 6,050.00
135,000.00 6,750.00
145,000.00 3,625.00

47,365.00
4,736.50
52,101.50
52,100.00 52,100.00

265,950.00 265,950.00
26,595.00 26,595.00

121,000.00 16,133.33
135,000.00 18,000.00
145,000.00 9,666.67

336,345.00
33,634.50
369,979.50
369,970.00

3,394,800.00 3,394,800.00

121,000.00 6,050.00
135,000.00 6,750.00
145,000.00 3,625.00

3,411,225.00
341,122.50
3,752,347.50
3,752,300.00 3,752,300.00

187,000.00 187,000.00
18,700.00 18,700.00

121,000.00 10,083.33
135,000.00 11,250.00
145,000.00 6,041.67

233,075.00
23,307.50
256,382.50
256,380.00 256,380.00

58,000.00 58,000.00
5,500.00 5,500.00

121,000.00 10,083.33
135,000.00 11,250.00
145,000.00 6,041.67

90,875.00
9,087.50
99,962.50
100,000.00 100,000.00

56,683.33 56,683.33
5,668.33 5,668.33

121,000.00 6,050.00
135,000.00 6,750.00
145,000.00 3,625.00

78,776.66
7,877.67
86,654.33
86,650.00

41,516.67 41,516.67
4,151.67 4,151.67

121,000.00 6,050.00
135,000.00 6,750.00
145,000.00 3,625.00

62,093.34
6,209.33
68,302.67
68,300.00

4,703,900.00 4,703,900.00
676,900.00 676,900.00

121,000.00 363,000.00
135,000.00 405,000.00
145,000.00 435,000.00

6,583,800.00
658,380.00
7,242,180.00
7,242,000.00 7,242,000.00

5,015,420.00 5,015,420.00
676,900.00 676,900.00

121,000.00 363,000.00
135,000.00 405,000.00
145,000.00 435,000.00

6,895,320.00
689,532.00
7,584,852.00
7,584,800.00 7,584,800.00

5,226,420.00 5,226,420.00
676,900.00 676,900.00

121,000.00 363,000.00
135,000.00 405,000.00
145,000.00 435,000.00

7,106,320.00
710,632.00
7,816,952.00
7,816,900.00 7,816,900.00

195,100.00 2,731,400.00
250,000.00 250,000.00
7,700.00 7,700.00

121,000.00 60,500.00
135,000.00 67,500.00
145,000.00 29,000.00

3,146,100.00
314,610.00
3,460,710.00
3,460,710.00 3,460,710.00

24,700.00 395,200.00
7,700.00 7,700.00

121,000.00 36,300.00
135,000.00 40,500.00
145,000.00 24,166.67

503,866.67
50,386.67
554,253.33
554,250.00 554,250.00

1,325,050.00 1,325,050.00

50,000.00 50,000.00
121,000.00 36,300.00
135,000.00 40,500.00
145,000.00 24,166.67

1,476,016.67
147,601.67
1,623,618.33
1,623,600.00 1,623,600.00

389,500.00 389,500.00

30,000.00 30,000.00

121,000.00 36,300.00
135,000.00 40,500.00
145,000.00 24,166.67

520,466.67
52,046.67
572,513.33
572,500.00 572,500.00

468,081,000.00 468,081,000.00

121,000.00 36,300.00
135,000.00 40,500.00
145,000.00 24,166.67

468,181,966.67
46,818,196.67
515,000,163.33 515,000,000.00
515,000,000.00

193,400.00 193,400.00

48,350.00 48,350.00

121,000.00 4,033.33
135,000.00 4,500.00
145,000.00 2,416.67

252,700.00
25,270.00
277,970.00
277,970.00

2,187,800.00 2,187,800.00
218,780.00 218,780.00

121,000.00 4,033.33
135,000.00 4,500.00
145,000.00 2,416.67

2,417,530.00
241,753.00
2,659,283.00
2,659,300.00 2,659,300.00

521,900.00 521,900.00
52,190.00 52,190.00

121,000.00 4,033.33
135,000.00 4,500.00
145,000.00 2,416.67

585,040.00
58,504.00
643,544.00
643,500.00 643,500.00

585,290.00 585,290.00
58,529.00 58,529.00

121,000.00 4,033.33
135,000.00 4,500.00
145,000.00 2,416.67

654,769.00
65,476.90
720,245.90
7,202,500.00 7,202,500.00

30,650.00 30,650.00
3,000.00 3,000.00
121,000.00 6,050.00
135,000.00 6,750.00
145,000.00 3,625.00

50,075.00
5,007.50
55,082.50
55,000.00 55,000.00

275,350.00 275,350.00
27,535.00 27,535.00

121,000.00 4,033.33
135,000.00 4,500.00
145,000.00 2,416.67

313,835.00
31,383.50
345,218.50
345,200.00 345,200.00

251,120.00 251,120.00
25,112.00 25,112.00

121,000.00 4,033.33
135,000.00 4,500.00
145,000.00 2,416.67

287,182.00
28,718.20
315,900.20
315,900.00 315900

161,920.00 161,920.00
16,192.00 16,192.00

121,000.00 4,033.33
135,000.00 4,500.00
145,000.00 2,416.67

189,062.00
18,906.20
207,968.20
207,900.00 207,900.00

657,300.00 657,300.00
65,730.00 65,730.00

121,000.00 4,033.33
135,000.00 4,500.00
145,000.00 2,416.67

733,980.00
73,398.00
807,378.00
807,400.00 807,400.00

420,600.00 420,600.00
42,060.00 42,060.00

121,000.00 4,033.33
135,000.00 4,500.00
145,000.00 2,416.67

473,610.00
47,361.00
520,971.00
521,000.00 521,000.00
ANALISA HARGA SATUAN PEKERJAAN E

NO Uraian Pekerjaan Satuan


1 2 3
1 1 Titik Pemasangan instalasi penerangan
Bahan:
1 NYM 3x2.5 mm² meter
2 Pipa Conduit 20 mm² meter
3 Klem pipa conduit 20 mm² buah
4 Kabel ties buah
5 T dus buah
6 Isolasi roll
7 Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

2 1 Titik Pemasangan instalasi daya stop kontak 1 Phasa


Bahan:
a. NYM 3x2.5 mm² meter
b. Pipa Conduit 20 mm² meter
c. Klem pipa conduit 20 mm² buah
d. Kabel ties buah
e. T dus buah
f. Isolasi roll
g. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

3 1 Titik Pemasangan instalasi Fire Alarm


Bahan:
a. NYA 1x1.5 mm² meter
b. Pipa Conduit 25 mm² meter
c. Klem pipa conduit 25 mm² buah
d. Kabel ties buah
e. T dus buah
f. Isolasi roll
g. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

4 1 Titik Pemasangan instalasi Telephone/Data


Bahan:
a. Kabel Coaxial RG8 ( 0,6 mm2 ) meter
b. Pipa Conduit 25 mm² meter
c. Klem pipa conduit 25 mm² buah
d. Kabel ties buah
e. T dus buah
f. Isolasi roll
g. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju


5 1 Titik Pemasangan instalasi Speaker
Bahan:
a. Kabel NYMHY 3x1,5 mm2 meter
b. Pipa Conduit 25 mm² meter
c. Klem pipa conduit 25 mm² buah
d. Kabel ties buah
e. T dus buah
f. Isolasi roll
g. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

6 1 Titik Pemasangan instalasi daya stop kontak 3 Phasa


Bahan:
a. NYM 4x2.5 mm² meter
b. Pipa Conduit 25 mm² meter
c. Klem pipa conduit 25 mm² buah
d. Kabel ties buah
e. T dus buah
f. Isolasi roll
g. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

7 1 Set Lampu LED Bollard 10 Watt Tinggi


Bahan:
a. LED Bollard 10 Watt Tinggi buah
b. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

8 1 Set Lampu Downligth LED 10 Watt


Bahan:
a. Downligth LED 10 Watt buah
b. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju


9 1 Set Lampu Lampu Solard Cell 52 Watt+ Tiang 7 meter (lengkap Baterai)
Bahan:
a. Lampu Solard Cell 52 Watt+ Tiang 7 meter (lengkap Baterai) buah
b. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

10 1 Set Lampu TL LED 2x20 Watt RM


Bahan:
a. TL LED 2x20 Watt RM buah
b. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

11 1 Set Lampu TL LED 2x20 Watt SM


Bahan:
a. TL LED 2x20 Watt SM buah
b. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

12 1 Set Lampu TL LED 1x20 Watt SM


Bahan:
a. TL LED 1x20 Watt SM buah
b. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju


13 1 Set Lampu TL LED 1x20 Watt RM
Bahan:
a. TL LED 1x20 Watt RM buah
b. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

14 1 Set Lampu Downlight LED 7 Watt


Bahan:
a. Downlight LED 7 Watt buah
b. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

15 1 Set Saklar single


Bahan:
a. Saklar single buah
b. Inbown dus buah
c. Fisher s6 buah
d. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju


16 1 Set Saklar double
Bahan:
a. Saklar double buah
b. Inbown dus buah
c. Fisher s6 buah
d. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

17 1 Set Saklar tukar


Bahan:
a. Saklar tukar buah
b. Inbown dus buah
c. Fisher s6 buah
d. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

18 1 Set Saklar 3 gang


Bahan:
a. Saklar 3 gang buah
b. Inbown dus buah
c. Fisher s6 buah
d. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

19 1 Set Saklar 4 gang


Bahan:
a. Saklar 4 gang buah
b. Inbown dus buah
c. Fisher s6 buah
d. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju


20 1 Set Stop kontak 1 Phasa
Bahan:
a. Stop kontak 1 Phasa buah
b. Inbown dus buah
c. Fisher s6 buah
d. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju


21 1 Set Stop kontak 1 Phasa type floor
Bahan:
a. Stop kontak 1 Phasa type floor buah
b. Inbown dus buah
c. Fisher s6 buah
d. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

22 1 Set Stop kontak 3 Phasa


Bahan:
a. Stop kontak 3 Phasa buah
b. Inbown dus buah
c. Fisher s6 buah
d. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

23 1 Meter Kabel tray 200 mm


Bahan:
a. Kabel tray 200 mm buah
b. Dina Bolt 8 mm buah
c. Siku 4 buah
d. As Drat 8mm buah
e. Mur Baut 8 buah
f. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

