Work Tracking No

RB - 11 Replace Boiler Bank & Economizer I - II


Title SAP Doc . No

No Work Description Unit Qty Unit Price ( Rp ) Price ( Rp ) Remark


Wage Material Wage Material Sub Total
II Hot Insulation Work
A Dismantle Works
1 No Used
a Hot Insulation - Rockwool 200 T M2 1,200 140,000 168,000,000 168,000,000
b Cover Corrugated SUS 304 - 0.8 mm T M2 2,400 120,000 288,000,000 288,000,000
c Cover Flat SUS 304 - 0.8 mm T M2 150 100,000 15,000,000 15,000,000
2 Re - Used
a Hot Insulation - Rockwool 200 T M2 1,800 180,000 324,000,000 324,000,000
b Cover Corrugated SUS 304 - 0.8 mm T M2 3,600 140,000 504,000,000 504,000,000

B Fabrication & Installation Works


1 Use to Old Material
a Hot Insulation - Rockwool 200 T M2 1,800 180,000 324,000,000 324,000,000
b Cover Corrugated SUS 304 - 0.8 mm T M2 3,600 140,000 504,000,000 504,000,000
2 Use to New Material
a Hot Insulation - Rockwool 200 T M2 1,200 160,000 740,000 192,000,000 888,000,000 1,080,000,000 Material supplied by Contractor
b Cover Corrugated SUS 304 - 0.8 mm T M2 2,400 140,000 750,000 336,000,000 1,800,000,000 2,136,000,000 Material supplied by Contractor
c Cover Flat SUS 304 - 0.8 mm T M2 150 130,000 650,000 19,500,000 97,500,000 117,000,000 Material supplied by Contractor

TOTAL 2,674,500,000 2,785,500,000


GRAND TOTAL 5,460,000,000