You are on page 1of 2

1st CORRIGENDA & ADDENDA

FOR SCHEDULE OF RATES OF PWD (W.B)-2015wef 01.12.2015


Volume-I: (For Building Works, Materials & Labour)

(Aj CORRIGENDA Date: 15.01.2016

Chapter, Description of Item


Page No. Reference & Item Remarks
No. In place of Please Read

Steel Materials Steel Materials Except Description of the


i) Mild Steel Rods i) Mild Steel Rods Item, all other columns
(Fe 250) (Fe 250) remain unchanged
(SAIUTATAIRINL) (SAIUTATAIRINUJSWUJSPL)

ii) Tor Steel Rods/HYSD/Fe 415/Fe 500/Fe 500 D ii) Tor Steel Rods/HYSD/Fe 415/Fe 500/Fe 500 D
Annexure-I, (SAIUTATAIRINL) (SAIUTAT AlRINUJSWUJSPL)
308 Table -1.1
Steel Materials Steel Materials
Item No-2
i) Mild Steel Rods i) Mild Steel Rods
(Fe 250) (Fe 250)
(Other than SAIUTATAIRINL) (Other than SAIUTATAIRINUJSWUJSPL)

ii) Tor Steel Rods/HYSD/Fe 415/Fe 500/Fe 500 D ii) Tor Steel Rods/HYSD/Fe 415/Fe 500/Fe 500 D
(Other than SAIUTATAIRINL) (Other than SAIUTATAIRINUJSWUJSPL)

Reinforcement for reinforced concrete work in all Reinforcementfor reinforced concrete work in all Except Description of the
sorts ............ complete as per drawing and direction. sorts ............ complete as per drawing and direction. Item, all other columns
(a) For works infoundation, basement and upto roof of (a) For works infoundation, basement and upto roof of remain unchanged
Item No -15 a (i) groundjloor/upto 4 m groundjloor/upto 4 m
28
ofChapter-C
(i) Tor steel/Mild Steel (i) Tor steel/Mild Steel
I. SAIU TATA/RINL I. SAIU TATA/RINUJSWUJSPL
II. Other than SAIU TATA/RINL II. Other than SAIU TATA/RINUJSWUJSPL

R.C. weather board (1: 1.5:3) with stone .." ......... complete in R.C. weather board (1:1.5:3) with stone ............. complete Except Description of the
ground jloor. in groundjloor. Item, all other columns
Item No. 39 remain unchanged
33 50 mm thick using steel of 50 mm thick using steel of
ofChapter-C
I. SAIU TATA/RINL I. SAIU TATAIRINUJSWUJSPL
II. Other than SA1U TATA/RINL II. Other than SAIU TATA/RINUJSWUJSPL

Page-1
Chapter, Description of Item
Page No. Reference & Item Remarks
No. In place of Please Read

R.C. shelves (1:1.5:3) either precast or cast in situ with stone RC. shelves (1:1.5:3) either precast or cast in situ with Except Description of the
chips ......... as necessary complete. stone chips ......... as necessary complete. Item, all other columns
In groundjloor In groundjloor remain unchanged

Item No. 40 a), 40 (a) 50 mm. Thick panels using steel of - (a) 50 mm. Thick panels using steel of -
34 b) 1. SAIU TATAlRlNL 1. SAIU TATAIRlNUJSWUJSPL
II Other than SAIU TATAIRlNL II Other than SAIU TATAlRlNUJSWUJSPL
ofChapter-C
(b) 37.5 mm. Thick panels using steel of - (b) 37.5 mm. Thick panels using steel of -
t. SAIUTATAlRlNL I. SAIU TATAIRlNUJSWUJSPL
II. Other than SAIU TATAlRlNL II Other than SAIU TATAlRlNUJSWLlJSPL

Supplying, hoisting.fitting and fIXing R C. C. precast thin Supplying.hoisting.fitting and fixing R.C.C. precast thin Except Description of the
lintels ......... same when directed lintels ......... same when directed Item, all other columns
Item No:43 remain unchanged.
35 I. SAIU TATAIRlNL I. SAIU TATAlRlNLlJSWLlJSPL
ofChapter-C
II Other than SAIU TATAIRlNL II Other than SAIU TATAlRlNUJSWLlJSPL

~~(, r:
....£2 J...
(TAPASHKR. DEY)
\5"' 0 I. ').f)'" ~1.2.0Ib
(MALAY GHOSH) 1S'
(DEBASHISROy)
Superintending Engineer Superintending Engineer, Engineer-in-Chief & E. O. Secretary & Chief
Bridge Planning Circle, P.W.(R) Dte. & Planning and Monitoring Circle, P.W. Ote. & Engineer (HQ)
Jt. Convenor of the Combined Schedule Convenor of the Combined Schedule Public Works Directorate &
Committee of PWD Committee of PWD Chairman of the Combined Schedule
Committee of PWD

Page - 2

You might also like