24 1 Meter Kabel tray 300 mm


Bahan:
a. Kabel tray 300 mm buah
b. Dina Bolt 8 mm buah
c. Siku 4 buah
d. As Drat 8mm buah
e. Mur Baut 8 buah
f. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

25 1 Meter Kabel tray 400 mm


Bahan:
a. Kabel tray 400 mm buah
b. Dina Bolt 8 mm buah
c. Siku 4 buah
d. As Drat 8mm buah
e. Mur Baut 8 buah
f. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju


26 1 Meter Kabel tray 600 mm
Bahan:
a. Kabel tray 600 mm buah
b. Dina Bolt 8 mm buah
c. Siku 4 buah
d. As Drat 8mm buah
e. Mur Baut 8 buah
f. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

27 1 Buah Tee Tray 200 mm


Bahan:
a. Tee Tray 200 mm buah
b. Dina Bolt 8 mm buah
c. Siku 4 buah
d. As Drat 8mm buah
e. Mur Baut 8 buah
f. Fitting Kabel tray 5% buah
g. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

28 1 Buah Tee Tray 300 mm


Bahan:
a. Tee Tray 300 mm buah
b. Dina Bolt 8 mm buah
c. Siku 4 buah
d. As Drat 8mm buah
e. Mur Baut 8 buah
f. Fitting Kabel tray 5% buah
g. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

29 1 Buah Tee Tray 400 mm


Bahan:
a. Tee Tray 400 mm buah
b. Dina Bolt 8 mm buah
c. Siku 4 buah
d. As Drat 8mm buah
e. Mur Baut 8 buah
f. Fitting Kabel tray 5% buah
g. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju


30 1 Buah Tee Tray 600 mm
Bahan:
a. Tee Tray 600 mm buah
b. Dina Bolt 8 mm buah
c. Siku 4 buah
d. As Drat 8mm buah
e. Mur Baut 8 buah
f. Fitting Kabel tray 5% buah
g. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

31 1 Buah Elbow Tray 200 mm


Bahan:
a. Elbow Tray 200 mm buah
b. Dina Bolt 8 mm buah
c. Siku 4 buah
d. As Drat 8mm buah
e. Mur Baut 8 buah
f. Fitting Kabel tray 5% buah
g. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

32 1 Buah Elbow Tray 300 mm


Bahan:
a. Elbow Tray 300 mm buah
b. Dina Bolt 8 mm buah
c. Siku 4 buah
d. As Drat 8mm buah
e. Mur Baut 8 buah
f. Fitting Kabel tray 5% buah
g. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

33 1 Buah Elbow Tray 400 mm


Bahan:
a. Elbow Tray 400 mm buah
b. Dina Bolt 8 mm buah
c. Siku 4 buah
d. As Drat 8mm buah
e. Mur Baut 8 buah
f. Fitting Kabel tray 5% buah
g. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju


34 1 Buah Elbow Tray 600 mm
Bahan:
a. Elbow Tray 600 mm buah
b. Dina Bolt 8 mm buah
c. Siku 4 buah
d. As Drat 8mm buah
e. Mur Baut 8 buah
f. Fitting Kabel tray 5% buah
g. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju


35 Biaya penyambungan PLN
Bahan:
a. Biaya Penyambungan kva
b. Biaya Jaminan Langganan kva
c. Biaya Koordinasi Pln kva

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju


36 1 Unit Cubicle Panel TM Terpasang Lengkap Dengan Aksesoris
Bahan:
a. Cubicle Incoming Unit
b. Cubicle Metering buah
c. Cubicle Outgoing buah

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

37 1 Unit Trafo 630 kVA Terpasang Lengkap Dengan Aksesoris


Bahan:
a. Trafo 630 kVA Unit
b. Sewa Alat Berat buah

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju


38 1 Unit Capasitor Bank Kap. 232 Kvar 12 Step
Bahan:
a. Capasitor Bank Kap. 232 Kvar 12 Step Unit
b. Sewa Alat Berat buah
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

39 1 Unit GENSET 500 Kva Terpasang Lengkap Dengan Aksesoris


Bahan:
a. GENSET 500 Kva Unit
b. Perlengkapan Genset
c. Sewa Alat Berat buah

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju


40 1 Unit MCFA sEMI Addressable 24 zone
Bahan:
a. MCFA sEMI Addressable 24 zone Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

41 1 Unit MDF/ CTB


Bahan:
a. MDF/ CTB Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju


42 1 Unit Terminal Box Fire
Bahan:
a. Terminal Box Fire Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

43 1 Unit Smoke Detector


Bahan:
a. Smoke Detector Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

44 1 Unit Heat Detector


Bahan:
a. Heat Detector Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju


45 1 Unit Break Glass
Bahan:
a. Break Glass Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

46 1 Unit Alarm Bell


Bahan:
a. Alarm Bell Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

47 1 Unit Indicator Lamp


Bahan:
a. Indicator Lamp Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

48 1 Unit Twisted Shelded 18,2 PAR + NYM 2 x 2,5 mm2


Bahan:
a. Twisted Shelded 18,2 PAR + NYM 2 x 2,5 mm2 Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

49 1 Unit EOL
Bahan:
a. EOL Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

50 1 Unit Pesawat Telephone Single Line


Bahan:
a. Pesawat Telephone Single Line Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju


51 1 Unit CTB 200 Pairs
Bahan:
a. CTB 200 Pairs Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

52 1 Unit Socket Telephone RJ-11


Bahan:
a. Socket Telephone RJ-11 Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

53 1 Unit Terminal Box 10 Pairs


Bahan:
a. Terminal Box 10 Pairs Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

54 1 Unit Terminal Box 20 Pairs


Bahan:
a. Terminal Box 20 Pairs Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

55 1 Unit Terminal Box 30 Pairs


Bahan:
a. Terminal Box 30 Pairs Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

56 1 Unit Kabel ITC 10x2x2x0,6 mm2


Bahan:
a. Kabel ITC 10x2x2x0,6 mm2 Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju


57 1 Unit Kabel ITC 20x2x2x0,6 mm2
Bahan:
a. Kabel ITC 20x2x2x0,6 mm2 Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

58 1 Unit Kabel ITC 30x2x2x0,6 mm2


Bahan:
a. Kabel ITC 30x2x2x0,6 mm2 Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

59 1 Unit Kabel ITC 200x2x2x0,6 mm2


Bahan:
a. Kabel ITC 200x2x2x0,6 mm2 Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

60 1 Unit 240 W/300W Power Amplifier


Bahan:
a. 240 W/300W Power Amplifier Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

61 1 Unit Autorserve Cassete


Bahan:
a. Autorserve Cassete Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

62 1 Unit CD Playaer
Bahan:
a. CD Playaer Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju


63 1 Unit Equalizer Card ( VX-200 )
Bahan:
a. Equalizer Card ( VX-200 ) Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

64 1 Unit Mixer Frame w/ Module (V-1000B )


Bahan:
a. Mixer Frame w/ Module (V-1000B ) Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

65 1 Unit Pagging Microphone PM 660D/1 ( w/ RU-2001 )


Bahan:
a. Pagging Microphone PM 660D/1 ( w/ RU-2001 ) Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

66 1 Unit Radio Tunner AM/FM ( V-1034B )


Bahan:
a. Radio Tunner AM/FM ( V-1034B ) Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

67 1 Unit Speaker Selector ( SS-021B )


Bahan:
a. Speaker Selector ( SS-021B ) Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

68 1 Unit Ceiling Speaker ( ZS-646R )


Bahan:
a. Ceiling Speaker ( ZS-646R ) Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju


69 1 Unit Coulumn speaker 20 watt
Bahan:
a. Coulumn speaker 20 watt Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

70 1 Unit Horn Speaker


Bahan:
a. Horn Speaker Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

71 1 Unit Attenuator
Bahan:
a. Attenuator Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju


72 1 Unit NVR Samsung SRN-1670D
Bahan:
a. NVR Samsung SRN-1670D Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

73 1 Unit VIEWSONIC Multi-touch Monitor LED  24"


Bahan:
a. VIEWSONIC Multi-touch Monitor LED  24" Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

74 1 Unit Switch D-LINK DGS-1210-20 16 port


Bahan:
a. Switch D-LINK DGS-1210-20 16 port Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

75 1 Unit Switch Hub Managed TPLink 8 Port TL SG3210


Bahan:
a. Switch Hub Managed TPLink 8 Port TL SG3210 Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

76 1 Unit D-LINK Switch Unmanaged [DGS-1005A] 5 port


Bahan:
a. D-LINK Switch Unmanaged [DGS-1005A] 5 port Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

77 1 Unit PC Computer + Printer


Bahan:
a. PC Computer + Printer Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju


78 1 Unit Fixed Dome Camera
Bahan:
a. Fixed Dome Camera Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

79 1 Unit Camera With Rotation


Bahan:
a. Camera With Rotation Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

80 1 Unit Rack CCTV


Bahan:
a. Rack CCTV Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

81 1 Unit HP ProLiant DL320eG8-421


Bahan:
a. HP ProLiant DL320eG8-421 Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

82 1 Unit Path Panel 2x48 port


Bahan:
a. Path Panel 2x48 port Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

83 1 Unit Monitor
Bahan:
a. Monitor Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

84 1 Unit Printer
Bahan:
a. Printer Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

85 1 Unit Socket Data ( RG-45 )


Bahan:
a. Socket Data ( RG-45 ) Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

86 1 Unit Kabel UTP- Cat 5e - 0,6 mm2


Bahan:
a. Kabel UTP- Cat 5e - 0,6 mm2 Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju
72 1 Unit Kabel NYMHY 2x1,5 mm2
Bahan:
a. Kabel NYMHY 2x1,5 mm2 Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

73 1 Unit Kabel NYMHY 3x1,5 mm2


Bahan:
a. Kabel NYMHY 3x1,5 mm2 Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

74 1 Unit Kabel NYMHY 3( 3 x2,5 mm2 )


Bahan:
a. Kabel NYMHY 3( 3 x2,5 mm2 ) Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju


75 1 Unit Terminal Box / TB
Bahan:
a. Terminal Box / TB Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

76 1 Unit MDF / CTB


Bahan:
a. MDF / CTB Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

77 1 Unit Cabinet Rack


Bahan:
a. Cabinet Rack Unit
b. Alat Bantu lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

78 1 Meter Pemasangan kabel NYA 1x1.5 mm² ( Tidak Ditanam )


Bahan:
a. NYA 1x1.5 mm² meter
b. Kabel ties buah
c. Isolasi roll
d. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju


79 1 Meter Pemasangan kabel NYM 4x2.5 mm² ( Tidak Ditanam )
Bahan:
a. NYM 4x2.5 mm² meter
b. Kabel ties buah
c. Isolasi roll
d. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju


80 1 Meter Pemasangan kabel NYY 1x50 mm² ( Tidak Ditanam )
Bahan:
a. NYY 1x50 mm² meter
b. Kabel ties buah
c. Isolasi roll
d. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju


81 1 Meter Pemasangan kabel NYY 1x150 mm² ( Tidak Ditanam )
Bahan:
a. NYY 1x150 mm² meter
b. Kabel ties buah
c. Isolasi roll
d. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju


82 1 Meter Pemasangan kabel NYY 1x185 mm² ( Tidak Ditanam )
Bahan:
a. NYY 1x185 mm² meter
b. Kabel ties buah
c. Isolasi roll
d. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju


83 1 Meter Pemasangan kabel NYY 3x2.5 mm² ( Tidak Ditanam )
Bahan:
a. NYY 3x2.5 mm² meter
b. Kabel ties buah
c. Isolasi roll
d. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju


84 1 Meter Pemasangan kabel NYY 3x4 mm² ( Tidak Ditanam )
Bahan:
a. NYY 3x4 mm² meter
b. Kabel ties buah
c. Isolasi roll
d. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju


85 1 Meter Pemasangan kabel NYY 4x4 mm² ( Tidak Ditanam )
Bahan:
a. NYY 4x4 mm² meter
b. Kabel ties buah
c. Isolasi roll
d. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

86 1 Meter Pemasangan kabel NYY 4x6 mm² ( Tidak Ditanam )


Bahan:
a. NYY 4x6 mm² meter
b. Kabel ties buah
c. Isolasi roll
d. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

87 1 Meter Pemasangan kabel NYY 4x10 mm² ( Tidak Ditanam )


Bahan:
a. NYY 4x10 mm² meter
b. Kabel ties buah
c. Isolasi roll
d. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

88 1 Meter Pemasangan kabel NYY 4x16 mm² ( Tidak Ditanam )


Bahan:
a. NYY 4x16 mm² meter
b. Kabel ties buah
c. Isolasi roll
d. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju


89 1 Meter Pemasangan kabel NYY 4x35 mm² ( Tidak Ditanam )
Bahan:
a. NYY 4x35 mm² meter
b. Kabel ties buah
c. Isolasi roll
d. Sewa alat 5% dari harga bahan lot
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

90 1 Meter Pemasangan kabel NYY 4x50 mm² ( Tidak Ditanam )


Bahan:
a. NYY 4x50 mm² meter
b. Kabel ties buah
c. Isolasi roll
d. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

91 1 Meter Pemasangan kabel NYY 4x70 mm² ( Tidak Ditanam )


Bahan:
a. NYY 4x70 mm² meter
b. Kabel ties buah
c. Isolasi roll
d. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

92 1 Meter Pemasangan kabel NYY 4x95 mm² ( Tidak Ditanam )


Bahan:
a. NYY 4x95 mm² meter
b. Kabel ties buah
c. Isolasi roll
d. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju


93 1 Meter Pemasangan kabel NYY 4x120 mm² ( Tidak Ditanam )
Bahan:
a. NYY 4x120 mm² meter
b. Kabel ties buah
c. Isolasi roll
d. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju


94 1 Meter Pemasangan kabel NYFGby 2x1.5 mm² ( Tidak Ditanam )
Bahan:
a. NYFGby 2x1.5 mm² meter
b. Kabel ties buah
c. Isolasi roll
d. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

95 1 Meter Pemasangan kabel NYFGby 2x1.5 mm² ( Tidak Ditanam )


Bahan:
a. NYFGby 2x1.5 mm² meter
b. Kabel ties buah
c. Isolasi roll
d. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju


96 1 Meter Pemasangan kabel N2XSEFGbY 3 x 70 mm² ( Tidak Ditanam )
Bahan:
a. N2XSEFGbY 3 x 70 mm² meter
b. Kabel ties buah
c. Isolasi roll
d. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

97 1 Meter Pemasangan kabel N2XSEFGbY 3 x 95 mm² ( Tidak Ditanam )


Bahan:
a. N2XSEFGbY 3 x 95 mm² meter
b. Kabel ties buah
c. Isolasi roll
d. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

98 1 Meter Pemasangan kabel N2XSY 3 x 50 mm² ( Tidak Ditanam )


Bahan:
a. N2XSY 3 x 50 mm² meter
b. Kabel ties buah
c. Isolasi roll
d. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

99 1 Meter Pemasangan kabel FRC 4 x 6 mm² ( Tidak Ditanam )


Bahan:
a. FRC 4 x 6 mm² meter
b. Kabel ties buah
c. Isolasi roll
d. Sewa alat 5% dari harga bahan lot
Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

100 1 Meter Pemasangan kabel FRC 4 x 10 mm² ( Tidak Ditanam )


Bahan:
a. FRC 4 x 10 mm² meter
b. Kabel ties buah
c. Isolasi roll
d. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

101 1 Meter Pemasangan kabel FRC 4 x 16 mm² ( Tidak Ditanam )


Bahan:
a. FRC 4 x 16 mm² meter
b. Kabel ties buah
c. Isolasi roll
d. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

102 1 Meter Pemasangan kabel N2XSEBY 3x185 mm² ( Ditanam )


Bahan:
a. N2XSEBY 3x185 mm² meter
b. Kabel ties buah
c. Isolasi roll
d. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju

103 1 Meter Pemasangan kabel N2XSY 1x50 mm² ( Tidak Ditanam )


Bahan:
a. N2XSY 1x50 mm² meter
b. Kabel ties buah
c. Isolasi roll
d. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju


104 1 Meter Pemasangan kabel N2XSY 1x185mm² ( Tidak Ditanam )
Bahan:
a. N2XSY 1x185mm² meter
b. Kabel ties buah
c. Isolasi roll
d. Sewa alat 5% dari harga bahan lot

Tenaga Kerja:
a. Pekerja oh
b. Tukang oh
c. Kepala Tukang oh
d. Mandor oh

Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Ju


EKERJAAN ELEKTRIKAL

Koefesien Harga Satuan (Rp) Jumlah Harga Satuan (Rp)


4 5 6=(4*5)

12.000 15,600.00 Rp 187,200


11.000 4,800.00 Rp 52,800
5.500 1,800.00 Rp 9,900
5.500 600.00 Rp 3,300
1.000 7,200.00 Rp 7,200
0.333 7,200.00 Rp 2,400
1.000 13,140.00 Rp 13,140
Jumlah harga bahan Rp 275,940

0.333 80,000.00 Rp 26,667


0.333 100,000.00 Rp 33,333
0.167 120,000.00 Rp 20,000
0.033 125,000.00 Rp 4,167
Jumlah harga upah tenaga kerja Rp 84,167
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 360,107

14.000 15,600.00 Rp 218,400


13.000 4,800.00 Rp 62,400
6.500 1,800.00 Rp 11,700
6.500 600.00 Rp 3,900
1.000 7,200.00 Rp 7,200
0.333 7,200.00 Rp 2,400
1.000 15,300.00 Rp 15,300
Jumlah harga bahan Rp 321,300

0.333 80,000.00 Rp 26,667


0.333 100,000.00 Rp 33,333
0.167 120,000.00 Rp 20,000
0.033 125,000.00 Rp 4,167
Jumlah harga upah tenaga kerja Rp 84,167
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 405,467

28.000 2,640.00 Rp 73,920


13.500 6,000.00 Rp 81,000
6.750 2,400.00 Rp 16,200
6.750 600.00 Rp 4,050
1.000 7,200.00 Rp 7,200
0.333 7,200.00 Rp 2,400
1.000 9,238.50 Rp 9,239
Jumlah harga bahan Rp 194,009

0.417 80,000.00 Rp 33,333


0.417 100,000.00 Rp 41,667
0.208 120,000.00 Rp 25,000
0.042 125,000.00 Rp 5,208
Jumlah harga upah tenaga kerja Rp 105,208
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 299,217

14.000 9,600.00 Rp 134,400


13.000 6,000.00 Rp 78,000
6.500 2,400.00 Rp 15,600
6.500 600.00 Rp 3,900
1.000 7,200.00 Rp 7,200
0.333 7,200.00 Rp 2,400
1.000 12,075.00 Rp 12,075
Jumlah harga bahan Rp 253,575

0.417 80,000.00 Rp 33,333


0.417 100,000.00 Rp 41,667
0.208 120,000.00 Rp 25,000
0.042 125,000.00 Rp 5,208
Jumlah harga upah tenaga kerja Rp 105,208
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 358,783

14.000 18,720.00 Rp 262,080


13.000 6,000.00 Rp 78,000
6.500 2,400.00 Rp 15,600
6.500 600.00 Rp 3,900
1.000 7,200.00 Rp 7,200
0.333 7,200.00 Rp 2,400
1.000 18,459.00 Rp 18,459
Jumlah harga bahan Rp 387,639

0.417 80,000.00 Rp 33,333


0.417 100,000.00 Rp 41,667
0.208 120,000.00 Rp 25,000
0.042 125,000.00 Rp 5,208
Jumlah harga upah tenaga kerja Rp 105,208
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 492,847
14.000 31,200.00 Rp 436,800
13.000 6,000.00 Rp 78,000
6.500 2,400.00 Rp 15,600
6.500 600.00 Rp 3,900
1.000 7,200.00 Rp 7,200
0.333 7,200.00 Rp 2,400
1.000 27,195.00 Rp 27,195
Jumlah harga bahan Rp 571,095

0.417 80,000.00 Rp 33,333


0.417 100,000.00 Rp 41,667
0.208 120,000.00 Rp 25,000
0.042 125,000.00 Rp 5,208
Jumlah harga upah tenaga kerja Rp 105,208
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 676,303

1.000 2,400,000.00 Rp 2,400,000


1.000 120,000.00 Rp 120,000
Jumlah harga bahan Rp 2,520,000

0.103 80,000.00 Rp 8,222


0.103 100,000.00 Rp 10,278
0.051 120,000.00 Rp 6,167
0.005 125,000.00 Rp 642
Jumlah harga upah tenaga kerja Rp 25,309
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 2,545,309

1.000 1,020,000.00 Rp 1,020,000


1.000 51,000.00 Rp 51,000
Jumlah harga bahan Rp 1,071,000

0.103 80,000.00 Rp 8,222


0.103 100,000.00 Rp 10,278
0.051 120,000.00 Rp 6,167
0.005 125,000.00 Rp 642
Jumlah harga upah tenaga kerja Rp 25,309
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 1,096,309

1.000 57,600,000.00 Rp 57,600,000


1.000 2,880,000.00 Rp 2,880,000
Jumlah harga bahan Rp 60,480,000
1.028 80,000.00 Rp 82,222
1.028 100,000.00 Rp 102,778
0.514 120,000.00 Rp 61,667
0.051 125,000.00 Rp 6,424
Jumlah harga upah tenaga kerja Rp 253,090
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 60,733,090

1.000 Rp 1,560,000 Rp 1,560,000


1.000 Rp 78,000 Rp 78,000
Jumlah harga bahan Rp 1,638,000

0.103 Rp 80,000 Rp 8,222


0.103 Rp 100,000 Rp 10,278
0.051 Rp 120,000 Rp 6,167
0.005 Rp 125,000 Rp 642
Jumlah harga upah tenaga kerja Rp 25,309
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 1,663,309

1.000 Rp 1,500,000 Rp 1,500,000


1.000 Rp 75,000 Rp 75,000
Jumlah harga bahan Rp 1,575,000

0.103 Rp 80,000 Rp 8,222


0.103 Rp 100,000 Rp 10,278
0.051 Rp 120,000 Rp 6,167
0.005 Rp 125,000 Rp 642
Jumlah harga upah tenaga kerja Rp 25,309
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 1,600,309

1.000 Rp 1,320,000 Rp 1,320,000


1.000 Rp 66,000 Rp 66,000
Jumlah harga bahan Rp 1,386,000

0.103 Rp 80,000 Rp 8,222


0.103 Rp 100,000 Rp 10,278
0.051 Rp 120,000 Rp 6,167
0.005 Rp 125,000 Rp 642
Jumlah harga upah tenaga kerja Rp 25,309
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 1,411,309

1.000 Rp 1,380,000 Rp 1,380,000


1.000 Rp 69,000 Rp 69,000
Jumlah harga bahan Rp 1,449,000

0.083 Rp 80,000 Rp 6,667


0.083 Rp 100,000 Rp 8,333
0.042 Rp 120,000 Rp 5,000
0.004 Rp 125,000 Rp 521
Jumlah harga upah tenaga kerja Rp 20,521
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 1,469,521

1.000 Rp 900,000 Rp 900,000


1.000 Rp 45,000 Rp 45,000
Jumlah harga bahan Rp 945,000

0.083 Rp 80,000 Rp 6,667


0.083 Rp 100,000 Rp 8,333
0.042 Rp 120,000 Rp 5,000
0.004 Rp 125,000 Rp 521
Jumlah harga upah tenaga kerja Rp 20,521
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 965,521

1.000 Rp 42,000 Rp 42,000


1.000 Rp 7,200 Rp 7,200
2.000 Rp 600 Rp 1,200
1.000 Rp 2,520 Rp 2,520
Jumlah harga bahan Rp 52,920

0.083 Rp 80,000 Rp 6,667


0.083 Rp 100,000 Rp 8,333
0.042 Rp 120,000 Rp 5,000
0.008 Rp 125,000 Rp 1,042
Jumlah harga upah tenaga kerja Rp 21,042
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 73,962

1.000 Rp 48,000 Rp 48,000


1.000 Rp 7,200 Rp 7,200
2.000 Rp 600 Rp 1,200
1.000 Rp 2,820 Rp 2,820
Jumlah harga bahan Rp 59,220

0.083 Rp 80,000 Rp 6,667


0.083 Rp 100,000 Rp 8,333
0.042 Rp 120,000 Rp 5,000
0.008 Rp 125,000 Rp 1,042
Jumlah harga upah tenaga kerja Rp 21,042
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 80,262

1.000 Rp 54,000 Rp 54,000


1.000 Rp 7,200 Rp 7,200
2.000 Rp 600 Rp 1,200
1.000 Rp 3,120 Rp 3,120
Jumlah harga bahan Rp 65,520

0.083 Rp 80,000 Rp 6,667


0.083 Rp 100,000 Rp 8,333
0.042 Rp 120,000 Rp 5,000
0.008 Rp 125,000 Rp 1,042
Jumlah harga upah tenaga kerja Rp 21,042
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 86,562

1.000 Rp 75,600 Rp 75,600


1.000 Rp 7,200 Rp 7,200
2.000 Rp 600 Rp 1,200
1.000 Rp 4,200 Rp 4,200
Jumlah harga bahan Rp 88,200

0.083 Rp 80,000 Rp 6,667


0.083 Rp 100,000 Rp 8,333
0.042 Rp 120,000 Rp 5,000
0.008 Rp 125,000 Rp 1,042
Jumlah harga upah tenaga kerja Rp 21,042
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 109,242

1.000 Rp 96,000 Rp 96,000


2.000 Rp 7,200 Rp 14,400
2.000 Rp 600 Rp 1,200
1.000 Rp 5,580 Rp 5,580
Jumlah harga bahan Rp 117,180

0.083 Rp 80,000 Rp 6,667


0.083 Rp 100,000 Rp 8,333
0.042 Rp 120,000 Rp 5,000
0.008 Rp 125,000 Rp 1,042
Jumlah harga upah tenaga kerja Rp 21,042
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 138,222
1.000 Rp 50,400 Rp 50,400
1.000 Rp 7,200 Rp 7,200
1.000 Rp 600 Rp 600
1.000 Rp 2,910 Rp 2,910
Jumlah harga bahan Rp 61,110

0.083 Rp 80,000 Rp 6,667


0.083 Rp 100,000 Rp 8,333
0.042 Rp 120,000 Rp 5,000
0.008 Rp 125,000 Rp 1,042
Jumlah harga upah tenaga kerja Rp 21,042
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 82,152

1.000 Rp 390,000 Rp 390,000


1.000 Rp 7,200 Rp 7,200
1.000 Rp 600 Rp 600
1.000 Rp 19,890 Rp 19,890
Jumlah harga bahan Rp 417,690

0.083 Rp 80,000 Rp 6,667


0.083 Rp 100,000 Rp 8,333
0.042 Rp 120,000 Rp 5,000
0.008 Rp 125,000 Rp 1,042
Jumlah harga upah tenaga kerja Rp 21,042
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 438,732

1.000 Rp 390,000 Rp 390,000


1.000 Rp 7,200 Rp 7,200
1.000 Rp 600 Rp 600
1.000 Rp 19,890 Rp 19,890
Jumlah harga bahan Rp 417,690

0.083 Rp 80,000 Rp 6,667


0.083 Rp 100,000 Rp 8,333
0.008 Rp 125,000 Rp 1,042
Jumlah harga upah tenaga kerja Rp 16,042
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 433,732

1.000 Rp 266,400 Rp 266,400


0.500 Rp 2,000 Rp 1,000
0.125 Rp 10,000 Rp 1,250
0.500 Rp 12,000 Rp 6,000
1.000 Rp 500 Rp 500
1.000 Rp 13,433 Rp 13,433
Jumlah harga bahan Rp 288,583

0.083 Rp 80,000 Rp 6,667


0.083 Rp 100,000 Rp 8,333
0.004 Rp 125,000 Rp 521
Jumlah harga upah tenaga kerja Rp 15,521
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 304,103

1.000 Rp 302,400 Rp 302,400


0.500 Rp 2,000 Rp 1,000
0.125 Rp 10,000 Rp 1,250
0.500 Rp 12,000 Rp 6,000
1.000 Rp 500 Rp 500
1.000 Rp 15,558 Rp 15,558
Jumlah harga bahan Rp 326,708

0.083 Rp 80,000 Rp 6,667


0.083 Rp 100,000 Rp 8,333
0.042 Rp 120,000 Rp 5,000
0.004 Rp 125,000 Rp 521
Jumlah harga upah tenaga kerja Rp 20,521
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 347,228

1.000 Rp 370,080 Rp 370,080


0.500 Rp 2,000 Rp 1,000
0.125 Rp 10,000 Rp 1,250
0.500 Rp 12,000 Rp 6,000
1.000 Rp 500 Rp 500
1.000 Rp 18,942 Rp 18,942
Jumlah harga bahan Rp 397,772

0.083 Rp 80,000 Rp 6,667


0.083 Rp 100,000 Rp 8,333
0.042 Rp 120,000 Rp 5,000
0.004 Rp 125,000 Rp 521
Jumlah harga upah tenaga kerja Rp 20,521
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 418,292

1.000 Rp 388,800 Rp 388,800


0.500 Rp 2,000 Rp 1,000
0.125 Rp 10,000 Rp 1,250
0.500 Rp 12,000 Rp 6,000
1.000 Rp 500 Rp 500
1.000 Rp 19,878 Rp 19,878
Jumlah harga bahan Rp 417,428

0.083 Rp 80,000 Rp 6,667


0.083 Rp 100,000 Rp 8,333
0.042 Rp 120,000 Rp 5,000
0.004 Rp 125,000 Rp 521
Jumlah harga upah tenaga kerja Rp 20,521
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 437,948

1.000 Rp 141,120 Rp 141,120


0.500 Rp 2,000 Rp 1,000
0.125 Rp 10,000 Rp 1,250
0.500 Rp 12,000 Rp 6,000
1.000 Rp 500 Rp 500
1.000 Rp 7,056 Rp 7,056
1.000 Rp 7,846 Rp 7,846
Jumlah harga bahan Rp 164,772

0.083 Rp 80,000 Rp 6,667


0.083 Rp 100,000 Rp 8,333
0.042 Rp 120,000 Rp 5,000
0.004 Rp 125,000 Rp 521
Jumlah harga upah tenaga kerja Rp 20,521
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 185,293

1.000 Rp 201,600 Rp 201,600


0.500 Rp 2,000 Rp 1,000
0.125 Rp 10,000 Rp 1,250
0.500 Rp 12,000 Rp 6,000
1.000 Rp 500 Rp 500
1.000 Rp 10,080 Rp 10,080
1.000 Rp 11,022 Rp 11,022
Jumlah harga bahan Rp 231,452

0.083 Rp 80,000 Rp 6,667


0.083 Rp 100,000 Rp 8,333
0.042 Rp 120,000 Rp 5,000
0.004 Rp 125,000 Rp 521
Jumlah harga upah tenaga kerja Rp 20,521
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 251,972
1.000 Rp 220,320 Rp 220,320
0.500 Rp 2,000 Rp 1,000
0.125 Rp 10,000 Rp 1,250
0.500 Rp 12,000 Rp 6,000
1.000 Rp 500 Rp 500
1.000 Rp 11,016 Rp 11,016
1.000 Rp 12,004 Rp 12,004
Jumlah harga bahan Rp 252,090

0.083 Rp 80,000 Rp 6,667


0.083 Rp 100,000 Rp 8,333
0.042 Rp 120,000 Rp 5,000
0.004 Rp 125,000 Rp 521
Jumlah harga upah tenaga kerja Rp 20,521
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 272,611

1.000 Rp 384,480 Rp 384,480


0.500 Rp 2,000 Rp 1,000
0.125 Rp 10,000 Rp 1,250
0.500 Rp 12,000 Rp 6,000
1.000 Rp 500 Rp 500
1.000 Rp 19,224 Rp 19,224
1.000 Rp 20,623 Rp 20,623
Jumlah harga bahan Rp 433,077

0.083 Rp 80,000 Rp 6,667


0.083 Rp 100,000 Rp 8,333
0.042 Rp 120,000 Rp 5,000
0.004 Rp 125,000 Rp 521
Jumlah harga upah tenaga kerja Rp 20,521
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 453,598

1.000 Rp 139,680 Rp 139,680


0.500 Rp 2,000 Rp 1,000
0.125 Rp 10,000 Rp 1,250
0.500 Rp 12,000 Rp 6,000
1.000 Rp 500 Rp 500
1.000 Rp 6,984 Rp 6,984
1.000 Rp 7,771 Rp 7,771
Jumlah harga bahan Rp 163,185

0.083 Rp 80,000 Rp 6,667


0.083 Rp 100,000 Rp 8,333
0.042 Rp 120,000 Rp 5,000
0.004 Rp 125,000 Rp 521
Jumlah harga upah tenaga kerja Rp 20,521
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 183,706

1.000 Rp 159,840 Rp 159,840


0.500 Rp 2,000 Rp 1,000
0.125 Rp 10,000 Rp 1,250
0.500 Rp 12,000 Rp 6,000
1.000 Rp 500 Rp 500
1.000 Rp 7,992 Rp 7,992
1.000 Rp 8,829 Rp 8,829
Jumlah harga bahan Rp 185,411

0.083 Rp 80,000 Rp 6,667


0.083 Rp 100,000 Rp 8,333
0.042 Rp 120,000 Rp 5,000
0.004 Rp 125,000 Rp 521
Jumlah harga upah tenaga kerja Rp 20,521
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 205,932

1.000 Rp 200,160 Rp 200,160


0.500 Rp 2,000 Rp 1,000
0.125 Rp 10,000 Rp 1,250
0.500 Rp 12,000 Rp 6,000
1.000 Rp 500 Rp 500
1.000 Rp 10,008 Rp 10,008
1.000 Rp 10,946 Rp 10,946
Jumlah harga bahan Rp 229,864

0.083 Rp 80,000 Rp 6,667


0.083 Rp 100,000 Rp 8,333
0.042 Rp 120,000 Rp 5,000
0.004 Rp 125,000 Rp 521
Jumlah harga upah tenaga kerja Rp 20,521
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 250,385

1.000 Rp 357,120 Rp 357,120


0.500 Rp 2,000 Rp 1,000
0.125 Rp 10,000 Rp 1,250
0.500 Rp 12,000 Rp 6,000
1.000 Rp 500 Rp 500
1.000 Rp 17,856 Rp 17,856
1.000 Rp 19,186 Rp 19,186
Jumlah harga bahan Rp 402,912
0.083 Rp 80,000 Rp 6,667
0.083 Rp 100,000 Rp 8,333
0.042 Rp 120,000 Rp 5,000
0.004 Rp 125,000 Rp 521
Jumlah harga upah tenaga kerja Rp 20,521
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 423,433

1,110.000 Rp 850,000 Rp 943,500,000


110.000 Rp 275,000 Rp 30,250,000
1.000 Rp 46,666,700 Rp 46,666,700
Jumlah harga bahan Rp 1,020,416,700

4.000 Rp 80,000 Rp 320,000


4.000 Rp 100,000 Rp 400,000
2.000 Rp 120,000 Rp 240,000
0.200 Rp 125,000 Rp 25,000
Jumlah harga upah tenaga kerja Rp 985,000
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 1,021,401,700

1.000 Rp 143,640,000 Rp 143,640,000


1.000 Rp 143,640,000 Rp 143,640,000
1.000 Rp 143,640,000 Rp 143,640,000
Jumlah harga bahan Rp 430,920,000

4.000 Rp 80,000 Rp 320,000


4.000 Rp 100,000 Rp 400,000
2.000 Rp 120,000 Rp 240,000
0.200 Rp 125,000 Rp 25,000
Jumlah harga upah tenaga kerja Rp 985,000
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 431,905,000

1.000 Rp 480,000,000 Rp 480,000,000


1.000 Rp 2,000,000 Rp 2,000,000
Jumlah harga bahan Rp 482,000,000

4.000 Rp 80,000 Rp 320,000


4.000 Rp 100,000 Rp 400,000
2.000 Rp 120,000 Rp 240,000
1.000 Rp 125,000 Rp 125,000
Jumlah harga upah tenaga kerja Rp 1,085,000
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 483,085,000

1.000 Rp 403,200,000 Rp 403,200,000


1.000 Rp 2,000,000 Rp 2,000,000
Jumlah harga bahan Rp 405,200,000

4.000 Rp 80,000 Rp 320,000


4.000 Rp 100,000 Rp 400,000
2.000 Rp 120,000 Rp 240,000
0.200 Rp 125,000 Rp 25,000
Jumlah harga upah tenaga kerja Rp 985,000
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 406,185,000

1.000 Rp 900,000,000 Rp 900,000,000


1.000 Rp 159,000,000 Rp 159,000,000
1.000 Rp 2,000,000 Rp 2,000,000
Jumlah harga bahan Rp 1,061,000,000

4.000 Rp 80,000 Rp 320,000


4.000 Rp 100,000 Rp 400,000
2.000 Rp 120,000 Rp 240,000
0.200 Rp 125,000 Rp 25,000
Jumlah harga upah tenaga kerja Rp 985,000
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 1,061,985,000

1.000 Rp 96,000,000 Rp 96,000,000


1.000 Rp 960,000 Rp 960,000
Jumlah harga bahan Rp 96,960,000

13.000 Rp 80,000 Rp 1,040,000


13.000 Rp 100,000 Rp 1,300,000
6.500 Rp 120,000 Rp 780,000
0.650 Rp 125,000 Rp 81,250
Jumlah harga upah tenaga kerja Rp 3,201,250
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 100,161,250

1.000 Rp 4,200,000 Rp 4,200,000


1.000 Rp 210,000 Rp 210,000
Jumlah harga bahan Rp 4,410,000

0.667 Rp 80,000 Rp 53,333


0.667 Rp 100,000 Rp 66,667
0.333 Rp 120,000 Rp 40,000
0.033 Rp 125,000 Rp 4,167
Jumlah harga upah tenaga kerja Rp 164,167
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 4,574,167
1.000 Rp 2,040,000 Rp 2,040,000
1.000 Rp 102,000 Rp 102,000
Jumlah harga bahan Rp 2,142,000

0.667 Rp 80,000 Rp 53,333


0.667 Rp 100,000 Rp 66,667
0.333 Rp 120,000 Rp 40,000
0.033 Rp 125,000 Rp 4,167
Jumlah harga upah tenaga kerja Rp 164,167
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 2,306,167

1.000 Rp 864,000 Rp 864,000


1.000 Rp 43,200 Rp 43,200
Jumlah harga bahan Rp 907,200

0.097 Rp 80,000 Rp 7,778


0.097 Rp 100,000 Rp 9,722
0.049 Rp 120,000 Rp 5,833
0.005 Rp 125,000 Rp 608
Jumlah harga upah tenaga kerja Rp 23,941
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 931,141

1.000 Rp 600,000 Rp 600,000


1.000 Rp 30,000 Rp 30,000
Jumlah harga bahan Rp 630,000

0.097 Rp 80,000 Rp 7,778


0.097 Rp 100,000 Rp 9,722
0.049 Rp 120,000 Rp 5,833
0.005 Rp 125,000 Rp 608
Jumlah harga upah tenaga kerja Rp 23,941
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 653,941

1.000 Rp 240,000 Rp 240,000


1.000 Rp 12,000 Rp 12,000
Jumlah harga bahan Rp 252,000

0.097 Rp 80,000 Rp 7,778


0.097 Rp 100,000 Rp 9,722
0.049 Rp 120,000 Rp 5,833
0.005 Rp 125,000 Rp 608
Jumlah harga upah tenaga kerja Rp 23,941
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 275,941

1.000 Rp 432,000 Rp 432,000


1.000 Rp 21,600 Rp 21,600
Jumlah harga bahan Rp 453,600

0.097 Rp 80,000 Rp 7,778


0.097 Rp 100,000 Rp 9,722
0.049 Rp 120,000 Rp 5,833
0.005 Rp 125,000 Rp 608
Jumlah harga upah tenaga kerja Rp 23,941
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 477,541

1.000 Rp 276,000 Rp 276,000


1.000 Rp 13,800 Rp 13,800
Jumlah harga bahan Rp 289,800

0.097 Rp 80,000 Rp 7,778


0.097 Rp 100,000 Rp 9,722
0.049 Rp 120,000 Rp 5,833
0.005 Rp 125,000 Rp 608
Jumlah harga upah tenaga kerja Rp 23,941
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 313,741

1.000 Rp 37,200 Rp 37,200


1.000 Rp 1,860 Rp 1,860
Jumlah harga bahan Rp 39,060

0.042 Rp 80,000 Rp 3,333


0.042 Rp 100,000 Rp 4,167
0.021 Rp 120,000 Rp 2,500
0.002 Rp 125,000 Rp 260
Jumlah harga upah tenaga kerja Rp 10,260
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 49,320

1.000 Rp 240,000 Rp 240,000


1.000 Rp 12,000 Rp 12,000
Jumlah harga bahan Rp 252,000
0.042 Rp 80,000 Rp 3,333
0.042 Rp 100,000 Rp 4,167
0.021 Rp 120,000 Rp 2,500
0.002 Rp 125,000 Rp 260
Jumlah harga upah tenaga kerja Rp 10,260
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 262,260

1.000 Rp 588,000 Rp 588,000


1.000 Rp 11,760 Rp 11,760
Jumlah harga bahan Rp 599,760

0.097 Rp 80,000 Rp 7,778


0.097 Rp 100,000 Rp 9,722
0.049 Rp 120,000 Rp 5,833
0.005 Rp 125,000 Rp 608
Jumlah harga upah tenaga kerja Rp 23,941
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 623,701

1.000 Rp 4,200,000 Rp 4,200,000


1.000 Rp 84,000 Rp 84,000
Jumlah harga bahan Rp 4,284,000

0.667 Rp 80,000 Rp 53,333


0.667 Rp 100,000 Rp 66,667
0.333 Rp 120,000 Rp 40,000
0.033 Rp 125,000 Rp 4,167
Jumlah harga upah tenaga kerja Rp 164,167
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 4,448,167

1.000 Rp 105,840 Rp 105,840


1.000 Rp 2,117 Rp 2,117
Jumlah harga bahan Rp 107,957

0.042 Rp 80,000 Rp 3,333


0.042 Rp 100,000 Rp 4,167
0.021 Rp 120,000 Rp 2,500
0.002 Rp 125,000 Rp 260
Jumlah harga upah tenaga kerja Rp 10,260
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 118,217

1.000 Rp 546,000 Rp 546,000


1.000 Rp 10,920 Rp 10,920
Jumlah harga bahan Rp 556,920

0.667 Rp 80,000 Rp 53,333


0.667 Rp 100,000 Rp 66,667
0.333 Rp 120,000 Rp 40,000
0.033 Rp 125,000 Rp 4,167
Jumlah harga upah tenaga kerja Rp 164,167
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 721,087

1.000 Rp 823,200 Rp 823,200


1.000 Rp 16,464 Rp 16,464
Jumlah harga bahan Rp 839,664

0.667 Rp 80,000 Rp 53,333


0.667 Rp 100,000 Rp 66,667
0.333 Rp 120,000 Rp 40,000
0.033 Rp 125,000 Rp 4,167
Jumlah harga upah tenaga kerja Rp 164,167
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 1,003,831

1.000 Rp 924,000 Rp 924,000


1.000 Rp 18,480 Rp 18,480
Jumlah harga bahan Rp 942,480

0.667 Rp 80,000 Rp 53,333


0.667 Rp 100,000 Rp 66,667
0.333 Rp 120,000 Rp 40,000
0.033 Rp 125,000 Rp 4,167
Jumlah harga upah tenaga kerja Rp 164,167
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 1,106,647

1.000 Rp 31,920 Rp 31,920


1.000 Rp 638 Rp 638
Jumlah harga bahan Rp 32,558

0.097 Rp 80,000 Rp 7,778


0.097 Rp 100,000 Rp 9,722
0.049 Rp 120,000 Rp 5,833
0.005 Rp 125,000 Rp 608
Jumlah harga upah tenaga kerja Rp 23,941
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 56,499
1.000 Rp 63,840 Rp 63,840
1.000 Rp 1,277 Rp 1,277
Jumlah harga bahan Rp 65,117

0.097 Rp 80,000 Rp 7,778


0.097 Rp 100,000 Rp 9,722
0.049 Rp 120,000 Rp 5,833
0.005 Rp 125,000 Rp 608
Jumlah harga upah tenaga kerja Rp 23,941
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 89,058

1.000 Rp 95,760 Rp 95,760


1.000 Rp 1,915 Rp 1,915
Jumlah harga bahan Rp 97,675

0.097 Rp 80,000 Rp 7,778


0.097 Rp 100,000 Rp 9,722
0.049 Rp 120,000 Rp 5,833
0.005 Rp 125,000 Rp 608
Jumlah harga upah tenaga kerja Rp 23,941
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 121,616

1.000 Rp 638,400 Rp 638,400


1.000 Rp 12,768 Rp 12,768
Jumlah harga bahan Rp 651,168

0.097 Rp 80,000 Rp 7,778


0.097 Rp 100,000 Rp 9,722
0.049 Rp 120,000 Rp 5,833
0.005 Rp 125,000 Rp 608
Jumlah harga upah tenaga kerja Rp 23,941
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 675,109

1.000 Rp 9,943,080 Rp 9,943,080


1.000 Rp 198,862 Rp 198,862
Jumlah harga bahan Rp 10,141,942

0.097 Rp 80,000 Rp 7,778


0.097 Rp 100,000 Rp 9,722
0.049 Rp 120,000 Rp 5,833
0.005 Rp 125,000 Rp 608
Jumlah harga upah tenaga kerja Rp 23,941
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 10,165,883

1.000 Rp 5,187,000 Rp 5,187,000


1.000 Rp 103,740 Rp 103,740
Jumlah harga bahan Rp 5,290,740

0.097 Rp 80,000 Rp 7,778


0.097 Rp 100,000 Rp 9,722
0.049 Rp 120,000 Rp 5,833
0.005 Rp 125,000 Rp 608
Jumlah harga upah tenaga kerja Rp 23,941
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 5,314,681

1.000 Rp 5,346,600 Rp 5,346,600


1.000 Rp 106,932 Rp 106,932
Jumlah harga bahan Rp 5,453,532

0.097 Rp 80,000 Rp 7,778


0.097 Rp 100,000 Rp 9,722
0.049 Rp 120,000 Rp 5,833
0.005 Rp 125,000 Rp 608
Jumlah harga upah tenaga kerja Rp 23,941
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 5,477,473

1.000 Rp 2,741,280 Rp 2,741,280


1.000 Rp 54,826 Rp 54,826
Jumlah harga bahan Rp 2,796,106

0.097 Rp 80,000 Rp 7,778


0.097 Rp 100,000 Rp 9,722
0.049 Rp 120,000 Rp 5,833
0.005 Rp 125,000 Rp 608
Jumlah harga upah tenaga kerja Rp 23,941
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 2,820,047

1.000 Rp 12,394,320 Rp 12,394,320


1.000 Rp 247,886 Rp 247,886
Jumlah harga bahan Rp 12,642,206
0.097 Rp 80,000 Rp 7,778
0.097 Rp 100,000 Rp 9,722
0.049 Rp 120,000 Rp 5,833
0.005 Rp 125,000 Rp 608
Jumlah harga upah tenaga kerja Rp 23,941
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 12,666,147

1.000 Rp 3,943,200 Rp 3,943,200


1.000 Rp 78,864 Rp 78,864
Jumlah harga bahan Rp 4,022,064

0.097 Rp 80,000 Rp 7,778


0.097 Rp 100,000 Rp 9,722
0.049 Rp 120,000 Rp 5,833
0.005 Rp 125,000 Rp 608
Jumlah harga upah tenaga kerja Rp 23,941
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 4,046,005

1.000 Rp 6,064,800 Rp 6,064,800


1.000 Rp 121,296 Rp 121,296
Jumlah harga bahan Rp 6,186,096

0.097 Rp 80,000 Rp 7,778


0.097 Rp 100,000 Rp 9,722
0.049 Rp 120,000 Rp 5,833
0.005 Rp 125,000 Rp 608
Jumlah harga upah tenaga kerja Rp 23,941
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 6,210,037

1.000 Rp 8,527,200 Rp 8,527,200


1.000 Rp 170,544 Rp 170,544
Jumlah harga bahan Rp 8,697,744

0.097 Rp 80,000 Rp 7,778


0.097 Rp 100,000 Rp 9,722
0.049 Rp 120,000 Rp 5,833
0.005 Rp 125,000 Rp 608
Jumlah harga upah tenaga kerja Rp 23,941
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 8,721,685
1.000 Rp 117,600 Rp 117,600
1.000 Rp 2,352 Rp 2,352
Jumlah harga bahan Rp 119,952

0.097 Rp 80,000 Rp 7,778


0.097 Rp 100,000 Rp 9,722
0.049 Rp 120,000 Rp 5,833
0.005 Rp 125,000 Rp 608
Jumlah harga upah tenaga kerja Rp 23,941
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 143,893

1.000 Rp 618,000 Rp 618,000


1.000 Rp 12,360 Rp 12,360
Jumlah harga bahan Rp 630,360

0.097 Rp 80,000 Rp 7,778


0.097 Rp 100,000 Rp 9,722
0.005 Rp 125,000 Rp 608
Jumlah harga upah tenaga kerja Rp 18,108
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 648,468

1.000 Rp 432,000 Rp 432,000


1.000 Rp 8,640 Rp 8,640
Jumlah harga bahan Rp 440,640

0.097 Rp 80,000 Rp 7,778


0.097 Rp 100,000 Rp 9,722
0.049 Rp 120,000 Rp 5,833
0.005 Rp 125,000 Rp 608
Jumlah harga upah tenaga kerja Rp 23,941
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 464,581

1.000 Rp 277,200 Rp 277,200


1.000 Rp 5,544 Rp 5,544
Jumlah harga bahan Rp 282,744

0.097 Rp 80,000 Rp 7,778


0.097 Rp 100,000 Rp 9,722
0.049 Rp 120,000 Rp 5,833
0.005 Rp 125,000 Rp 608
Jumlah harga upah tenaga kerja Rp 23,941
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 306,685
1.000 Rp 66,000,000 Rp 66,000,000
1.000 Rp 1,320,000 Rp 1,320,000
Jumlah harga bahan Rp 67,320,000

0.097 Rp 80,000 Rp 7,778


0.097 Rp 100,000 Rp 9,722
0.049 Rp 120,000 Rp 5,833
0.005 Rp 125,000 Rp 608
Jumlah harga upah tenaga kerja Rp 23,941
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 67,343,941

1.000 Rp 5,640,000 Rp 5,640,000


1.000 Rp 112,800 Rp 112,800
Jumlah harga bahan Rp 5,752,800

0.097 Rp 80,000 Rp 7,778


0.097 Rp 100,000 Rp 9,722
0.049 Rp 120,000 Rp 5,833
0.005 Rp 125,000 Rp 608
Jumlah harga upah tenaga kerja Rp 23,941
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 5,776,741

1.000 Rp 2,640,000 Rp 2,640,000


1.000 Rp 52,800 Rp 52,800
Jumlah harga bahan Rp 2,692,800

0.097 Rp 80,000 Rp 7,778


0.097 Rp 100,000 Rp 9,722
0.049 Rp 120,000 Rp 5,833
0.005 Rp 125,000 Rp 608
Jumlah harga upah tenaga kerja Rp 23,941
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 2,716,741

1.000 Rp 960,000 Rp 960,000


1.000 Rp 19,200 Rp 19,200
Jumlah harga bahan Rp 979,200

0.097 Rp 80,000 Rp 7,778


0.097 Rp 100,000 Rp 9,722
0.049 Rp 120,000 Rp 5,833
0.005 Rp 125,000 Rp 608
Jumlah harga upah tenaga kerja Rp 23,941
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 1,003,141

1.000 Rp 300,000 Rp 300,000


1.000 Rp 6,000 Rp 6,000
Jumlah harga bahan Rp 306,000

0.097 Rp 80,000 Rp 7,778


0.097 Rp 100,000 Rp 9,722
0.049 Rp 120,000 Rp 5,833
0.005 Rp 125,000 Rp 608
Jumlah harga upah tenaga kerja Rp 23,941
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 329,941

1.000 Rp 6,000,000 Rp 6,000,000


1.000 Rp 120,000 Rp 120,000
Jumlah harga bahan Rp 6,120,000

0.097 Rp 80,000 Rp 7,778


0.097 Rp 100,000 Rp 9,722
0.049 Rp 120,000 Rp 5,833
0.005 Rp 125,000 Rp 608
Jumlah harga upah tenaga kerja Rp 23,941
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 6,143,941

1.000 Rp 9,600,000 Rp 9,600,000


1.000 Rp 192,000 Rp 192,000
Jumlah harga bahan Rp 9,792,000

0.097 Rp 80,000 Rp 7,778


0.097 Rp 100,000 Rp 9,722
0.049 Rp 120,000 Rp 5,833
0.005 Rp 125,000 Rp 608
Jumlah harga upah tenaga kerja Rp 23,941
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 9,815,941

1.000 Rp 9,600,000 Rp 9,600,000


1.000 Rp 192,000 Rp 192,000
Jumlah harga bahan Rp 9,792,000
0.097 Rp 80,000 Rp 7,778
0.097 Rp 100,000 Rp 9,722
0.049 Rp 120,000 Rp 5,833
0.005 Rp 125,000 Rp 608
Jumlah harga upah tenaga kerja Rp 23,941
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 9,815,941

1.000 Rp 4,800,000 Rp 4,800,000


1.000 Rp 96,000 Rp 96,000
Jumlah harga bahan Rp 4,896,000

0.097 Rp 80,000 Rp 7,778


0.097 Rp 100,000 Rp 9,722
0.049 Rp 120,000 Rp 5,833
0.005 Rp 125,000 Rp 608
Jumlah harga upah tenaga kerja Rp 23,941
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 4,919,941

1.000 Rp 19,200,000 Rp 19,200,000


1.000 Rp 384,000 Rp 384,000
Jumlah harga bahan Rp 19,584,000

0.097 Rp 80,000 Rp 7,778


0.097 Rp 100,000 Rp 9,722
0.049 Rp 120,000 Rp 5,833
0.005 Rp 125,000 Rp 608
Jumlah harga upah tenaga kerja Rp 23,941
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 19,607,941

1.000 Rp 8,400,000 Rp 8,400,000


1.000 Rp 168,000 Rp 168,000
Jumlah harga bahan Rp 8,568,000

0.097 Rp 80,000 Rp 7,778


0.097 Rp 100,000 Rp 9,722
0.049 Rp 120,000 Rp 5,833
0.005 Rp 125,000 Rp 608
Jumlah harga upah tenaga kerja Rp 23,941
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 8,591,941
1.000 Rp 4,704,000 Rp 4,704,000
1.000 Rp 94,080 Rp 94,080
Jumlah harga bahan Rp 4,798,080

0.097 Rp 80,000 Rp 7,778


0.097 Rp 100,000 Rp 9,722
0.049 Rp 120,000 Rp 5,833
0.005 Rp 125,000 Rp 608
Jumlah harga upah tenaga kerja Rp 23,941
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 4,822,021

1.000 Rp 1,428,000 Rp 1,428,000


1.000 Rp 28,560 Rp 28,560
Jumlah harga bahan Rp 1,456,560

0.097 Rp 80,000 Rp 7,778


0.097 Rp 100,000 Rp 9,722
0.049 Rp 120,000 Rp 5,833
0.005 Rp 125,000 Rp 608
Jumlah harga upah tenaga kerja Rp 23,941
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 1,480,501

1.000 Rp 65,000 Rp 65,000


1.000 Rp 1,300 Rp 1,300
Jumlah harga bahan Rp 66,300

0.097 Rp 80,000 Rp 7,778


0.097 Rp 100,000 Rp 9,722
0.049 Rp 120,000 Rp 5,833
0.005 Rp 125,000 Rp 608
Jumlah harga upah tenaga kerja Rp 23,941
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 90,241

1.000 Rp 15,600 Rp 15,600


1.000 Rp 312 Rp 312
Jumlah harga bahan Rp 15,912

0.097 Rp 80,000 Rp 7,778


0.097 Rp 100,000 Rp 9,722
0.049 Rp 120,000 Rp 5,833
0.005 Rp 125,000 Rp 608
Jumlah harga upah tenaga kerja Rp 23,941
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 39,853

1.000 Rp 15,120 Rp 15,120


1.000 Rp 302 Rp 302
Jumlah harga bahan Rp 15,422

0.097 Rp 80,000 Rp 7,778


0.097 Rp 100,000 Rp 9,722
0.049 Rp 120,000 Rp 5,833
0.005 Rp 125,000 Rp 608
Jumlah harga upah tenaga kerja Rp 23,941
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 39,363

1.000 Rp 18,720 Rp 18,720


1.000 Rp 374 Rp 374
Jumlah harga bahan Rp 19,094

0.097 Rp 80,000 Rp 7,778


0.097 Rp 100,000 Rp 9,722
0.049 Rp 120,000 Rp 5,833
0.005 Rp 125,000 Rp 608
Jumlah harga upah tenaga kerja Rp 23,941
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 43,035

1.000 Rp 58,800 Rp 58,800


1.000 Rp 1,176 Rp 1,176
Jumlah harga bahan Rp 59,976

0.097 Rp 80,000 Rp 7,778


0.097 Rp 100,000 Rp 9,722
0.049 Rp 120,000 Rp 5,833
0.005 Rp 125,000 Rp 608
Jumlah harga upah tenaga kerja Rp 23,941
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 83,917

1.000 Rp 504,000 Rp 504,000


1.000 Rp 10,080 Rp 10,080
Jumlah harga bahan Rp 514,080

0.097 Rp 80,000 Rp 7,778


0.097 Rp 100,000 Rp 9,722
0.049 Rp 120,000 Rp 5,833
0.005 Rp 125,000 Rp 608
Jumlah harga upah tenaga kerja Rp 23,941
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 538,021

1.000 Rp 756,000 Rp 756,000


1.000 Rp 15,120 Rp 15,120
Jumlah harga bahan Rp 771,120

0.097 Rp 80,000 Rp 7,778


0.097 Rp 100,000 Rp 9,722
0.049 Rp 120,000 Rp 5,833
0.005 Rp 125,000 Rp 608
Jumlah harga upah tenaga kerja Rp 23,941
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 795,061

1.000 Rp 6,720,000 Rp 6,720,000


1.000 Rp 134,400 Rp 134,400
Jumlah harga bahan Rp 6,854,400

0.097 Rp 80,000 Rp 7,778


0.097 Rp 100,000 Rp 9,722
0.049 Rp 120,000 Rp 5,833
0.005 Rp 125,000 Rp 608
Jumlah harga upah tenaga kerja Rp 23,941
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 6,878,341

1.050 Rp 2,640 Rp 2,772


1.050 Rp 600 Rp 630
0.050 Rp 7,200 Rp 360
1.000 Rp 188 Rp 188
Jumlah harga bahan Rp 3,950

0.014 Rp 80,000 Rp 1,111


0.014 Rp 100,000 Rp 1,389
0.007 Rp 120,000 Rp 833
0.001 Rp 125,000 Rp 87
Jumlah harga upah tenaga kerja Rp 3,420
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 7,370

1.050 Rp 31,200 Rp 32,760


1.050 Rp 600 Rp 630
0.050 Rp 7,200 Rp 360
1.000 Rp 1,688 Rp 1,688
Jumlah harga bahan Rp 35,438

0.031 Rp 80,000 Rp 2,444


0.031 Rp 100,000 Rp 3,056
0.015 Rp 120,000 Rp 1,833
0.002 Rp 125,000 Rp 191
Jumlah harga upah tenaga kerja Rp 7,524
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 42,962

1.050 Rp 64,800 Rp 68,040


1.050 Rp 600 Rp 630
0.050 Rp 7,200 Rp 360
1.000 Rp 3,452 Rp 3,452
Jumlah harga bahan Rp 72,482

0.042 Rp 80,000 Rp 3,333


0.042 Rp 100,000 Rp 4,167
0.021 Rp 120,000 Rp 2,500
0.002 Rp 125,000 Rp 260
Jumlah harga upah tenaga kerja Rp 10,260
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 82,742

1.050 Rp 199,200 Rp 209,160


1.050 Rp 600 Rp 630
0.050 Rp 7,200 Rp 360
1.000 Rp 10,508 Rp 10,508
Jumlah harga bahan Rp 220,658

0.053 Rp 80,000 Rp 4,222


0.053 Rp 100,000 Rp 5,278
0.026 Rp 120,000 Rp 3,167
0.003 Rp 125,000 Rp 330
Jumlah harga upah tenaga kerja Rp 12,997
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 233,654

1.050 Rp 248,400 Rp 260,820


1.050 Rp 600 Rp 630
0.050 Rp 7,200 Rp 360
1.000 Rp 13,091 Rp 13,091
Jumlah harga bahan Rp 274,901

0.056 Rp 80,000 Rp 4,444


0.056 Rp 100,000 Rp 5,556
0.028 Rp 120,000 Rp 3,333
0.003 Rp 125,000 Rp 347
Jumlah harga upah tenaga kerja Rp 13,681
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 288,581

1.050 Rp 18,000 Rp 18,900


1.050 Rp 600 Rp 630
0.050 Rp 7,200 Rp 360
1.000 Rp 995 Rp 995
Jumlah harga bahan Rp 20,885

0.050 Rp 80,000 Rp 4,000


0.050 Rp 100,000 Rp 5,000
0.025 Rp 120,000 Rp 3,000
0.003 Rp 125,000 Rp 313
Jumlah harga upah tenaga kerja Rp 12,313
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 33,197

1.050 Rp 27,600 Rp 28,980


1.050 Rp 600 Rp 630
0.050 Rp 7,200 Rp 360
1.000 Rp 1,499 Rp 1,499
Jumlah harga bahan Rp 31,469

0.053 Rp 80,000 Rp 4,222


0.053 Rp 100,000 Rp 5,278
0.026 Rp 120,000 Rp 3,167
0.003 Rp 125,000 Rp 330
Jumlah harga upah tenaga kerja Rp 12,997
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 44,465

1.050 Rp 36,000 Rp 37,800


1.050 Rp 600 Rp 630
0.050 Rp 7,200 Rp 360
1.000 Rp 1,940 Rp 1,940
Jumlah harga bahan Rp 40,730

0.056 Rp 80,000 Rp 4,444


0.056 Rp 100,000 Rp 5,556
0.028 Rp 120,000 Rp 3,333
0.003 Rp 125,000 Rp 347
Jumlah harga upah tenaga kerja Rp 13,681
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 54,410

1.050 Rp 50,400 Rp 52,920


1.050 Rp 600 Rp 630
0.050 Rp 7,200 Rp 360
1.000 Rp 2,696 Rp 2,696
Jumlah harga bahan Rp 56,606

0.058 Rp 80,000 Rp 4,667


0.058 Rp 100,000 Rp 5,833
0.029 Rp 120,000 Rp 3,500
0.003 Rp 125,000 Rp 365
Jumlah harga upah tenaga kerja Rp 14,365
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 70,970

1.050 Rp 80,400 Rp 84,420


1.050 Rp 600 Rp 630
0.050 Rp 7,200 Rp 360
1.000 Rp 4,271 Rp 4,271
Jumlah harga bahan Rp 89,681

0.061 Rp 80,000 Rp 4,889


0.061 Rp 100,000 Rp 6,111
0.031 Rp 120,000 Rp 3,667
0.003 Rp 125,000 Rp 382
Jumlah harga upah tenaga kerja Rp 15,049
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 104,729

1.050 Rp 94,800 Rp 99,540


1.050 Rp 600 Rp 630
0.050 Rp 7,200 Rp 360
1.000 Rp 5,027 Rp 5,027
Jumlah harga bahan Rp 105,557

0.064 Rp 80,000 Rp 5,111


0.064 Rp 100,000 Rp 6,389
0.032 Rp 120,000 Rp 3,833
0.003 Rp 125,000 Rp 399
Jumlah harga upah tenaga kerja Rp 15,733
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 121,289

1.050 Rp 201,600 Rp 211,680


1.050 Rp 600 Rp 630
0.050 Rp 7,200 Rp 360
1.000 Rp 10,634 Rp 10,634
Jumlah harga bahan Rp 223,304
0.069 Rp 80,000 Rp 5,556
0.069 Rp 100,000 Rp 6,944
0.035 Rp 120,000 Rp 4,167
0.003 Rp 125,000 Rp 434
Jumlah harga upah tenaga kerja Rp 17,101
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 240,404

1.050 Rp 268,800 Rp 282,240


1.050 Rp 600 Rp 630
0.050 Rp 7,200 Rp 360
1.000 Rp 14,162 Rp 14,162
Jumlah harga bahan Rp 297,392

0.072 Rp 80,000 Rp 5,778


0.072 Rp 100,000 Rp 7,222
0.036 Rp 120,000 Rp 4,333
0.004 Rp 125,000 Rp 451
Jumlah harga upah tenaga kerja Rp 17,785
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 315,176

1.050 Rp 382,800 Rp 401,940


1.050 Rp 600 Rp 630
0.050 Rp 7,200 Rp 360
1.000 Rp 20,147 Rp 20,147
Jumlah harga bahan Rp 423,077

0.075 Rp 80,000 Rp 6,000


0.075 Rp 100,000 Rp 7,500
0.038 Rp 120,000 Rp 4,500
0.004 Rp 125,000 Rp 469
Jumlah harga upah tenaga kerja Rp 18,469
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 441,545

1.050 Rp 526,800 Rp 553,140


1.050 Rp 600 Rp 630
0.050 Rp 7,200 Rp 360
1.000 Rp 27,707 Rp 27,707
Jumlah harga bahan Rp 581,837

0.078 Rp 80,000 Rp 6,222


0.078 Rp 100,000 Rp 7,778
0.039 Rp 120,000 Rp 4,667
0.004 Rp 125,000 Rp 486
Jumlah harga upah tenaga kerja Rp 19,153
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 600,989

1.050 Rp 663,600 Rp 696,780


1.050 Rp 600 Rp 630
0.050 Rp 7,200 Rp 360
1.000 Rp 34,889 Rp 34,889
Jumlah harga bahan Rp 732,659

0.081 Rp 80,000 Rp 6,444


0.081 Rp 100,000 Rp 8,056
0.040 Rp 120,000 Rp 4,833
0.004 Rp 125,000 Rp 503
Jumlah harga upah tenaga kerja Rp 19,837
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 752,495

1.050 Rp 16,800 Rp 17,640


1.050 Rp 600 Rp 630
0.050 Rp 7,200 Rp 360
1.000 Rp 932 Rp 932
Jumlah harga bahan Rp 19,562

0.042 Rp 80,000 Rp 3,333


0.042 Rp 100,000 Rp 4,167
0.021 Rp 120,000 Rp 2,500
0.002 Rp 125,000 Rp 260
Jumlah harga upah tenaga kerja Rp 10,260
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 29,822

1.050 Rp 16,800 Rp 17,640


1.050 Rp 600 Rp 630
0.050 Rp 7,200 Rp 360
1.000 Rp 932 Rp 932
Jumlah harga bahan Rp 19,562

0.044 Rp 80,000 Rp 3,556


0.044 Rp 100,000 Rp 4,444
0.022 Rp 120,000 Rp 2,667
0.002 Rp 125,000 Rp 278
Jumlah harga upah tenaga kerja Rp 10,944
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 30,506
1.050 Rp 720,000 Rp 756,000
1.050 Rp 600 Rp 630
0.050 Rp 7,200 Rp 360
1.000 Rp 37,850 Rp 37,850
Jumlah harga bahan Rp 794,840

0.097 Rp 80,000 Rp 7,778


0.097 Rp 100,000 Rp 9,722
0.049 Rp 120,000 Rp 5,833
0.005 Rp 125,000 Rp 608
Jumlah harga upah tenaga kerja Rp 23,941
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 818,780

1.050 Rp 1,020,000 Rp 1,071,000


1.050 Rp 600 Rp 630
0.050 Rp 7,200 Rp 360
1.000 Rp 53,600 Rp 53,600
Jumlah harga bahan Rp 1,125,590

0.194 Rp 80,000 Rp 15,556


0.194 Rp 100,000 Rp 19,444
0.097 Rp 120,000 Rp 11,667
0.010 Rp 125,000 Rp 1,215
Jumlah harga upah tenaga kerja Rp 47,882
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 1,173,471

1.050 Rp 600,000 Rp 630,000


1.050 Rp 600 Rp 630
0.050 Rp 7,200 Rp 360
1.000 Rp 31,550 Rp 31,550
Jumlah harga bahan Rp 662,540

0.097 Rp 80,000 Rp 7,778


0.097 Rp 100,000 Rp 9,722
0.049 Rp 120,000 Rp 5,833
0.005 Rp 125,000 Rp 608
Jumlah harga upah tenaga kerja Rp 23,941
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 686,480

1.050 Rp 177,600 Rp 186,480


1.050 Rp 600 Rp 630
0.050 Rp 7,200 Rp 360
1.000 Rp 9,374 Rp 9,374
Jumlah harga bahan Rp 196,844

0.097 Rp 80,000 Rp 7,778


0.097 Rp 100,000 Rp 9,722
0.049 Rp 120,000 Rp 5,833
0.005 Rp 125,000 Rp 608
Jumlah harga upah tenaga kerja Rp 23,941
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 220,784

1.050 Rp 270,000 Rp 283,500


1.050 Rp 600 Rp 630
0.050 Rp 7,200 Rp 360
1.000 Rp 14,225 Rp 14,225
Jumlah harga bahan Rp 298,715

0.097 Rp 80,000 Rp 7,778


0.097 Rp 100,000 Rp 9,722
0.049 Rp 120,000 Rp 5,833
0.005 Rp 125,000 Rp 608
Jumlah harga upah tenaga kerja Rp 23,941
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 322,655

1.050 Rp 366,000 Rp 384,300


1.050 Rp 600 Rp 630
0.050 Rp 7,200 Rp 360
1.000 Rp 19,265 Rp 19,265
Jumlah harga bahan Rp 404,555

0.097 Rp 80,000 Rp 7,778


0.097 Rp 100,000 Rp 9,722
0.049 Rp 120,000 Rp 5,833
0.005 Rp 125,000 Rp 608
Jumlah harga upah tenaga kerja Rp 23,941
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 428,495

1.050 Rp 1,451,160 Rp 1,523,718


1.050 Rp 600 Rp 630
0.050 Rp 7,200 Rp 360
1.000 Rp 76,235 Rp 76,235
Jumlah harga bahan Rp 1,600,943

0.083 Rp 80,000 Rp 6,667


0.083 Rp 100,000 Rp 8,333
0.042 Rp 120,000 Rp 5,000
0.004 Rp 125,000 Rp 521
Jumlah harga upah tenaga kerja Rp 20,521
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 1,621,464

1.050 Rp 253,560 Rp 266,238


1.050 Rp 600 Rp 630
0.050 Rp 7,200 Rp 360
1.000 Rp 13,361 Rp 13,361
Jumlah harga bahan Rp 280,589

0.083 Rp 80,000 Rp 6,667


0.083 Rp 100,000 Rp 8,333
0.042 Rp 120,000 Rp 5,000
0.004 Rp 125,000 Rp 521
Jumlah harga upah tenaga kerja Rp 20,521
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 301,110

1.050 Rp 760,680 Rp 798,714


1.050 Rp 600 Rp 630
0.050 Rp 7,200 Rp 360
1.000 Rp 39,985 Rp 39,985
Jumlah harga bahan Rp 839,689

0.167 Rp 80,000 Rp 13,333


0.167 Rp 100,000 Rp 16,667
0.083 Rp 120,000 Rp 10,000
0.008 Rp 125,000 Rp 1,042
Jumlah harga upah tenaga kerja Rp 41,042
(Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) 880,731